ML20133A646

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re 960425 Submittal of Proposed Changes to Tech Specs Re Allowable out-of-svc Time for EDGs & Requirements for SGT & Control Room High Efficiency Air Filtration Sys
Date released: 05/26/2020 Download: ML20133A646


Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys
ML20133A651
Person / Time
Site: Pilgrim
Issue date: 12/23/1996
From:
BOSTON EDISON CO.
To:
References
Download: ML20133A651 (16)
Forwards Addl Info Re 960425 Submittal of Proposed Changes to Tech Specs Re Allowable out-of-svc Time for EDGs & Requirements for SGT & Control Room High Efficiency Air Filtration Sys
ML20133A644
Person / Time
Site: Pilgrim
Issue date: 12/23/1996
From: Boullette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20133A644 (2)