ML20133C933
| ML20133C933 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/27/1996 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20133C936 | List: |
| References | |
| EA-96-230, NUDOCS 9701080148 | |
| Download: ML20133C933 (3) | |
See also: IR 05000346/1996006
Text
-
.
. - - - .. .
. .
- .._..
. - -
.. - - -
.>
Tcb} beB
.
...
,
1
December 27, 1996
l
Mr. John K. Wood
Vice President - Nuclear
j
Davis-Besse Nuclear Power Station
j
Centerior Service Company
.
'
.
5501 North State Route 2
!
Oak Harbor. OH 43449
i
'
SUBJECT:
ROUTINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/96006):
,
I
Dear Mr. Wood:
On October 9,1996, the NRC completed an inspection at your Davis-Besse site.
The enclosed report presents the results of that inspection.
Activities conducted at the plant were observed to be predominantly Jerformed
1
in a controlled manner and in accordance with approved procedures.
10 wever,
.three issues' associated with test control were identified by NRC inspectors
that indicated a less than rigorous implementation of surveillance activities
and are considered, in the aggregate, a violation of NRC requirements.
Specifically:
1) a test deficiency was improperly documented and . initially
1
dispositioned, 2) inadequate adherence to test procedure requirements resulted-
.
in improper stroke timing of a' containment spray valve, and 3) inadequate
control of soluble plastic used on floor drains in the auxiliary building
i
negative pressure boundary potentially invalidated one or more emergency.
'
ventilation system drawdown tests.
.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the
enclosed report.
Please note that you are required to respond-to this letter
'
and should follow the instructions specified in the enclosed Notice when
preparing ~your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In addition, a followup of a plant employee's failure to properly complete
required surveillance testing of emergency battery lights was conducted during
this inspection. The NRC Office of Investigations (01) had previously
reviewed this matter and determined that the employee had violated 10 CFR 50.5
due to. deliberate misconduct on his part. As such, a Notice of Violation was
'(
L
issued to the individual (who has since resigned) under separate cover.
(
Because the problem was originally identified by your staff, and appropriate
followup actions were taken by Davis-Besse, this matter was considered a non-
l
cited violation against the facility.
!
9701080148 961227
b'
ADOCK 05000346
g
i
l-
l
-_...__ _ .__ _ . _ ___._._ .
_- _
_ . . _ _ _ _ _ . _ _ _ _ _ . . . _ _ _ _
.
l
'
.
.
J. K. Wood
-2-
,
I-
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
l
(PDR).
l
Sincerely,
l
l-
!
/s/ J. L. Caldwell
l
James L. Caldwell, Director
Division of Reactor Projects
Docket No.:
50-346
l
License No.:
Enclosures:
l
Inspection Report 50-346/96006
i
'
l
cc w/ encl:
J. P. Stetz, Senior
l
'
Vice President-Nuclear-
l
J. H. Lash. Plant Manager
J. L. Freels, Manager
Regulatory Affairs
l
State Liaison Officer, State
i
of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
l
Public Utilities Commission
i
l
Docket File w/ encl
DRP w/ encl
j
(
PUBLIC IE-01
RIII PRR e/ encl
'
l
OC/LFDCB w/ encl
IPAS (E-Mail) w/ encl
j
SRI Davis-Besse w/ enc 1
RMB/ FEES w/o encl
'
Project Manager, NRR w/ encl
A. B. Beach w/ encl
B. L. Burgess w/ encl
PLEASE SEE ATTACHED CONCURRENCES
To receive a copy of this document. indicate in the box "C" = Copy without
attach / encl "E" = Copy with attach / encl
"N" = No copy
0FFICE
RIII
RIII
RIII
RIIIo
l-
NAME
Schweibinz
Burgess (Cyr
Jacobson
Cal
Ltr. Sec M1.6)
!
DATE
12/
/96
12/
/96
12/
/96
12/d7/96
0FFICIAL RECORD COPY
,
N (. .
s
e
,
r
ey .
<
,-
-
-
-.
.
..
---
__
_
__
_
l
.
i
l
l
J. K. Wood
-2-
i
l
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
l
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
1
l
James L. Caldwell, Acting Director
j
Division of Reactor Projects
Docket No.:
50-346
License No.: NPF-3
Enclosures: Notice of Violation
Inspection Report 50-346/96006
cc w/ encl:
J. P. Stetz, Senior
Vice President-Nuclear
'
J. H. Lash, Plant Manager
J. L. Freels, Manager
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01
RIII PRR e/ encl
OC/LFDCB w/ encl
IPAS (E-Mail) w/ enc 1
SRI Davis-Besse w/ encl
RMB/ FEES w/o encl
Project Manager, NRR w/ encl
A. B. Beach w/ encl
B. L. Burgess w/enci
To receive a copy of this document, indicate in the box "C" = Copy without
attach / encl "E" = Copy with attach / encl,
"N" = No copy
0FFICE
RIII
N
RIII
J /[ E
RIII
C
RIM ,
C
'
_,
_,
NAME
SchweibN
B$r#Ys#hr
Jacob N p
C 1hd1
g s
l
Ltr, Sec M1.6)
J#
DATE
11/ dF 96
11/2 7 /96
11/ K /96
N//li /96
'
l
/
'
0FFICIAL RECORD COPY
l
l