ML20129K166
| ML20129K166 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/11/1984 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20129K167 | List: |
| References | |
| NUDOCS 8507230464 | |
| Download: ML20129K166 (2) | |
See also: IR 05000250/1984023
Text
Y)-
$Y
'l
t
/
.
OCT 111994
Florida Power and Light Company
ATTN:
Mr. J. W. Williams, Jr.
Group Vice President
Nuclear Energy Department
P. O. Box 14000
Juno Beach, FL 33408
Gentlemen:
SUBJECT:
REPORT NOS. 50-250/84-23 AND 50-251/84-24
On July 15 - August 17, 1984, NRC inspected activities authorized by NRC License
Nos. DPR-31 and DPR-41 for your Turkey Point facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff identi-
fied in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Please note an additional example of a previous violation from Inspection Report
Nos. 50-250, 251/84-09 is addressed in paragraph 3.
In your response to the
previous violation, the cause of the event was stated that design changes (PCM's)
were incorrectly identified as non-nuclear safety related and consequently did
not received the appropriate review.
Please address the specific corrective
actions taken, or to be taken, to assure that PCM's both previously evaluated and
to be evaluated are correctly classified.
Your attention is invited to unresolved items identified in the inspection
l
report.
These matters will be pursued during future inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
,
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply. If you wish to withhold information contained therein,
'
please notify this office by telephone and include a written application to
withhold information in your response. Such application must be consistent with
the requirements of 2.790(b)(1-).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
)
ik
8507230464 841011
gDR
ADOCK0500gO
gl
)
I
.
.
OCT 11384
.
,
'
.
Florida Power'and L1ght Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Richard C. Lewis, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-250/84-23
and 50-251/84-24
cc w/encls:
K. N. Harris, Vice President
Turkey Point Nuclear Plant
C. J. Baker, Plant Manager
Turkey Point Nuclear Plant
bec w/encis:
NRC Resident Inspector
Document Control Desk
State of Florida
RII
RII
RII
RI
2darsho.
TeoJL
sPufkett
Hoance
9/ti/84
9/2//84
/0/J /84
8/ g/84
/C!v
to