V 5 D M5 Mr. Anthony S. Kanicki, Jr.
RR fl 52 M l3 i
South Haven, MI 49090 License No. SOP-3160-1 Docket No. 55-h007 United States Nuclear Regulatory Commission ATT: Mr. James G. Keppler, Director Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Sir:
This letter is in response to your letter dated September 16, 1980 which contained a Notice of Violation requiring a response from me.
The Notice of Violation was related to the performance of a portion of a safety related i
Surveillance Procedure QO-2 which was not conducted in full compliance with the requirements of my Senior Operator License No. SOP 3160-1.
Because my signature appeared on the QO-2 Surveillance Procedure of f
August 19, 1980 as the authorizing Shift Supervisor, I must accept full i
responsibility for my actions and the events which followed and caused the
{
item of noncompliance.
5 During the past eleven years at this plant, I had, performed this Surveillance Procedure as a Licensed Operator many times and in the last three years as a Shift Supervisor I had authorized the performance of the QO-2 Surveillance Procedure during plant power operation previous to plant shutdown in September 1979 2
License Event Report 80-005 reported an apparent conflict between the surveillance requirements and equipment operability requirements of the
( br.
c.q... T. eTechnical4pecifidati.onsit.,.As.,a:@sult.;.the < prerequisites for.. Surveillance r -
i-Procedure QO-2 were changed to require that the plant be in a cold shutdown or refueling shutdown conditions prior to performance of the Surveillance Procedure.
In issuing two Surveillance Procedures on the morning of August 19, 1980 I read through and checked the first procedure and then noting that the second procedure title was QO-2 and because of my familiarity with this Surveillance Procedure in the past, I authorized performance of the procedure after a quick perfunctory check and failed to notice that the plant status requirement had been changed.'
Sincerely, fAnthony4 & a Q u.
)
. K nicki, Jr.V Plant Shift Supervisor I
Palisades Nuclear Plant i
8507200482 850509 PDR FOIA JONES85-106 PDR t
..