ML20133B333

From kanterella
Jump to navigation Jump to search

Proposed Changes to Tech Spec Section 5,adding Spec & Table Addressing Component Cyclic & Transient Limits & Changing Table Number in Tech Spec 6.10.2.e
ML20133B333
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/26/1985
From:
GEORGIA POWER CO.
To:
Shared Package
ML20133B331 List:
References
TAC-59308, NUDOCS 8508060142
Download: ML20133B333 (4)


Text

. - _ .

ATTACIDENT 4 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCIEAR PLANT UNIT 1 REQIEST TO REVISE TECHNICAL SPECIFICATIONS:

ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS The proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

i Remove Page Insert Page 5.0-2 5.0-2 5.0-3 6-20 6-20 l

h50%Og p g g P-

_ - . - . _ _ . __. ._ _ _ _ _ _ . _ _ , _ _ _ . _ . _ . ._.I

f .

3. -Fuel Storage Fuel in the Spent Fuel Pool shall have a maximum fuel loading of 15.2 grams of Uranium-235 per axial centimeter.

5.0.F. Seismic Design The reactor building and all engineered safeguard systems are designed for the design basis earthquake with a horizontal ground acceleration of 0.15 g.

The operating basis earthquake has a horizontal ground. acceleration of 0.08 g.

G. Component Cyclic or Transient Limit The Reacor Pressure Vessel is designed for and shall be maintained within the cyclic or transient limits of Table 5.0.G-1.

H. References

1. FSAR Section 4.2, Reactor Vessel and Appurtenances Mechanical Design
2. FSAR Section 5.2, Primary Containment System
3. FSAR Section 5.3, Secondary Containment System
4. FSAR Section 12.4.4, Governing Codes and Regulations
5. FSAR Section 10.3, Spent Fuel Storage
6. FSAR Section 10.2, New Fuel Storage l

l l

l 6

5.0-2

~ , ,,-__.-,.m.__.. . . - . _ ,_m -....__ _ , _ , m , , . . . , _ . - , ,

TABE 5.0.G-1 COMPONENT CYCLIC OR TRANSIENT LIMITS -

CYCLIC OR DESIGN CYCE COMPONENT TRANSIENT LIMIT OR TRANSIENT A. Reactor Pressure Vessel (Normal, Upset and Testing Conditions) 120 heatup and cooldown Cold Shutdown to 100% Rated Power 10,000 Reduction to 75% Rated Power 2,000 Reduction to 50% Rated Power 80 Loss of feedwater heater 195 Scram from 100% Rated Power 2- Improper start of cold recirculation loop

?

v

L  %'

ADMINISTRATIVE CINIROL REOCRD RETElffION (Contimed) c.. Records '2 radiation expoalre f r all indivi&als entering radiation control areas.

.d. Records of gaseous and lialid radioactive material released to the environs.

e. Records of transient or operational cycles for those unit conponents identified in Table 5.0.G-1. l
f. Records of reactor tests and experiments.
g. Records of training and gialification for alrrent members of the unit staff.
h. Records of in-service inspections performed puralant to these Technical Specifications.
i. Records of Giality Asairance activities reglired by the (A Marual.
j. Records of reviews performed for changes made to proce&res or eglipment or reviews of tests and experiments purasant to 10 CFR 50.59.
k. Records of meetings of the PRB and the SRB.
1. Records for Environmental Gialification which are covered under the provisions of paragraph 6.15.
m. Records of analyses req 11 red by the Radiological Environmental Monitoring Program.

6.11 RADIATION PRCTTECfION PROGRAM Proce&res fcr personnel radiation protection shall be prepared consistent with the regatrements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposare.

6.12 HIGI RADIATION AREA _

6.12.1 In lieu of the " control device" or " alarm signal" recuired by paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area in which the intensity of radiation is greater %an 100 mrenVhr hit less than 1000 mrem /hr shall be barricaded and conspicualsly posted as a high radiation area and entrance thereto shall be controlled by realiring isalance of a Radiation Work Permit *. Any indivi&al or group of indivi&als permitted

  • Health Physics personnel, or personnel escorted by Health Physics person-nel in accordance with approved emergency proce&res, shall be exenpt from the RWP isalance renairement & ring the performance of other assigned radia-tion protection & ties, provided they conply with approved radiation pro-tection procedures for entry into high radiation areas.

HA'101 - UNIT 1 6-20