Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review ML20128C0271992-11-13013 November 1992 Notification of Significant Licensee Meeting 92-168 W/Util on 921124 to Discuss Process for Reissuing RO Licenses That Have Been Terminated After an AO Performance Review ML20097B5821992-05-27027 May 1992 Recommends That Methodology Specified in Order 20,475 Be Revised to Require Util to Include in Base Rates,Amounts Required by Nuclear Decommission Financing Committee 17th Supplemental Order 1999-09-16
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20207F5021999-03-0505 March 1999 Staff Requirements Memo Re 990305 Affirmation Session, Rockville,Md (Open to Public Attendance).Commission Approved Memo & Order Which Granted Util Intervention Petition & Request for Hearing ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review 1999-09-16
[Table view] |
Text
, ,
U*bf t '
e 1J.S. t.'3C DEC 191984 ISR DEC 26 E 8 20 STE U L.diu.us FELI 07f ti. f.fCB I MEMORANDUM FOR: Alar, Shropshire, Compliance and Investigations Coor inator THRU: Harry B. Kister, Chief, Projects Branch No. 2, DPRP FROM: Robert M. Gallo, Chief, Reactor Projects Section 2A, DPRP
SUBJECT:
MULTIPLE AltEGATIONS (SEABROOK STATION):
RI-84-A-0110, RI-84-A-0111, RI-84-A-0112, RI-84-A-0113 RI-84-A-0114, RI-84-A-0115, RI-84-A-0116, RI-84-A-0117, RI-84-A-0118, RI-84-A-0121, RI-84-A-0122, RI-84-A-0123, RI-84-A-0124, RI-84-A-0125, RI-84-A-0126 RI-84-A-0127, RI-84-A-0128, RI-84-A-0130 This refers to an anonymous, multiple allegation, dated July 24, 1984, that was received by NRC Commissioner James Asselstine. This written allegation detailed the alleger's concerns about the quality cf work at the Seabrook Station; specifically, the quality of piping, welds, steam generator nozzles, concrete walls, and valves installed at the Seabrook Station. On August 24, 1984 members of the Region I staff and the Office of Investigations spoke with the alleger. During this conversation the alleger clarified certain areas and provided additional information. A special team inspection, lead by Mr. S.
Ebneter, Region I, was conducted during August 13-17, 1984 and August 27-31, 1984 at Seabrook to evaluate those concerns of the alleger that related~to hardware deficiencies only. (The other set, RI-84-A-0119, RI-84-A-0120 and RI-84-A-0129, dealing with QA concerns, was referred to 01 for investigation).
As a result of the team inspection, only one (RI-84-A-0128) of the eighteen allegations listed above was partially substantiated. This allegation concerned improper storage of motor operated valves (MOVs); however, the licensee had taken proper actions to correct the situation prior to Region I's special inspection, and therefore, it is no longer a concern. The results of the entire inspection are documented in the enclosed Inspection Report (Combined IR 50-443/84-12 and 50-444/84-06).
Based on actions taken by the Regional Staff and the results of its special team inspection at Seabrook, Region I considers the above allegations closed, and plans no further action.
Robert M. Gallo, Chief Reactor Projects Section 2A, DPRP
Enclosure:
As Stated e,e eee m eeeees PDR FO GROSSB E.I A5-56e PDR Os_ s rs o S
Memo to A. Shropshire 2 DEC 19 S84 cc:
A. Shropshire S. Ebneter ,
R. Christopher D. Eisenhut I
i
(
s QUESTIONS FOR SEABROOK ALLEGER N 1. General time frame of work at site and type of job? Emphasis we are trying to gage his level of knowledge not his identity.
\
- 2. What is time frame of his concerns.
- 3. Pipe tunnel allegation p. 2 of letter? In reference to lack of proper documentation of faulty welds, specify what type of documentation you are talking about, ie. inspection records, NCR's etc. pc AAm.-
,,, ~ . << teal-al . 2h2n 8ic2r yxy()s J Jas ct w
&,Afx. Ana<nc7 a</<3m43<z= jk oad-P, ;
jr g p ]61JQ Qy4 Mv tw&&/d NPm Af} :- "X Nw * /g;T-dlJ &~O. l i 4 , S V r A k7s d A & w /- M n ~ '
~
$Y--
- 4. Are ee o umenDeMdf fds'iVYeIYsM68 fMdMf21m .,,g C
- 5. Who did falsification, names, title, etc. management direction.
- 6. Explain what you mean by QC Inspectors not being permitted to do inspec-tion.
l 1
$ 10
. . - i r
- 7. Were the inspectors threatened, intimidated, bribed or what?
- 8. Give me some names that I can independently interview for confirmation.
\ 9. What type of inspections were the inspectors told not to do? p. e.c 4.Id Jyc)/f pf uQ 'I p/
Lufw dJods.
- 10. Were they told not to do them because the welds were going to be cut out .
and done again or because they were hiding the bad welds? !
- 11. What.is the current status of their welds?
u
- 12. Other instances of falsification, threats intimidation and give me some names of witnesses.
I 2
~
I
- 13. Who are the supervisors that ordered inspectors not to inspect welds, when did it occur, under what circumstances?
3
- 14. Who was the supervisor who comented about the 100 suspected welds?
d 0
- 15. Were they ever inspected?
T-O'
]
- 16. Who was the inspector that heard the supervisor make the coment about the welds?
Y e
- 17. What other management was involved in the cover up of the bad welds?
- 18. Name all inspectors and supervisors involved in intimidations, falsifica-tions.
3
l I
COLD SPRING PIPES :
- 20. Explain what he knows about QC inspectors who wrote up NCRs that were by passed.
- 21. Who was the inspector?
4 i
- 22. What was the. basis for the accept override? '
- 23. Question about the NRC inspection for clarification. l
- 24. Is he saying inspector covered up problems?
4
1
--Pipefitter from October 1980 to June .1983
--Carpenter from August 1978 to-September 1980
--As pipefitter/ welder - welded pipes and fit as well. Concerns - August 1981-June 1983 (when resigned). Reason for problems - 1980 as carpenter / welder trained by Pullman Higgins (PH) then transferred. Concerned w/ PH construction end. -- Yankee Atomic and AaE 0A Inspectors Areas worked in plant as pipefitter/ welder - containment, waste process, cooling tower, deisel, tubine, PAB, steam feed and radioactive tunnel.
Size? 10" line in main stainless steel steam feed line (Schedule 80) l Grinding pipes - who was aware -- trade managers, Mike Scoha who is Company Manager and QC.
Jchn Martin (PH) did inspection, . knew of mixmatch. Process sheet required fit up and tack and visual inspection. was connecting 16" was open could see mixmatch. 1 Martin did look at weld and said "you guys are going to grind it, right" i response was yes.
Martin commented it was unfit, grind to pass. To confirm this - Don Walsh, Trade Supervisor and Geno Lefeve, Foreman, and Mike Scoha. !
t l
f t
up EB 11 !
2 .
Code does not permit you to grind - if grind beyond wall thickness then beyond requirement. Caller did grinding.
Acceptable to grind to pass - Reinspection - NDT did xray and must inspect.
NDT asked if grinded response was yes. Management didn't care. Welders were aware not suppose to grind but did anyway.
Had no names to confirm this practice but said to check w/ people who worked on 16" weld.
Caller was asked if' welders raised issue on welding. Responsed no. Not much Concern.
Caller was asked of intimidation. Response not that he knew of.
Pipe Tunnel Lack of proper documentation - Kind of documentation was cutting of joints w/out documentation. Management knew joints were below standards (Dan Evans, PH Supervisor)
Asked if documentation was destroyed before NRC inspection. Responded no.
- Caller not aware of welds / inspections documentation being falsified.
" is aware of inspectors' performing inspections that are required.
.- _ _ ~ . _ . ~ _
f 3 >
6 welds cut Dave /Doug Baker (Inspector) ordered not to inspect welds any further by PH.
Foreman, Dennis Clark, informed Baker not to inspect - don't cut welds as Caller cut - Baker observed w/ flashlight. Baker transferred to 2nd shift.
Caller transferred to another area. Clark said you're cutting everything -
word from supervisor to get Caller and Baker out. Clark didn't make decisions on transfers or welds only QA management. Evans said can't keep cutting.
Caller doesn't believe Clark cared about cutting.
Caller believe Baker was intimidated. Baker did not actually say he was being intimidated just callers observation.
Caller believes PH using unqualified / untrained welders. {
100 suspected welds - who heard that coment - piping engineer, Dennis Clark, Ray Walsh (General Foreman) and other welders were present.
Clark told Baker not to examine - Baker couldn't w/out caller present to cut.
To his knowledge weld not finished. Checked yr later and not done.
Transferred 11/81 to turbine.
Prior to transfer worked w/ diametrics. Out of 100 did 30.
Inspection requirements - 1005
4 Inspections always done. Signed off based on visual inspection. Suspected problems when saw gap allowed, route not being consumed. Confirmed suspicions
- did 3" joint 3' from pipe. Could see shinny ring af ter weld. That joint was cut out and management was aware. Had to cut windows per management.
Asked Geisbe if ' proper procedure and was told no. Stopped cutting - brought in QA.
Unsure if Baker is onsite. -
Not aware of any documents being falsified.
Mainsteam Feed i
Aware of mixmatch.
i May '82 transferred to 2nd shift (turbine) 2" steam line - cutting in 10" weld - inside lack of fussion zone, pointed out to inspector - told not to worry it's "my problem".
1 h
QA Inspectors who NRC can talk to - Dan Geisbe and Baker and maybe Baker's foreman (Caller could not recall name).
DRAVO - Turbine building (1 ,
i
5 PH's QA inspector - Brian Kennedy Kennedy always said "not our problem". Was also inspectors common reply.
Welding supervisor / superintendent only concern with fit up and tack installation.
Waste Process Building Vavle installed and not checked.
NRC would inspect and put hold tags-aware of damage.
Caller never saw actual damage. Couldn't turn valves. Suspected tephlon damaged. Observed rust etc. NRC overlooked violation - pipe installed.
Wcrked on xray pipe Jan. '82.
Written up for storage of stainless steel valves. LWA issued.
Caller thought he would be terminated - took photo between 12/81 and 1/82.
Did not tell NRC of conditions - knew NRC issued LWA's should of been aware. 1 Not sure if NRC inspector did anything improper - concerned that condition existed and installed anyway.
6
. .. . . . 9 e
\
Pipe Storage lef t open - piled on on top .of other. Not sure if damaged done to pipes.
Took photo. .
Aware that craftspeople orderd to . falsify Jim Butler, head of welding supervision, aware of problems.
On first names basis w/ inspectors, who come and go. Can not recall names.