o May 14, 1985 DISTRIBUTION:

.N Docket No. 50-309 'NRC POR L PDR ORB #3 Rdg HThompson OELD Mr. J. B. Randazza EJordan Executive Vice President BGrimes Maine Yankee Atomic Power Company JPartlow

. 83 Edison Drive PMKreutzer Augusta, Maine 04336 ACRS +10 Gray File

Dear Mr. Randazza:

SUBJECT AUXILIARY FEEDWATER SYSTEM EVALUATION Enclosed is our revised evaluation of your auxiliary feedwater (AN) system.

This revised evaluation is in response to your request dated September 28, 1984 for a meeting concerning certain aspects of the AFW system. The meeting was held on November 8, 1984 at which time the technical staff was requested to reevaluate your AFW system. The staff's revised evaluation reflects your letters of January 10 and 14 1985, concerning this subject.

In order to resolve all issues concerning the AFW system, we have prepared the enclosed integrated assessment. This assessment reflects:

- An evaluation against the deterministic criteria of the Standard Review Plan,

- An evaluation against the generic recommendations of NUREG-0635.

- An evaluation of system reliability based on NUREG reliability and subsequent system updates.

- An evaluation of the design basis for the flow capability for the system, and

- An evaluation of Multiplant Action C-14 "AFW Seismic Qualification."

The open items and items requiring verification by you are identified. However, information relating to Technical Specifications for Appendix R (which concern the turbine driven AFW pump) will be the subject of a future Generic Letter.

We request that you review the attached assessment and provide any comments that you deem appropriate.

h p

hk$ 309 PDR

l .

i l  :

We also request that you provide a schedule within 30 days of your receipt of this letter to complete the identified open items and provide the verifications .

requested. If you further clarification is needed, we will be happy to meet with you at your convenience. The provisions of Generic Letter 84-08 apply to this assessment.

The information requested in this letter affects fewer than 10 respondents; therefore OMB Clearance is not required under P.L.96-511.

Sincerely,

'OrtWnal s!gned by:

James R. Miller, Chief Operating Reactors Branch #3 l Division of Licensing

Enclosure:

As stated l

I i

i l

, ORB :DL SRSf R 0RB#3:

ORB #3:DL>f l P zer KHeitner:dd JRitill r 5

5/)4/85 5/#//85 c