Text
.
i i
i OPERATING DATA REPORT DOCKET NO-50-369 DATE November 15. 1996 OPERATING STATUS C0lFLETED BY R.A. Williams TELEPHONE 704-382-5346 i
- 1. Unit Names McGuire 1 1
- 2. Reporting Period: October 1, 1996-October 31,1996
- 3. Licensed Thersal Power ( Mt):
3411
- 4. Waseplate Rating (Gross MWe):
13051 Notes eNaseplate Rating
- 5. Design Electrical Rating (Net Me):
!!B0 (6ross MWe) calculated as
- 6. Masisus Dependable Capacity (Gross M e):
!!71 1450.000 MVA x.90 power
- 7. Marious Dependable Capacity (Net MWe):
!!29 factorperFage111,
- 8. If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last NUREB-0020.
]
Report. Give Reasons:
I l
i
- 9. Power Level To Which Restricted, if Any (Net Me):
- 10. Reason For Re:trictions, if any:
.I I
This Month Yr.-to-Date Cuaulative 11.HoursinReportingPeriod 745.0 7320.0 130776.0 12.NumberOfHoursReactorWasCritical 726,1 6722.5 95161.8
- 13. Reactor Reserve Shutdown Hours -
- - -10. Hours Generator On-Line 725.5 6630.2 94161.8
- 15. Unit Reserve Shutdown Hours
--0-- --0--
- 16. Gross Thereal Energy Generated IMH) 2451562 22332831
.297086933 17.' Gross Electrical Energy Generated (MWH) 844928 7628861 102004141
- 18. Net Electrical Energy Benerated (MWH) 912299 7331455 97499026
- 19. Unit Service Factor 97.4 90.6 72.0 20.UnitAvailabilityFactor 97.4 90.6 72.0
- 21. Unit Capacity Facter (Using MDC Net) 96.6 88.7 65.1
- 22. Unit Capacity Factor (Using DER Net) 92.4 B4.9 63.2
- 23. Unit Forced Outage Rate 2.6 1.2 12.8
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling and Steam Generator Replacement - February 06, 1997 - 100 days
- 23. If Shut Donn At End Of Report Period. Estimated Date of Startup November 10, 1996
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved l
INITIAL CRITICAlliY INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
l 9611200252 961115 PDR ADOCK 05000369 R
I l
OPERATING DATA REPORT DOCKET NO 50-369 ilNIT McGuire 1 DATE Noveeber 15. 1996 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH Octotei. 1996 QM AVERALE DAILY POWER LEYEL QM AVERABE DAILY POWER LEVEL (MWe-Net)
(MWe-Met) 1' 1120 17 1131 2
1121 18 1132 3
1121 19 1132 4
1110 20 1134 5
1060 21 1134 6
1123 22 1135 7
1125 23 1136 0
1126 24 1135 9
1130 25 1134 10 1129 26 1133 1128 27 1133 12 1130 28 1134 13 1132 29 1133 10 1132 30 1099 13 1130 31 0
16 1131 i
i l
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME muyultte 1 -.
DATE 11/id/3e REPORT MONTH October 1996 COMPLETED BY x.
A.
williams h
TELEPHONE t ius 1
.s ez-d.34 e (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-
~CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 5
96-10-31 F
19.55 D
1 ED BATTRY VITAL BATTERY INOPERABLE DUE TO FAILED DISCHARGE TEST l
i (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions t'
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entn Sheets For Licensee '
C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other m
_. _ -. _. _...._ _ _ _ - ~.. -
\\
i MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 1 2.
Scheduled next refueling shutdown: February 1997 3.
Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
i 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
i 7.
Number of Fuel assemblies (a) in the core: ]9).
(b) in the spent fuelpool: 223 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
9.
Projected date oflast refueling which can be accommodated by present license capacity: March 2006'**
DUKE POWER COMPANY DATE: November 15.1996 l
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
4
=
1 DOCKET: 50-369 UNIT: McGuire 1 Date:
11/15/96 NARRATIVE
SUMMARY
MONTil: October,1996 McGuire Unit I began the month of October operating at 100% full power. The unit operated at or near 100% full power until 10/30/96 at 2100 when the unit began decreasing power when the vital battery bank was declared inoperable due to failed discharge test (not enough replacement battery cells onsite).1he unit was removed from service on 10/31/96 at 0427 and remained in the outage the remainder of the month.
\\
Prepared by: R. A. Williams Telephone:(704). 382-5346 L
l I
r l
OPERATING DATA REPORT DOCKET NO 50-370 DATE November 15. 1996 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346
- 1. 8 nit Name: McGuire 2 J
- 2. Reporting Period October 1, 1996-October 31,1996
- 3. Licensed Thersal Power (MWil:
3411
- 4. Naseplate Rating (Srsss MWel:
13051 Notes *Naseplate Rating
- 5. Design Electrical Rating (Net NWel:
1180 (6ross MWel calculated as
- 6. Maxinus Dependable Capacity (Bross MWel:
1171 1450.000 MVA :.90 power
- 7. flasisus Dependable Capacity (Net MWel:
1129 factor per Page lit,
- 8. If Changes Occur in Capacity Ratings (!tess Nueber 3 Through 7) Since Last NURE6-0020.
Report. Elve Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWel
- 10. Reason For Restrictions, if any:
ThisMonth Yr.-to-Date Cusulative
!!. Hours In Reporting Period 745.0 7320.0 111072.0
- 12. Nusber Of Hours Reactor Was Critical 732.2 5390.3 87145.9
- 13. Reactor Reserve Shutdown Hours
- --0--
--0--
- 14. Hours Benerator On-Line 731.7 5353.9 B6084.7 i
- 15. Unit Reserve Shutdown Hours
--0--
- --0--
- 16. Gross Thersal Energy Generated (MWill 2477019 17846443 283086092 j
- 17. Gross Electrical Energy Generated (MWH) 857111 6165883 98669159
- 18. Net Electrical Energy Generated (MWH) 824422 5909407 94621764
- 19. Unit Service Factor 98.2 73.1 77.5
- 20. Unit Availability factor 98.2 73.1 77.5
- 21. Unit Capacity Factor (Using MDC Net) 98.0 71.5 74.8
- 22. Unit Capacity Factor (Using DER Net) 93.8 68.4 72.2
- 23. Unit Forced Outage Rate 1.8 16.0 7.1
- 26. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estisated Date of Startup: November 12. 1996 j
- 26. Units in Test Status (Prior to Consercial Operation):
Forecast Achieved i
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL GPERATION l
l l
OPERATINS DATA REPORT DOCKET NO 50-370 UNIT McGuire 2 DATE Noveeber 15. 1996 COMPLETED BY R.A. Wil11 ass TELEPHONE 704-382-5346 MONTH October. 1996 DE AVERAGE DA!LY POWER LEVEL RM, AVERAGE DAILY PDWER LEVEL (MWe-Net)
(MWe-Nett i
1121 17 1137 2
1123 IB 1138 3
1124 19 1138 4
1122 20 1139 5
1125 21 1140 6
1127 22
!!41 7
1128 23 1141 8
1129 24 1141 9
1135 25 1140 10 1135 26
!!39 1134 27
!!39 12 1135 28 1140 l
13 1137 29 1139 14 1136 30 1141 15 1135 31 269 i6 1136 i
l f-l
_ _ _ _ _ - _ _ ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCFET NO.
50-370 UNIT NAME Muyu use. 2 -.
-DATE 11/1d/vb REPORT MONTH October 1996 COMPLETED BY
- x. A _. Williams TELEPHONE p us ; -J tsz-dd e d (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 4
96-10-31 F
13.28 D
1 ED BATTRY VITAL BATTERY INOPERABLE DUE TO FAILED DISCHARGE TEST i
I.
I (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure-(Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For' Licensee Event Report (LER C-Refueling 3-Automatic Scram
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-OperaQor Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other i
t 1
P m
m
-m
_. - - - -. ~
_ -. ~
l i
l l
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: September 1997 3.
Scheduled restart following refueling: January 1998 i
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
l If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee j
regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, signifkant changes in design or new operating procedures).
I 7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 269 8.
Present licensed fuel pool capacity: 1463 Size of requested or plann.d increase: -
9.
Projected date oflast refueling which can be accommodated by present license capacity:
l December 2Q01 l
DUKE POWER COMPANY DATE: November 15.1996 i
l Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
l l
I f
[
I
~
l l
DOCKET: 50-370 l
UNIT: McGuire 2 l
Date:
11/15/96 I
l i
NARRATIVE
SUMMARY
MONTH: October,1996 McGuire Unit 2 began the month of October operating at 100% full power. The unit operated at or near 100% full power until 10/31/96 at 0300 when the unit began decreasing power after the vital battery bank was declared inoperable due to failed discharge test (not enough replacement battery cells onsite). The unit was removed from service on 10/31/96 at 1043 and remained in the outage the remainder of the month.
)
Prepared by: R. A. Williams Telephone: (704)- 382-5346
,