Pages that link to "ML20132G556"
Jump to navigation
Jump to search
The following pages link to ML20132G556:
Displaying 2 items.
- 05000245/LER-1995-008, :on 950411,potential Inoperability Was Determined Re Feedwater Coolant Injection Sys Upon Failure of S2 DC Power.Caused by Error That Occurred During Original Plant Design.Physical Plant Mods Have Been Completed (← links)
- 05000245/LER-1995-008-02, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted (← links)