uke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-37
On September 3-6, 1985, NRC inspected activities authorized by NRC Construction
~
Permit No. CPPR-117 for your Catawba facility. At the conclusion of the inspec-
tion, the findings were discussed with those members of your staff identified in
the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of ' selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.-
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concernin,1 this letter, please contact us.
Sincerely,
i
'
j
Virgil L. Brownlee, Chief
Teactor Projects Branch 2
.
Division of Reactor Projects
'
Enclosure:
Inspection Report No. 50-414/85-37
w/ encl:
. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bjc w/ enc 1:
8509260127 f j g4
ADOCK
Mi Johnson, ELD
6R. N. Jabbour, NRR
G
Document Control Desk
State of South Carolina
W RC Resident Inspector
["
RII
R
RII
JJLVnahan:ht
(<FJape
ARHe dt
9/ y /85
9//t/85
9/,7/85
f
i
,
\\
IEol
.-