Confirms 850412 Telcon Between El Butcher & Jp Jaudon Re 850429 Insp & 850422 Publication Date for Final Draft Tech Specs.Tech Specs Must Be Sent by Means Indicated on Encl on 850422
ML20132C945
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/15/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20132C450 List:
References
FOIA-85-511 NUDOCS 8504290063
Download: ML20132C945 (2)


Text

e I

UNITED ST ATES NUCLEAR REGULATORY COMMISSION ts g

REGION iv

. j 8

011 RYAN PLAZA DRIVE. SUITE 1000 ARLINGTON. TEXAS 79011 APR 151985 MEMORANDUM FOR:

A. Schwencer, Chief, Licensing Branch 2, NRR FROM:

E. H. Johnson, Chief, Reactor Project Branch 1, Division of Reactor Safety and Projects, Region IV

SUBJECT:

REGION IV REVIEW 0F RIVER BEND DR\\fT TECHNICAL SPECIFICATIONS This confims the telephone conversation of April 12, 1985, between E. L.

Butcher (NRR) and J. P. Jaudon (RIV).

In order to conduct a rapid review of the final draft of the River Bend Technical Specifications for the River Bend Station, we have scheduled an inspection for the week of April 29, 1985. This inspection will involve approximately ten inspectors onsite for the week of April 29, 1985. To prepare for this inspection, it is necessary that each participant or group of participants have a copy of the final draft Technical Specifications in hand the preceding week.

In addition to the River Bend and regional inspectors, we also plan to use resident inspectors from two other sites and two EG&G contractors.

The publication date for the final draft River Bend Technical Specifications is April 22, 1985. Not only is it important that this date be met, but it is equally important that copies of the Technical Specifications be sent by the means indicated in the attachment on April 22, 1985.

If you cannot meet the comitted schedule (i.e., publication and transmission on April 22,1985), we need as much advance notice as possible. We cannot guarantee that our review will be completed on time if your publication date slips. Additionally, any slippage in your dates will adversely impact other inspection schedules and programs.

T,n.4th E. H. Johnson, Chief Reactor Project Branch 1

Attachment:

Mailing List cc:

S. Stern, NRR J. P. Jaudon, RIV l

E. Butcher, NRR W. R. Bennett, RIV T. Novak, NRR B. Murray, RIV D. Crutchfield, NRR R. P. Denise, RIV SRI -River Bend SRI - Cooper Nuclear Station SRI - Comanche Peak

@[

f bb

6 Mailing List No. of Copies Recipient / Address Transmission Method 3

U.S. NRC, Region IV Normal over night mail service 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76006 ATTN:

J. P. Jaudon 1

Mr. W. F. Smith Use DHL or Federal Express 743 Circo Drive DCBE to RI's home Granbury, Texas 76048 1

U.S. ARC Use DHL or Federal Express; ATTN: Resident Inspector Send to site for delivery c/o River Bend Site to RI office 1 mile south of St. Francisville on US 61 Louisiana 70775 1

U.S. NRC Use Federal Express ATTN: Resident Inspector c/o Cooper Nuclear Station 2 miles south of Brownville, Nebraska 68321 1

EG&G Idaho, Inc.

Federal Express (Pr.iority 1)

ATTN:

K. Ward - WCB 1955 Freenont Avenue Idaho Falls, Idaho 83415 1

t

?[.

i'k 4r UNITED STATES NUCLEAR REGULATORY COMMISSION 3.,

'* J y wasHmotoN. o. c. 20sss y

e

\\ N'.

4....

APR 121985 Docket No. 50-458 APPLICANT:

Gulf States Utilities Company (GSU)

FACILITY:

River Bend Station (RBS)

SUBJECT:

MEETING

SUMMARY

- TECHNICAL SPECIFICATIONS FOR RIVER BEND STATION NRR attendees and Gulf States Utilities (GSU) managers and staff met to review the status of Technical Specification for the River Bend Station (RBS).

D. Crutchfield of NRR stated that NRR is willing to bypass the proof and review stage for the RBS technical specifications (tech specs). However, Crutchfield emphasized that the NRC staff reviewers will have full opportunity to review and comment on the tech specs and GSU would be required to certify the tech specs in two stages:

(1) Final Draft stage - GSU would have to conditionally certify that the Final Draf t of tech specs are in conformity with the plant as built, the FSAR and the SER, subject to the coments on the Final Draft provided by GSU.

(2) Final Tech Specs - GSU would certify that the tech spec are in conformity with the plant as built, the FSAR and SER. These tech specs would be published as appendix A to the license granted GSU.

GSU concurred with the above.

Schedule The enclosure present NRRs milestones for tech spec development and review.

NRR identified the following key milestones:

4/22/85 - Final Draft of tech specs issued and certified by applicant.

5/6/85 - Staff reviewers provide compnts 6/6/85 - Resolution of staff coments

'6/12/85 - Final Certification l

(

! ]

e--

W Y'

i

)

i 2

Other issues Mr. D. Williamson will serve as GSU spokesman on the tech specs.

Mr. Deddins of GSU stated that by 5/6/85 RBS plant will be at a point where GSU can certify to the veracity of the tech specs.

NRR reconsnended that GSU use an independant group to check out the tech specs.

Diesel Generators Mr. Novak of NRR strongly suggested that GSU examine their options on the TDI diesel generators.

tephen M. Stern, Project Manager LBf2/DL

Enclosure:

As stated cc: See next page s

e i

River Bend Station Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker cc: Troy B. Cnnner, Jr., Esq.

Ms. Linda B. Watkins/Mr. Steven Irving Cenner and Wetterhahn Attorney at Law 1747 Fannsylvania' Avenue, N. W.

355 Napoleon Street Washington, D.C.

20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.

Director - Nuclear Licensing Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 Mr. David 7aloudek Nuclear Energy Division H. Anne Plettinger Louisiana Department of 3456 Villa Rose Dr.

Environmental Quality Baton Rouge, Louisiana 70806 Post Office Box 14690 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana, 70112 Mr. J. David McNeill, III Dwight D. Chamberlain William G. Davis, Esq.

Resident Inspector Department of Justice Post Office Box 1051 Attorney General's Office St. Francisville Louisiana 70775 7434 Perkins Road Baton Rouge, Louisiana 70808 Gretchen R. Rothschild Louisianians for Safe Energy Inc.

1659 Glenmore Avenue

. Baton Rouge, Louisiana 70775 James W. Pierce, Jr., Esq.

P. O. Box 23571 Baton Rouge, Louisiana 70893

e MEETING ATTENDEES

SUBJECT:

TECHNICAL SPECIFICATIONS FOR RIVER BEND STATION DATE & TIME:

April 4, 1985 9:00 a.m. - 10:00 a.m.

LOCATION:

Room 422 Phillips Building Bethesda, Maryland PURPOSE:

To review the status of Technical Specifications for River Bend Station (RBS)

Name Orgar.ization Phone Stephen Stern NRC/DRR/DL 301-492-8346 Dan Williamson GSU 346-8651 X2306 J. E. Becker GSU 409-839-2181 Bill Reed GSU 409-839-2882 John Price GSU 409-838-6631 Jim Deddens GSU 504-381-4769 Tom Plunkett GSU 504-635-6844 Dean Houston NRC/NRR/DL/TSRG 301-492-8933 Ed Butcher NRC/NRR/DL/TSRG 301-492-8947 Dennis Crutchfield NRC/NRR/DL 301-492-7492 T. M. Novak NRC/NRR/DL 301-492-7425 A. Schwencer NRC/NRR/DL 301-492-7435 H. Thompson NRC/NRR/DL 301-492-4908 R. Benedict NRR/LQD 301-492-4908 E. J. Weinkam NRR/DL 301-492-9788 i

b f

s

04;;

n_ _ _ _ _

, 16-i d!!1;ie______.[__s_,--y _---o,-.,ll!i!!!

i

':'l=>!

~

,,2 1

11!51ll$lll*--'

- = - - - - ~*

C

.i iflll';juiil m

gi g e--- =-.

'hil:21 s I

--e j-

=

a

! l};!!Nl1ll'

',h

{

7 g

3 li!!g g):llo-------%

- - - ---e

~

5 iti h

m E

sJ1 sis-o J. ------* !

litic. 3 3.

d 8-Illilli!Jid.

a o

=

Yl


o! lllt n-e E

}!'l}liLN!Ilc i. Ilei n --ol . ilIlllI111sli a-g e irgpr o ~* ri}i;;lirP -- -- -


e! l},511:};!ill

,1 n- = 3 i_.,.m g 5 g },},g, j]ye---- 4 15 -


o !.l11t}ll E

2 1 e BC ~ g. il l!!!*---- e -}}