Forwards Insp Rept 50-346/96-06 on 960815-1009 & Notice of Violation
ML20133C933
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/27/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20133C936 List:
References
EA-96-230, NUDOCS 9701080148
Download: ML20133C933 (3)


See also: IR 05000346/1996006

Text

-

.

. - - - .. .

. .

- .._..

. - -

.. - - -

.>

Tcb} beB

.

...

,

1

December 27, 1996

EA No.96-230

l

Mr. John K. Wood

Vice President - Nuclear

j

Davis-Besse Nuclear Power Station

j

Centerior Service Company

.

'

.

5501 North State Route 2

!

Oak Harbor. OH 43449

i

'

SUBJECT:

ROUTINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/96006):

NOTICE OF VIOLATION

,

I

Dear Mr. Wood:

On October 9,1996, the NRC completed an inspection at your Davis-Besse site.

The enclosed report presents the results of that inspection.

Activities conducted at the plant were observed to be predominantly Jerformed

1

in a controlled manner and in accordance with approved procedures.

10 wever,

.three issues' associated with test control were identified by NRC inspectors

that indicated a less than rigorous implementation of surveillance activities

and are considered, in the aggregate, a violation of NRC requirements.

Specifically:

1) a test deficiency was improperly documented and . initially

1

dispositioned, 2) inadequate adherence to test procedure requirements resulted-

.

in improper stroke timing of a' containment spray valve, and 3) inadequate

control of soluble plastic used on floor drains in the auxiliary building

i

negative pressure boundary potentially invalidated one or more emergency.

'

ventilation system drawdown tests.

.

The violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding the violation are described in detail in the

enclosed report.

Please note that you are required to respond-to this letter

'

and should follow the instructions specified in the enclosed Notice when

preparing ~your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

In addition, a followup of a plant employee's failure to properly complete

required surveillance testing of emergency battery lights was conducted during

this inspection. The NRC Office of Investigations (01) had previously

reviewed this matter and determined that the employee had violated 10 CFR 50.5

due to. deliberate misconduct on his part. As such, a Notice of Violation was

'(

L

issued to the individual (who has since resigned) under separate cover.

(

Because the problem was originally identified by your staff, and appropriate

followup actions were taken by Davis-Besse, this matter was considered a non-

l

cited violation against the facility.

!

9701080148 961227

b'

PDR

ADOCK 05000346

g

PDR

i

l-

l

-_...__ _ .__ _ . _ ___._._ .

_- _

_ . . _ _ _ _ _ . _ _ _ _ _ . . . _ _ _ _

.

l

'

.

.

J. K. Wood

-2-

,

I-

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room

l

(PDR).

l

Sincerely,

l

l-

!

/s/ J. L. Caldwell

l

James L. Caldwell, Director

Division of Reactor Projects

Docket No.:

50-346

l

License No.:

NPF-3

Enclosures:

Notice of Violation

l

Inspection Report 50-346/96006

i

'

l

cc w/ encl:

J. P. Stetz, Senior

l

'

Vice President-Nuclear-

l

J. H. Lash. Plant Manager

J. L. Freels, Manager

Regulatory Affairs

l

State Liaison Officer, State

i

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

l

Public Utilities Commission

i

l

Docket File w/ encl

DRP w/ encl

j

(

PUBLIC IE-01

RIII PRR e/ encl

'

l

OC/LFDCB w/ encl

IPAS (E-Mail) w/ encl

j

SRI Davis-Besse w/ enc 1

RMB/ FEES w/o encl

'

Project Manager, NRR w/ encl

A. B. Beach w/ encl

B. L. Burgess w/ encl

PLEASE SEE ATTACHED CONCURRENCES

To receive a copy of this document. indicate in the box "C" = Copy without

attach / encl "E" = Copy with attach / encl

"N" = No copy

0FFICE

RIII

RIII

RIII

RIIIo

l-

NAME

Schweibinz

Burgess (Cyr

Jacobson

Cal

Ltr. Sec M1.6)

!

DATE

12/

/96

12/

/96

12/

/96

12/d7/96

0FFICIAL RECORD COPY

,

N (. .

s

e

,

r

ey .

<

,-

-

-

-.

.

..

---

__

_

__

_

l

.

i

l

l

J. K. Wood

-2-

i

l

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

l

this letter and its enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

1

l

James L. Caldwell, Acting Director

j

Division of Reactor Projects

Docket No.:

50-346

License No.: NPF-3

Enclosures: Notice of Violation

Inspection Report 50-346/96006

cc w/ encl:

J. P. Stetz, Senior

Vice President-Nuclear

'

J. H. Lash, Plant Manager

J. L. Freels, Manager

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Docket File w/ encl

DRP w/ encl

PUBLIC IE-01

RIII PRR e/ encl

OC/LFDCB w/ encl

IPAS (E-Mail) w/ enc 1

SRI Davis-Besse w/ encl

RMB/ FEES w/o encl

Project Manager, NRR w/ encl

A. B. Beach w/ encl

B. L. Burgess w/enci

To receive a copy of this document, indicate in the box "C" = Copy without

attach / encl "E" = Copy with attach / encl,

"N" = No copy

0FFICE

RIII

N

RIII

J /[ E

RIII

C

RIM ,

C

'

_,

_,

NAME

SchweibN

B$r#Ys#hr

Jacob N p

C 1hd1

g s

l

Ltr, Sec M1.6)

J#

DATE

11/ dF 96

11/2 7 /96

11/ K /96

N//li /96

'

l

/

'

0FFICIAL RECORD COPY

l

l