05000245/LER-1995-008-02, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted

From kanterella
(Redirected from ML20132G552)
Jump to navigation Jump to search
Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted
ML20132G552
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/19/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132G556 List:
References
B15998, NUDOCS 9612260294
Download: ML20132G552 (1)


LER-1995-008, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)
2451995008R02 - NRC Website

text

!

g$g Northeast Mai ne otrm. none rerry na.. w.terrora, cr Utilities System P.o.iu 128 Waterrord. Fr 06385-0128 l

(203) 447-1791 i

December 19,1996 Docket No. 50-245 B15998 Re: 10CFR50.73(a)(2)(ii) l U.S. Nuclear Regulatory Comuission Document Control Desk Washington, DC 20555 l

l This letter forwards supplemental Licensee Event Report (LER) 95-008-02, documenting an

[

event that occurred at Millstone Nuclear Power Station, Unit No. I on April 11,1995. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

This supplemental LER updates the information contained in the Corrective Action section. Also, additional information is included regarding the reactor feed pump runout protection system.

Lastly, there are some editorial and administrative changes.

j The following is Northeast Nuclear Energy Company's (NNECO's) commitment made within l

this letter. All other statements made within this letter are for information only.

B15998-1 NNECO will complete the integrated testing prior to startup for operating Cycle 16.

j Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY j

YY

~

P. D. Hinnenkamp Director, Unit Operation Attachment: LER 95-008-02 cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator 3gQ,,

l S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 9612260294 961219 Y

PDR ADOCK 05000245 osu22., ary. i.os G