- ~C*s. f.
- NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE. N.Y.1?202/ TELEPHONE (315) 4741511 June 21, 1985 (NMP2L 0431)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Starostecki:
Re: Nine Mile Point - Unit 2 Docket No. 50-410 Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning the unqualified weld filler material used on the primary containment liner. This problem was reported via tel-con to S. Hudson of your staff on May 22, 1985.
Very truly yours, C
Vice President Nuclear Engineering and Licensing CVM/GG/cla (1061H) xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Senior Resident Inspector Project File (2) h
[
S
$ W
,2 a.
NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Unqualified Weld Filler Material (55(e)-85-16)
Description of the Problem The welding of attachments to the primary containment liner requires the use of weld filler material quali fied by impact testing.
- However, welded attachments to the liner were made using an unapproved grade of weld filler material which was not impact tested.
Also, since an unapproved grade of weld filler material was used, the welding procedure was no longer qualified.
The matter is still under investigation, and a final report will be submitted by December 2, 1985.