ML20132E370

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/85-26 on 850601-0731 & Notice of Violation
ML20132E370
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/20/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20132E374 List:
References
NUDOCS 8510010070
Download: ML20132E370 (2)


See also: IR 05000482/1985026

Text

i

.

SEP 2 01985

In Reply Refer To:

Docket: STN 50-482/85-26

Kansas Gas and Electric Company

ATTN:

Glenn L. Koester

Vice President - Nuclear

P. O. Box 208

Wichita, Kansas

67201

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Cumins, B. L.

Bartlett, and H. F. Bundy of this office during the period June 1 to

July 31, 1985, of activities authorized by NRC Operating License No. NPF-42

for the Wolf Creek Generating Station, and to the discussion of our findings

with Mr. F. T. Rhodes and other members of your staff at the conclusion of

the inspection.

Areas examined during the inspection included plant status, followup on

pr_eviously identified items, operational safety verification, engineered

safety features system walkdown, startup test witnessing, startup test data

review, onsite followup._of events, site emergency drill, enforcement

conference (security), allegation followup, security, and plant tours.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors.

These findings are documented in the

enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required'to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics

contained in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 3 of the enclosed report.

One unresolved item is identified in paragraph 12 of the enclosed report.

The reponse directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act f 1980, PL 96-511.

[

!

RI

RB

RPB/B

RPB

AC

RIV: SRI

JECummins;ap

BLBartlett

HFBundy

LEMaf' tin

EHJohnson

TA sh

/85

f////85

q/[b/85

f/ff/85

T//a/85

9 //gj85

9/ft

\\

8510010070 850

82

i

l

PDR

ADOCK O

pg

)

G

g y. i

-

~.

'

~

e

. i

Kansas-Gas and Electric Company

-2-

-

Should-you have any questions concerning this inspection, we will be pleased

.

to discuss'them with you,

b

Sincerely,

'

C:; d,al Signed BY '

,

E. H. Johnson

'

E. H. Johnson, Chief

~

'

,

-

Reactor Projects Branch

^

Enclosures:

1..

Appendix A - Notice of Violation

>

'.

2.

Appendix B - NRC Inspection Report

50-482/85-26

+

cc w/ enclosures:

Kansas Gas and Electric Company

ATTN: Gene P. Rathbun, Manager

,

.

of Licensing

P.10. Box 20B

'

Wichita, Kansas-

67201

Forrest Rhodes,-Plant Superintendent

> Wolf Creek Generating Station

P. O. Box 309

Burlington, Kansas

66839.

~

.

bec_to DMB (IE01)

--

bec distrib. by RIV:

  • RPB

Myron Karman, ELD,-MNBB (1)

Resident Inspector

R. D. Martin, RA

-*Section Chief (RPB/B) .

R. P. Denise,

  • R&SPB

'

J.: Harrison, RIII

  • RIV File

D.~ Powers, EO

'

  • MIS System

-*RSTS Operator

-*D. Weiss,-LFMB (AR-2015)

  • w/766

.

1

.

-