ML20129J666

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1985.Related Correspondence
ML20129J666
Person / Time
Site: Limerick Constellation icon.png
Issue date: 06/14/1985
From: Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CON-#385-528 NUDOCS 8507230208
Download: ML20129J666 (6)


Text

..

'SW munocoaassmm PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET o

P.O. BOX 8699 PHILADELPHIA. PA.19101 J$ne14, 1985 tatsi e414 DOLMETED Docket No. 50-352 &

USMC 85 JUN 21 N0:50 Director 3

Office of Resource Management US Nuclear Regulatory' Commission GFFICE OF SELiitit.r Washington, DC 20555 00CdEThpc

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen Enclosed is the monthly operating report for Limerick Unit 1 for the month of May, 1985 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, 1

W J

R. H.

o ue Superintendent Nuclear Services WMA vdw Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

Dr. T. E. Murley, NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources Mr. P. A.

Ross, NRC (2 copies)

INPO Records Center See Attached Service List 72gg h3 2

R

cc Judge Helen F. Hoyt Judge Jerry Harbour Judge Richard F. Cole Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

'Mr. Frank R.

Romano Mr. Robert L. Anthony Ms. Phyllis Zitner Charles W. Elliott,_Esq.

Zori G. Ferkin, Esq.

Mr. Thomas Gerusky l

' Director, Penna. Emergency Management Agency i

Angus Love, Esq.

David Wersan, Esq.

Robert J.

Sugarman, Esq.

i Kathryn S.

Lewis, Esq.

Spence W.

Perry, Esq.

Jay M. Gutierrez, Esq.

1 Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket & Service Section James Wiggins Timothy R.

S. Campbell

)

ii i

I

\\

June 12, 1985

f,O. '. :

' OPERATIN3 DATA REPMT' t i 00CKET NO. 50 - 352 2

DATE JUNE 14,1985

~

l COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 CPERATING STATUS

1. UNIT NAMES LIMERICK UNIT 1 1 NOTES: UNIT 1 IS IN ST ARTUP TESTING. 1 I

I 2.' REPORTING PERID0 8 MAY, 1985 l

FACILITY OPERATING LICENSE I

I I

3. LICENSE 0' THERMAL POWER (MWT):

163 i

NPF-27, ISSUED 10/26/84, RE-l j

l

4. NAMEPLATE ' RATING (GROSS MWEl s 1092 l

STRICTS POWER LEVELS NOT TO 1

I L

~ 5. DESIGN ELECTRICAL RATING (NET MWEls 1055 l

EXCEED 53 0F THE RATED POWER. !

I I

' 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEls I

l

,t l

I 7.'MAXIftJM DEPENDABLE CAPACITY (NET MWEls l

I

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER S THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

[

j.

l 9 ' POWER' LEVEL TO WHICH RESTRICTED, IF ANY (hET MWE18 r

10. REASONS FOR RESTRICTIONS, IF ANYs THIS MONTH

+ YR-TO-DATE' CUMULATIVE

11. HOURS ~ IN REPORTIN'G PERIOD

'O '

O O

.125 NUMBER OF HOURS REACTOR WAS CRITICAL 0

1,042 1,0T9.8

13. REACTOR RESERVE SHUTOOWN HOURS 0.0 0.0-0.0

.14. HOURS GENERATOR ON-LINE 0.0 0.0' O.0 15.' UNIT RESERVE SHUTDOWN HOURS 0.0

_0.0 0.0 l

I IN GROSS THERMAL ENERGY GENERATED. (MWHI O

95,6b8 95,668'

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0

0

_ 18. CET ELECTRICAL ENERGY GENERATED (MWHI

-T2

-72

-72

19. UNIT SERVICE FACTOR 0.0

,,4 0.0 0.0

' ~2%' UNIT ~AVAI'L'AtilfITY'P'ACOR OIO

~ 0.0 0.0

~~

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 0.0 22 UNIT CAPACITY FACTOR.(USING DER NET) 0.0 0.0 0.0 i

23.'LMIT FORCED OUTAGE RATE 0.0 0.0 0.0 '

24. SMUT 00tMS SCHEDULEO OVER NEXT 6 MONTHS (TYPE, DATE. AND OURATION OF EACHl s 3
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs '

2h UNITS IN TEST' STATUS (PRIOR TO COMMERCIAL OPERATIONis FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/ L3/85 s

COMM5RCI AL ' OPERATION 4TH QTR 85

p.

s c AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 3 52 -

1.

UNIT LIMERICK

~ UNIT 1 DATE JUNE 14,1985 f

COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN f

ENGINEER-IN-CHARGE j'

NUCLEAR SECTION GENERATICN DIVISION-NUCLEAR TELEPHONE (215) 841-5022

_

F I

MONTH MAY 1985 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

}

(MW E-N ET)

(MW E-N ET )

i i

4 1

0 17 0

i 2

0 18 0

i 3

0 19 0

l l

4 0

20 0

5 0

21 0

6 O

22 0

7 0

23 0

8 0

24 0

f 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

j 14 0

30 0

[

15 0

31 0

t 16 0

. ~

g..

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICR UNIT 1 DATE JUNE 14,1985 REPORT MONTH MAY, 1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 I

I J

! METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

ITYPEIDURATION IREASONISHUTTING DOWNI EVENT l CODE I CODE I ACTION TO NO.! DATE I (131 (HOURS)! (2) l REACTOR (3) ! REPORT S I (4) l (5)

! PREVENT RECURRENCE I

I i

1 I

I I

I I

2 1 850501 1 5 1 048.0 t

B l 2

I NA 1 TA l TURBIN I SCHEDULED MAINTENANCE CONTINUED FROM 04/16/85..

I' I

I I

I I

I I

I 3 1 850503 l S l 696.0 I

H I 4

i NA I ZZ l ZZZZZZ l UNIT IN SHUTDOWN MODE. UNIT PENDING FULL POWER I

I I

I i

1 l

I LICENSE.

1 I

I I

I I

I i

l i

8 l T44.0 l

I I

l l

l 1

i l

(1)

(2)

(3)

(4) l F - FORCED REASON

. METHOD..

EXHIBIT G - Ih6TRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATICN OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM'.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHERLEXPLAIN) 1 EXHIBIT I - SAME SOURCE i

~

.~

e Dockat No. 50-352 Attachment to Monthly Operating Report for May, 1985 Limerick Generating Station -

Unit 1 May 1 through May 31, 1985 I.

Narrative Summary of Operating Experiences ThereactorremainedshutdownforthemonthoNMayto perform maintenance and modifications in anticipation of a full power license expected in June.

The fuel pool was drained on May 7 for relocation of hangers, modification of pool level switch and other work in preparation of first refueling outage.

Modifications which began and continued throughout the month included the followings inspect "A" and "B" Reactor Feed Pump impellers; investigate the Residual Heat Removal (RHR) pump oil frothing problem; and modify the "A" main turbine lube oil separator.

Maintenance included hydrolasing o'f the condenser tubes in the "A " and "C" waterboxes.

II.

Challenges to Relief Valves i

During this month, there were no challenges to the main steam system safety-relief valves'.

E

-,,,.e-

,-r

~n..

,,,w

-+m,,-,, - - - - - -. - -.

-.,,,---.n,+-sw----w..---

--n

. - -. - -, -,,-----,-.