OPERATING DATA REPORT DOCKET NO. 50-266

c%c go DATE: 12/05/96 U

m COMPLETED BY: B. J. Vander Velde 88 OPERATING STATUS oo

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES "DQ$

2. REPORTING PERIOD: November - 1996 8&
3. LICENSED THERM AL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0

~

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720.0 8,040.0 228,528.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,475.5 192,129.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 720.0 7,429.6 188,911.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,092,876.0 11,202,982.0 268,419,131.0
17. GROSS ELECTRICAL ENERGY GENERATED 373,240.0 3,816,430.0 90,722,800.0
13. NET ELECTRICAL ENERGY GENERATED (MWH) 357,910.0 3,650,829.5 86,503,914.0
19. UNIT SERVICE FACTOR 100.0 %

92.4 %

82.7 %

20. UNIT AVAILABILITY FACTOR 100.0 %

92.4 %

83.0 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.5 %

93.6 %

77.7 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.0 %

91.4 %

76.2 %

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

1.4 %

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH):

Refueling,03/29/97,35 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach Urnt 1 MONTH NOVEMBER -

1996 DATE 12/5/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

497 11 498 21 498 2

496 12 496 22 497 3

496 13 497 23 498 4

496 14 497 24 499 5

497 15 498 25 498 6

495 16 498 26 497 7

494 17 499 27 497 8

497 18 497 28 498 9

496 19 497 29 500 10 497 20 498 30 497

POINT BEACH NUCLEAR PLANT Docket No.

50-266 Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date 12/5/96 Completed By B. J. Vander Veide REPORT MONTH NOVEMBER - 1996 Telephone No.

414n55-6681 Method of Licensee Evets Duration Reactor Report No.

System Componern Cause and Conective Action No.

Date Type' (Hours)

Reason' Shut Down' Code' Code' To Prevent Recunence NA NA NA NA NA NA

'NA NA NA NA 2

'F: Forced Reason:

Nethod:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Imd F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b t

(03-90)

DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE 12/6/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 1 operated at an average of 497 MWe net for the November,1996 report period.

The following Licensee Event Report was submitted to the NRC in November 1996:

Licensee Event Report 50-266/96-S01, Uncompensated PA Alarm Zone.

Safety-related maintenance included:

1

1. NIS detector source / intermediate rebuilt.
2. P-032D service water pump circuit rewired.
3. G-01 emergency diesel generator governor replaced.
4. DPIS-04014 auxiliary feed pump P-38B discharge differential pressure indicator detector vented.
5. LM-00463B steam generator level converter replaced.
6. G-02 emergency diesel generator air start motor rebuilt, oil added, and instrumented redundant start performed.
7. P-214B emergency diesel generator G-04 ac turbocharger lube oil pump replaced.
8. D-02125 volt de distribution panel calibrated.
9. 59/Y-04 yellow 120 volt vital instrument panel overvoltage relay calibrated.
10. D-03 125 volt de distribution panel magnetic trip settings changed.

I1. MS-00229 steam generator steam header drain packing tightened.

12. D-108/D-106 de station battery charger tested.
13. P-032A-M service water pump motor replaced.
14. P-029 GOV-Z auxiliary feedwater turbine driven pump governor replaced.
15. P-032B service water pump packing tightened.
16. MS-00237 auxiliary feedwater pump /radwaste steam isolation packing adjusted.
17. SW-02950 spent fuel pool heat exchanger outlet relief valve replaced.
18. SW-02930A&B spent fuel pool heat exchanger outlet seal and rings replaced.

e j

OPERATING DATA REPORT DOCKET NO. 50-266

- DATE: 12/05/96 COMPLETED BY: B. J. Vander Velde

~

TELEPHONE: 414-755-6681 I

OPERATING STATUS l

[

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: November - 1996
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 i
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

3 NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA t

THIS MONTH YEAR TO DATE CUMULATIVE -

11. HOURS IN REPORTING PERIOD 720.0 8,040.0 213,313.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 6,660.5 185,987.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE O.0 6,653.9 183,508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GFNERATED (MWH) 0.0 9,072,854.0 263,605,007.0
17. GROSS ELECTRICAL ENERGY GENERATED O.0 3,100,050.0 89,603,310.0 1
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2,948,730.5 85,413,380.0
19. UNIT SERVICE FACTOR O.0%

82.8 %

86.0 %

20. UNIT AVAILABILITY FACTOR O.0%

82.8 %

86.2 %

21. UNIT CAP ACITY FACTOR (USING MDC NET) 0.0%

75.6 %

82.0 %

i

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

73.8 %

80.6 %

23. UNIT FORCED OUTAGE RATE O.0%

0.3 %

0.9% -

l

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

12/30/96 l

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 i

f

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Uriit 2 MONTH NOVEMBER -

1996 DATE 12/5/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

-2 11

-2 21

-2 2

-2 12

-2 22

-2 3

0 13

-2 23

-2 4

-4 14

-2 24

-2 5

-2 15

-2 25

-2 6

-2 16

-2 26

-3 7

-2 17

-2 27

-2 8

-2 18

-2 28

-3 9

-2 19

-2 29

-2 10

-2 20

-2 30

-2 4

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE 12/6/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 2 was in a refueling outage during the entire November,1996 report period.

The following Licensee Event Report was submitted to the NRC in November 1996.

Licensee Event Repon 301/96-002, Reactor Heat Removal Loop Inoperable Due to Component Cooling Water Leakage.

Safety-related maintenance included:

1. Y-01 red 120 volt vital instrument panel mechanical interlock tested.
2. Y-02 blue 120 volt vital instrument panel fuse replaced and tested.
3. Y-03 white 120 volt vital instrument panel mechanical interlock tested.
4. Y-04 yellow 120 volt vitalinstrument panel mechanicalinterlock tested.-
5. Y-101 red 120 volt vital instrument panel mechanical interlock tested.
6. Y-103 white 120 volt vitalinstmment panel mechanicalinterlock tested.
7. Y-104 yellow 120 volt vital instrument panel mechanical interlock tested.
8. C-004 reactor and chemical volume control system control board suppon installed.
9. VNPSE-03213 purge exhaust fan suction tubing replaced.
10. PT-00468 steam generator pressure transmitter cable replaced.

I1. Pipe AC 0152N-06 supply header through heat exchanger to return header replaced.

12. CC-00747B boric acid evaporator component cooling outlet reliefvalve replaced.
13. IA-03048-0 header inlet control operator o-ring replaced.
14. SC-00959 reactor heat removal loop sample isolation flexible conduit repaired.
15. SW-02907-M containment recirculating heat exchanger flow control valve motor replaced.
16. B52-327C seal water return isolation control power transformer replaced.
17. B52-428H control power transformer replaced.

I 8. B52-428M control power transformer replaced.

19. B52-429M control power transformer replaced.
20. B52-4212G power to 2SW-2880 cooler service watcr inlet control power transformer replaced.

l

21. B52-425M power to 2CV-350 boric acid transfer pump control power transformer replaced.
22. B52-325F power to 2SI-826C safety injection pump suction control power transformer replaced.
23. B52-327M power to 2CC-815 component cooling surge tank emergency makeup water inlet control power transformer replaced.