Lists Observations & Comments from NRC & Eg&G 850128-0201 Audit of Facility Environ Qualification of Equipment.Review Continuing.Evaluation Will Be Included in Sser
ML20132C772
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/28/1985
From: Noonan V
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20132C778 List:
References
NUDOCS 8503120029
Download: ML20132C772 (4)


See also: IR 05000128/2002001

Text

"

~

p ric

'

%g

LNHTED STATES

Enclosure 2

2

8

NUCLEAR REGULATORY COMMISSION

o

a

WASHINGTON. D. C. 20555

4, * . * * s/

9

FEB 2 81985

l

_

MEMORANDUM FOR: Albert Schwencer, Chief

Licensing Branch No. 2

Division of Licensing

i

,

FROM:

Vincent S. Noonan, Chief

.

Equipment Oualification Branch

Division of Engineering

SUBJECT:

ENVIRONMENTAL QUALIFICATION AUDIT OF THE EQUIPMENT

SUALIFICATION FILES FOR RIVER BEND STATION

,

,

Plant Name: River Bend Station

Docket No.: 50-458

Licensing Stage: OL Applicant

Responsible Branch: Licensing Branch No. 2

Project Manager:

E. Weinkam

Review Status: Review Continuing

r

~

During the week of January 28 thru February 1,1985, the NRC staff and its

.

consultants from EG&G Idaho Audited the equipment qualification files of River

'

Bend Station. The staff and its consultants audited a total of 12 files that

contained qualification information for equipment located in a potentially

,

harsh environment. As a result of the audit, the;.following are observations

and connents made by the staff and its consultants at an exit interview held

at River Bend Station on January 31,1985 (list of attendees attached).

1. A description of the River Bend Station (RBS) maintenance and surveillance -

program for all equipment within the scope of 10 CFR 50.49 must be included in

the equipment qualification (EQ) submittal.

.

2. Some parameters of concern were reviewed but were not documented by the

reviewer (e.g. leakage current on conax penetrations). The applicant must

review RBS entire EQ program to assure that all parameters of concern are

,.

adequately tested, meets the requirements of RBS, and are properly documented

<

i

in accordance with the requirements of 10 CFR 50.49.

'3. Qualification by similarity is unacceptable if the similarity analyses

does not meet the requirements of paragraph (f) of 10 CFR 50.49. The

applicant must review the RBS EQ program to identify all equipment qualified

by similart$y, and assure that qualification of the identified equipment is in

compliance with the requirements of 10 CFR 50.49(f).

I

.

!

9

65 ( 312 #>z t

k'A

4 Pl>-

c

c

-

- ..

. ._

.

_-

.

.-

. _--- .

__

_

__ _-_____________

_ _ _ _ _ _

.

.

-2-

4. The test reports did not always identify the tested equipment adequately,

so the applicability of the test report to plant equipment could not be

established in all files audited. The applicant must review the RBS EQ

program to assure that an auditable link has been established between plant

i

equipment and tested equipment.

The following comments are specific to individual Summary Reference Numbers

(SRN) as indicated. However, the applicants must update all files to

incorporate these comments where applicable.

(SRff-241211-1) Conax Electrical Penetration

There is no evidence in the file to indicate that a review of leakage current

has been conducted. The applicant committed to acquire leakage current data,

review it for acceptability and include it in EQ files.

(SRN-228212-1) Limitorque Valve Actuator (inside containment)

Aging calculations did not include abnormal temperature transients due to a

,

loss of off site power. The applicant committed to establish a generic

-

procedure for qualified life determination in this event. This procedure must

be included in the updated Environmental Qualification Document (EDQ)

scheduled for submittal to the NRC in February 1985. Applicant must also

notify the staff that the greese relief valves on these valve actuators are

installed correctly.

(SRN-228212-2) Limitorque Valve Actuator (outside containment with paramount

motors)

The applicant attempted qualification by two methods. The first method

-

,

attempted to establish similarity between the installed paramount motor and a

'

tested motor by another manufacturer. This approach is inadequate to

demonstrate similarity. The second method relied on a test report that had

,

,

insufficient data to show that a paramount motor was actually tested. This

was also considered inadequate. The applicant committed to demonstrate proper

qualification or replace the actuators.

^

(SRN-228218-3) Asco Solenoid Valve

During the plant walkdown it was found that the Asco valve inspected may not

be installed in accordance with the manufactureres recommendations. Applicant

must obtain installation instructions applicable to explosion proof valves and

verify proper installation.

l

O

.

-3-

(SRN-247481-1) Rosemount Transmitters

_

'

l

System component evaluation work (SCEW) sheets must be updated to reflect

pressure and temperature indicated in test report. Accuracy requirements on

SCEW sheet must be updated to include the actual specified and demonstrated

accuracies calculated for station requirements and demonstrated by analyses.

(SRN-247411-2) Mercury / Buchanan Terminal Boards

An auditable link between the test report and terminal boards must be

established.

In addition to the six files noted above, the following were also audited.

SRN-247529-2 Endevco Primary Position Element

SRN-241240-1 Okonite 600V Control Cable

SRN-237160-1 Westinghouse Pump Motor

SRN-211161-1 Power Systems Division, Hydrogen Igniter Assembly

SRN-SO5B

Namco Limit Switch

SRN-505A

Shaffer MSIV. Actuator

r

~

Our evaluation of the applicant's EQ program, including the results of the

audit, will be provided as input to a future SER Supplement.

&

Vincent S. Noonan, Chief

Equipment Qualification Branch

Division of Engineering

_

,

cc:

V. Noonan

A. Schwencer

-

R. LaGrange

E. Werkam

R. Bergen

J. Fehringer

H. Walker

EQ Section

i

i

e

'

.

.

a

NRC EQ EXIT MEETING

1/31/85

-

Name

Company

Rick King

GSU

William G. Culp

SWEC

John Fehringer

NRC/INEL

Harold Walker

NRC

Richard Borgen

NRC/INEL

Arie Blum

SWEC

J. E. Booker

GSU

John Propson

_

GSU

W. J. Cahill, Jr.

GSU Sr. V.P.

Jim Deddens

GSU V.P.

T. C. Croune

GSU Mgr. QA

P. F."Tomlinson

GSU Dir. OQA

Laszlo Illy

SWEC

William T. Tucker

SWEC

Leo Waldron

SWEC

'

Ashok Bhuta

SWEC

-

-

R. B. Stafford

GSU

Joe Booty

SWEC

John Hamilton

GSU

R. W. Helmick

GSU

!

L. Schell

GSU

S. Clarke

SAW PTO

-

-

H. P. Williams

GE

L. W. Rougeux

GSU

J. A. Mancil

GSU

.

i

R. L. Anderson

NMPC/NYSEG

-

W. H. Benkert

GSU/QAE

.

i

)

l