Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted
Date released: 05/25/2020 Download: ML20132G556


:on 950411,potential Inoperability Was Determined Re Feedwater Coolant Injection Sys Upon Failure of S2 DC Power.Caused by Error That Occurred During Original Plant Design.Physical Plant Mods Have Been Completed
ML20132G572
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/19/1996
From: Robert Walpole
NORTHEAST NUCLEAR ENERGY CO.
To:
References
Download: ML20132G572 (4)
Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted
ML20132G552
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/19/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.