y
.
4
\\
/f6V
t
,
September 20, 1985
Alabama Power Company
V ATTN: Mr. R. P. Mcdonald-
Senior Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT:
REPORT NOS. 50-348/85-32 AND 50-364/85-32
On July 29 - August 2,1985, NRC inspected activities authorized by NRC Operating
License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
1
Areas examined during the inspection are identified in the report. Within these
!
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities. violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Papu work Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by VLBrownlee/ for)
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
Inspection Report Nos. 50-348/85-32
and 50-364/85-32
2.
cc w/encis:
(See page 2)
.
i
!
'
8509260077 850920
i
ADOCK 05000348
i
G
I
l
- c6To l i
l
l
-
_
.~,
--
-
-,
-
-_
_
-
-
.
,.
N
.
'
,
Alabama Power Company
2
September 20, 1985
c w/encis:
. O. Wnitt, Executive Vice President
D. Woodard, Plant Manager
'
. G. Hairston, III, Manager, Nuclear Engineering
yd.and Technical Support
W. McGowan, Manager-Safety Audit
vb.andEngineeringReview
O. Thrash, Manager, Nuclear Operations
Rd.andAdministration
G. Ware, Supervisor-Safety Audit
and Engineering Review
c w/ encl:
C Resident Inspector
. Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
,
.
RII
RII
RII
RII
RII
RI
If
C
( h,
jd
'
- lm
ABelisle
CJuli n
AGi %
'
FCantre 1
DVerrelli
09// 3/85
09/p/85
09 // 7 /85
09//(/J6
09//p/85
09/jg/85