ficia1
.
,
.
s,
,
.
MAR 01 1985
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-369/84-40 AND 50-370/84-35
On November 27 - December 11, 1984, NRC inspected activities authorized by NRC
License Nos. NPF-9 and NPF-17 for your McGuire facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
' included in your response are presented in the enclosed Notice of Violation.
In addition to the need for corrective action regarding these specific viola-
tions, we are concerned about the implementation of your management control
system that permitted their occurrence. Consequently, in your reply, you should
describe in particular those actions taken or planned to assure that post trip
reviews are thorough and that the reactor protective system and engineered safety
systems tests include the necessary specifics to assure that required functions
are properly tested.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply. If you wish to withhold information contained therein,
please notify this office by telephone and include a written application to
withhold information in your response. Such application must be consistent with
the requirements of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
l
\\
Sincerely,
j
'
7230356Og300369
Original Signed By
!
DR
ADOCK
ppR:
J. Nelson Grace
G
,
!
J. Nelson Grace
j
Regional Administrator
Enclosures:
(See page 2)
l
YO
1
\\
\\
--
---
-
,
.
,
,
,
,
.,
Duke Power Company
2
Enc 1csures:
i
il.
2.
Inspection Report
Nos. 50-369/84-40
and 50-370/84-35
cc w/encls:
M. D. McIntosh, Station Manager
bec w/encis:
NRC Resident-Inspector
Document Control Desk
State of North Carolina
.
.
.
.
.
.
'
-
HCDan&
SRII
l
RII
RII
RII
RII
RII
i
sa
ce
VLB
niee
PBemi
uckett
J01
inski
0
01/ C 85
01/@/85
OV/ /85
L /85
0
/85
3
p
- g 54
T d-
-
- -
-
-