ML20132C049

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1996 for Point Beach Plant,Unit 2
ML20132C049
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/1996
From: Vander Velde B
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20132C032 List:
References
NUDOCS 9612180090
Download: ML20132C049 (1)


Text

m _

m..

POINT BEACH NUCLEAR PLANT Docket No.

50-301 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date 12/5/96 Completed By B. J. Vendee Velde

~

REPORT MONTH OCTOBER - 1996 Tc:cii-o No.

414n55-6681 i

Method of Ucensee Event Duration Reactor

. Report No.

System Component Cause and Corrective Action No.

Date Type' (Hours)

Reason

  • Shut Down' Code' Code' To Prevent Recurrence L

4 961005 S

720.0 C

1

'NA NA NA Scheduled refueling and meineenance (U2R22). Major work inesne include: Repiecing twe f*

Unit 2 scene generators; main control board wire esperation resolution; replace 8 anein seem l

1 condenser velves; HP turbine croesunder piping; repair service water west header; replace boric acid and reactor makeup weser totalizers; replace oefety impection accumulator level tronenmeers, modify XO2, XO3, and XO4 trenefornser snetering and reley circuits; and excieer anodification.

f i

'F: Forced

' Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain)

%xhibit I-Same Source G - Operational Error (explain) i H - Other (explain) i 9612180090 961205 PDR ADOCK 05000266 R

PDR

.