Forwards Insp Repts 50-424/85-40 & 50-425/85-31 on 850819-23 & Notice of Violation
ML20133C482
Person / Time
Site: Vogtle  
Issue date: 10/03/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20133C487 List:
References
NUDOCS 8510070375
Download: ML20133C482 (3)


See also: IR 05000424/1985040

Text

.

.

.

,

)4//nD

OCT 031989

Georgia Power Company

. ATTN: Mr. R. J. Kelly

V

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

REPORT NOS. 50-424/85-40 AND 50-425/85-31

On August 19 - 23, 1985, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The first violation described in the enclosed notice is similar to Violation

No. 424, 425/85-14-02 contained in a notice of violation sent to you with our

letter dated May 7, 1985.

Since "similar violations", as described in the NRC

Enforcement Policy, are of significant concern to the NRC, in your response,

please give particular attention to the identification and remedy of the root

cause of the violation so that its recurrence may be precluded.

Your Attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

(See page 2)

fogoopy g

4

0

.

' ZEo/

'

-

_

1.-

.

,

.

OCT 0 3 g';

Georgia Power Company-

2

Enclosures:

1.

Notice of Violation

2.

Inpsection Report Nos. 424/85-40

and 425/85-31

cc w/encls:

J . E. Conway, Senior Vice President

Nuclear Power

- g. O. Foster, Vice President

t

and General Manager Vogtle Project

J . H. Gregory, III, General

M. Manager,VogtleNuclearConstruction

Bockhold, Jr., Vogtle

Plant Manager

I T. Gucwa, Chief

Nuclear Engineer

v(uble A. Thomas,

Vice President-Licensing Vogtle

jProject

(4d Groover, Quality

Assurance Site Manager

dy W. Hayes, QA Manager

J. -T. Beckham, Vice President

d.&GeneralManager-Operations

A. Bailey, Project Licensing

Manager

dorgeF.Trowbridge,Esq.

Shaw, Pittman, Potts and Trowbridge

d ruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

drnestL.Blake,Jr.,Esq.

Shaw, Pittman, Potts and Trowbridge

damesE. Joiner,Troutman, Sanders,

Lockerman and Ashmore

t/amesG.Ledbetter, Commissioner

Department.of Human Resources

(Iharles H. Badger, Office of

Planning and Budget. Management

jReview Division

Jeppish Kirkland, III, Counsel

Office of the Consumer's Utility

jCouncil

@ uglas C. Teper, Georgians Against

l

Nuclear Energy

NaurieFowler,Esq.,LegalEnvironmental

Assistance Foundation

t/im Johnson, Executive Director

Educational Campaign for a Prosperous

Georgia.

cc w/encis:

(continuedonpage3)

.

-

-

-

-

-

- --

-

.

-

-

-

.

-

.

.

Georgia Power Company

3

.

OL'T 0 3196

jc w/encls:

A rton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

.

vtfr. Oscar H. Paris, Administrative Judge

.

Atomic Safety and Licensing Board Panel

dustave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board

Panel

bec w/encls:

Document Control Desk

State of Georgia

A . Reis, ELD

M Sinkule, RII

LNkCResidentInspector

.

__

-

flIf

1

j

RII/ff/

RF

RII

!

L fh

Wh

f

'

i

ARHp/85

f7

ownlee

rdt

/

GAHallstrom:es

lake

i

9/p

y

//85

i

8

9//4/85

/g1/85

d

!

t

>

h

i

-

- - -

- - - -

-

- - - - .

-

- -

-

-

-

. - - -

-

- -

-

- -

-

-

-

-

-

- - - - .