ML20129G833

From kanterella
Jump to navigation Jump to search
Partially Deleted, Rept of Interview W/H Gilmartin
ML20129G833
Person / Time
Issue date: 09/18/1996
From: Teator J
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20129E434 List:
References
FOIA-96-359 NUDOCS 9610030154
Download: ML20129G833 (13)


Text

.- - . .. . _ _ _ - - - _ ---- .. .-

)

REPORT OF INTERVIEW -

.WITH '

HUGH GILMARTIN On July 19, 1995, GILMARTIN was interviewed by the re v rting investigator.

The ' interview was conducted under oath at the New Yorc Power Authority (NYPA),

123 Main St., White Plair.s, NY. GILMARTIN provided the following information:

ocial GILMARTIN pras born o number isJ ephone n ber He r ,.s 4-68146 7.

/h/

His e le i He graduated ,

His drivers license number a lor f Science degree fro e NY Institute of Techno ogy the State University of New York in Mechanical Engi e ' 'with ng. He graduat at Stony Brook i a Master of Science degree in Industrial Management. He was hived by NYPA in 1975. He is currently the Director He of Engineering Support and has been in that position for seven months.

reports to Tom.DOUGHERTY, Vice President of Nuclear Engineering.

NYPA reorganization of the Nuclear Generation I GILMARTIN Prior discussed to'the' the\

reorganization, the Configuration Management Group Department. Those consisted of 3 managers, Bill LEMANSKY, Dick BECHT, and Ulrich WITTE.

three managers reported.to Alan ETTLINGER. As part of reorganization, the group's responsibilities were realigned, which led to WITTE's position being eliminated. GILMARTIN said that WITTE was not chosen to be one of the two remaining managers because: I) in the selection process, GILMARTIN tasked the e three managers to rank the people assigned to them, and WITTE did not providee clear and succinct information; 2),WITTE was found to be lacking in providing E information on the status of work; 3) ETTLINGER did not think favorably of . ?E WITTE; 4) WITTE had developed a reputation for not being a team player; and GILMARTIN said that 32 S5) problems with WITTE's travel expense statements.

DOUGHERTY agreed with his decision to not select WITTE.

jj ,

GILMARTIN said that ETTLINGER wrote WITTE's 1994 performance review, which f$ i rated WITTE as "Does not. Meet expectations" (DNME).

concurred based on his observations of WITTE's job performance.

GILMARTIN reviewed and GILMARTIN eN E

S :g .,j i

.said that WITTE not being selected for the manager position and receiving (aFP)  ;*p !

DNME rating was not the result of John TARPINIAN raising fire protectionPrior to;$ the issues at the Indian Point 3 (IP3) Nuclear Generating Station.

reorganization, TARPINIAN was a contractor working for WITTE.

jg%

E 8 g .'

g 5

GILMARTIN said that when he took over ETTLINGER's position he asked ETTLINGER informed 5S#2 ETTtI if there was anything that needed to be resolved quickly.

him that WITTE had lost the privilege of using his NYPA American Express Card Also, WITTE and of general problems with WITIE's travel expense statements.

had a number of travel expenses for which he had not submitted claims.

GILMARTIN said that when he took over ETTLINGER's position he informed WITTE .

that he wanted his outstanding expense statements GILMARTIN to be saidsLbmitted, that when he and gotthat he expected future ones to be submitted on time.

WITTE's expense statements he . identified problems and glaring deficiencies.

GILMARTIN said that he had a lot of work at that time and needed help in  !

reviewing the statements, so he asked NYPA Audit Department Director, Jo BRENNAN, to review the statements. ple WITTE's expense statements to BRENNAN was not done because WITTE or his

^ ' ~ ^~^ b 3E(S) 9615'O55154 960918 - -

PDR FOIA '

MORGAN 96-359 PDR

~

had raised FP issues.

GILMARTIN recalled that, for a short period of time, he was responsible for the construction of an administration building at the James A. Fitzpatrick (JAF) Nuclear Generating Station. During that time, BARTLIK raised issues that the building's FP system did not meet code requirements. GILMARTIN said i

i that, as a result of that concern, NYPA had their code compliance group look at it and determine that the building met the code. GILMARTIN does not think that BARTLIK ever accepted that determinad on, but believed that issue was BARTLIK raised the subject again "put to bed" approximately one year ago. GILMARTIN i

' recently, that the building's sprinkler system did not meet code.

then talked to the code compliance people and the former building project l

engineer.

l GILMARTIN said that DOUGHERTY asked him to try to resolve the issue.

GILMARTIN got the people together again, and it was decided that they needed

( to know what the problems were and that they needed to be documented.

GILMARTIN said that he has tried to get BARTLIK to document his concern, but l

BARTLIK has not responded to the request. GILMARTIN said that he did not send BARTLIK a document requesting that he document his concern with the issue.

l \,

GILMARTIN was then questioned regarding whether he conducted an investigation into TARPINIAN's and STRAUSSER's backgrounds. GILMARTIN said that there were change orders (attached) to pay contractors, someone wanted to extend STRAUSSER and TARPINIAN before he (GILMARTIN) took his current position.

GILMARTIN opined that the change orders came to his attention in October 1994.

During that time, he was assisting DOUGHERTY in the Nuclear Engineering and Design (NED) reorganization. The change orders were left on DOUGHERTY's desk'.

He and DOUGHERTY did not know what TARPINIAN and STRAUSSER were doing for NYPA-GILMARTIN at that time, so they wanted to get an idea of their capabilities.

pursued that by going to ETTLINGER or WITTE, and asked for TARPINIAN's and l

STRAUSSER's resumes. GILMARTIN said that was not done because someoneGILMARTIN l

complained to him about what TARPINIAN and STRAUSSER were doing.

I said that he was trying to understand the need for keeping them employed at NYPA.

GILMARTIN explained that when a change order is brought to a NYPA Vice l

President, people generally ask questions and information is needed before decisions can be made. GILMARTIN added that NYPA was under financial constraints at that time.

GILMARTIN knows that Ken VEHSTEDT complained about everyone at the NYPA White Plains Office (WPO), generally stating that, "you guys are real pains in the rear end." GILMARTIN said that the general complaint from IP3 and JAF was

. n cases t at was true.

thattheydidnotgetsupportfromWPO,andingr I

Jeffrey A. N ator, Investigator Office of Investigations i

Field Office, Region I 2

Case No. 019

~ A /3 .,

C - (7 )

VECTRA

/v l

  • U March 14,1995

'D N

?

Ms. Doreen Costabile 27 g*7lfg i Project Contract Administrator

New York Power Authority '

4 123 Main Street l White Pfeins, N.Y.10601

SUBJECT:

Contract No. C 93 ZOO 28, Change Ordehnd 5 iP 3 Fire Protection Engineering Tasks

Dear Ms. Costabile:

Enclosed please find two copies each of the subject Contract Change Orders signed on behalf of <

VECTRA Technologies, Inc. l 1 ,

f We appreciate this opportunity to be of service to the New York-Power Authority. Please contact '

' . us should you desire additional information or assistance.

- Very truly yours, )

~

Kevin Warapius Vice President KW:MES/lb)

Enclosures' F

. r. J)

; :-.:  ; : ;;- :; , . :. , _ ,; . , g .

i- : : .:.- --

. ,: ,,. ,. .. p , . ,:... . ,

. .. ,... . . . .. m . ..

i .

. POWER AUTHORITY OF THE STATE O.F NEW YORK 123 Main Street White Plains, N.Y. I'0601-3104 '

Page 1 of 2 Prepared By: ,

Doreen Costabile .

PRdJECD Indim Point Unit 3 and James A. FitzPatrick Nuclesr Power Plants

, CHANGE ORDER NO. 4 doutract No. C 93 Z0028 4

Contract for: Fire Protection Engineering Tasks 20 NON-NUCLEAN Contractor: - Vectra -

SAFET.Y RELATED 225 ScientiSc Drive O CATEGORYII/III Address:

Norcross, OA 30092-Attn.: Mr. Michael M. Migliaccio TO THE ABOVE NAMdD CONTRACTOR:

In accordance hth the above described contract, the following changes are hereby made to th Contract Documents and you are hereby directed to perform the work / services in accordanc thesh changes.

This Change Order No. 4, effective December'28,'1994, is issued to authorize Vectra to pr the services of Mr. John Tarpinian from January I through June 30,1995 at the indim Point 3 Nuclear Power Plant. Mr. Tarpinian shall support the resolution ofIP3 Fire Pmtection Start-up Issues and the completion ofIP3 Fire Protection ~ Design Basis Documents. Mr. Tarpinian tection close-out packages. Mr, Tarpinian be directly responsible for the pq-.Gon ofIP shall be paid the all inclusive hourly rate of for straight time and overtime. p TOTALNOT-TO-EXCEED AMOUNTOFTHISCHANGEORDERNO.4 ^

The Changes of contract price or time of performance specified herein, if any, shall be th complete and exclusive changes of such on account of the foregoing changes in Except as specifically modified herein, all terms and conditions of the original Contr previously approve,d Change Orders apply.

.t n

t

, . gn e e 7c p w.~ 4 J /s n

k ..' -

,o

======.....-

' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Contract No. C 93 Z0028 Contractor Name: Vectra ,

Change Order No. 4 f Page 2 of 2


.------------------------------------ e 4 Contractor is directed to sign all three (3) copies of this Change Order and return two (2) fully executed copies to the individual whose name appears on the line entitled "P.repared ,

By:" at the top of Page 1. ,

' t

.- PRICE

SUMMARY

Original Contract Amount . . . . . . . . 6 Change Order No.1 . . . . . . . . . . . . .

Change Order No. 2 . . . . . . . . . . . . f6 Change Order No. 3 . . . . . . . . . . . . Q1 /

Change Order No. 4 . . . . . . . . . . . . p REVISED TOTAL AMOUNT . . . . . , .

1 C s .

Approved and Ordered: _<  ;

g/ Atithorized Signature g P#er Authority of the State of New York . 3, @a.,

O o g-i

'2- h . / W og Date: .,

B1 .

Agreed: YECTRA Technolooies. Inc. 2 Contractor .) l By: M . D Date: M! g a g -

$M o

g

!E a

J. Galletta - JAF Purchasin >. O cc: L. Retzer J. Dube - IP3

  • R. Lauricella - IP3 P. Morris - JAF QA Dept.'

R. Ventura F. Bloise N. Eng - IP3 Contract Files - 16 M.Yu W. Sky - IP3 l a0028Wde . . s sm .

Se ,

a ,, m

~

) POWER AUTHORITY OF THE STATE OF NEW YORK ,

123 Main Street

' White Plains, N.Y. 10601-3104 Page'l of 2 ,

Prepared By: Doreen Costabile \

Indian Point Unit 3 and James A. FitzPatrick Nuclear Power Plants l PROJECT: '  :

CHANGE ORDER NO. 4 l Contract No. C 93 Z0028 ,

Contract for:

i Fire Protection Engineering Tasks ED NON-NUCLEAR Contractor: ~

Vectra

. gETY RELATBD 225 Scientific Drive Address:

Norcross, OA 30092 O CATEGORYII/Ill '

4 Attn.: Mr. Michael M. Migliaccio TO THE ABOVE NAMED CONTRACTOR: -

In accordance'with the above described contract, the following changes are hereby made to the Contract Documents and you are hereby directed to perform the work / services in accordance with these changes. ,

This Change Order No. 4, effective December 28,1994, is issued to authorize Vectra to provide l

the services of Mr. John Tarpinian from January 1 through June 30,1995 at the Indian Point 3 Nuclear Power Plant. Mr. Tarpinian shall support the resolution ofIP3 Fire Protection Start-up i

l Issues and the completion ofIP3 Fire Protection Design "dasis Documents. Mr. Taipinian shall  !

s tection close-out packages. Mr. Tarpinian be directly responsible for the preparation ofIP fire shall be paid the all inclusive hourly rate of or straight time and ove: time. #h.

/

TOTAL NOT-TO-EXCEED AMOUNT OF THIS CHANGE ORDER NO. 4.

The Changes of contract price or time of performance specified herein, if any, shall be the complete and exc.tusive changes of such on account of the foregoing changes in the wo Except as specifically modified herein, all terms and conditions of the original Contract and a previously approved Change Orders apply.

2002tn/dc

.ni .

/, , . , , ,

, =.,,

. =..= =.................................w...

Contract No.E 93 Z0028 Contractor Name: Vectra l .

Change Order No. 4 l

........................................s...

Page 2 of 2 l Contractor is directed to sign all three (3) copies of this Change Order and return two (2)'

fully executed copies to the individual whose name app, cars on the line entitled " Prepared By:" at the top of Page 1.

1 PRICE

SUMMARY

l ,

t Original Contract ' Amount . . . . . . . . 6 Change Order No.1 . . . . . . . . . . . . @

l Change Order No. 2 . . . . . . ., . . . . .

Changt drder No. 3 . . . . . . . . . . . .

6

'b, '

j l  !

  • Change Order No. 4 . . . . . . . . . . . $

l REVISED TOTAL AMOUNT . . . . .

f Approved and Ordered: k._R.- (IA uthorized Signature .g g P, Authority of the State of New York t g g Date: %dds s b

o.

52w Agreed: ,

e 2 Contractor E- Q

. & o By: # D
h. <

m u

\

Date:

o w s i s b U h.

J. Dube - IP3 J. Galletta - JAF'Purchacin5 O cc: L. Retzer 2 R. Lauricella - IP3 P. Morris - JAF QA Dept.

R. Ventura F. Bloise~ N. Eng - IP3 Contract Files - 16 M.Yu ,

W. Sky - IP3 a

$5 gQ q,, / m- 'T /3 n

CONTRACT AM'T/ CHANGE ORDER AM,'T ORIGINAL CONTRACT DOCUMENT

-. JUBJECT: C 93 Z0028/CO 4 ,

Fire Protection Engineering Tasks .

DESCRIPTION:

PTRASE DO NOT DETACH SHEET ,

VENDOR: ,

Vec'tra Plcr.se examine these contract documentsisand If everything note any in order, irregularities please initial. on this clip prior to my signing.

1. INITIATING DEPARTMENT: i/,/!)[R.Ventura Time: 'I ' 6, [-

Transmitted: Date:

t l4 '

~ \ ,

Remarks: DX b "

_Initia ( 31 W w

  • Return to Contracts - WPO .
2. LAW DEPARTMENT: Time:

Transmitted: Date:, .

Remarks: , .

Initial:

  • Return to Contracts - WPO M. Garofalo

[.

APPRAISAL & COMPLIANCE SERVICES:

Transmitted: Date: 1-3/-45 Time:

Sc*he*. AirM Remarks: //u W. -[ &-m b h M *N**d G ">'!A "I '-y E

pa.<a m wA m A de fM. . Initial:

TReturn to Contracts - WPO

// D. Costabile 4.' CONTRACT ADMINISTRATOR: ,////ff Time:

Transmitted: Date:

/'

Remarks: h Initial: M .

Time:

5. Ri?TiiiinM6: Transmitted: Date:

Remarks:-- (Ir 1.'

r.

n. ,

JOHN M. HOFF*

AWARD APPROVAL .

CC's:

COPY TO WAREHOUSE YES NO

.e

,/

9 /8.m-

l

'~

~. t/;ge .gy s22 unin sir 1 WMe Plains. New York 10601 -([

y<

. 914 681.6200 s 7, ,

rc .

d }. m ye, o g'# A ,. , ,*Memorandum

.t

,v>

  1. > NewYo.rkPower

& Authority fe > "'

- /_ e-

  1. 1M N'f -

December 22,1994 IPP-94-377

, ;( -- ~~

/7j. e fe  ;

Q .

/0 g 4 ,

VI Contract -A Agini) tion ~ L 4gi

}-h

/

TO: J. FRANKO h j b' FROM: R. VENT,URA ._ IP3 Project Endaming ~

Services '

l i ThMMh SUBIECT: Indian Po'at 3 Nuclear Power Plant Fire Protection Design Basis Darnmentc ,

Channe Or1er to Vectra Technotories GSA C93-Z0028

^

Vectra h

Please find attached a contract requisition in an amount not to exceedh '

Technologies Incorporated's Fire Protecdon General Services Agreemen 20028 for the 1

services of Mr. John Tarpinian from January 1,1995 to Ipne 30,1995. Mr. Tarpinian's [ .

services are required to support the IP3 start-up effort and the completion ofIP3's Fire Protection Design Basis Documents. ,

)

i l l*' Mr.'Tarpinian is uniquely qualified for this assignment due to his familiarity with the IP3 k Fire Protection Program and his participation in the preparation and subsequent completion l of the JAF Fire Protection Design Basis Documents upon which IP3's documents are based.

In addition, Mr. Tarpinian is directly responsible for the preparation of IP3 fire protection close-out packages which are being prepared for the NRC fire protection faWon during the first quarter of 1995.

Mr. Tarpinian's services were previously provided through Cataract, Inc. Since the Cataract

! contract with NYPA expires on December 31,1994, this contract rei luisition requests that Mr. Tarpinian be switched to the Vectra Fire Protection General Services Agreement contract. Mr. Tarpinian was selected based on a review of resumes of submitted by various firms contracted with NYPA to provide engineering idwnnel.

l If you should have any questions, please call Bob Ventura (Ext 3522) or 'Ihad Niver (Ext 3457) ofIP3 Project Engineering. ,

l Attachment cc: T. Dougherty A. Ettlinger J. Knucher J. Dube D. Ruddy R. Ventura

' R. Simmons T. Niver b F. Bloise Records Station - WPO

... . f

~

carHN-CUR \CONr-REQ 20bEf3.khb$D I n }hbhk[I

  • f nte0Iiiy TeamWoIk/ 9 /6 ME(S) 7r o W

i 4, . ... -

, hMh INTERIM

- . CONTRACT REQUISITION J

I' twoonal sensees pheck one) ,

l operating Pacinty/ support pepartment/ construction Project

- DY, es or O No indian Point Nuclear Power Plant -

For Bid Bolipnation Only tensch set or suggeeeed bidders) Eesmesed cost: Nees:

$anch expected expendisses by year for mum 9eer conesot)

I u

./ [ , ',

For Award Only: Type of Anord (check one): '

D Law Sidder D Other then Law Ridder D Scie SJures O Dienge Order Noen: Ce3Z002.

.mard 6 mesh

- M by year for mas ear s eenemos;

! Vendor:

j Vectra Technologies. Inc:

j 800 Worcester Road Fiamingham, MA 01701 ,,

c;; .viion of RechiisG Purcitase or Serise:

f ; To orovide the service d Mr. .kt.. Teu;..;is, ficir January 1.1995 to June 30.1995. Mr. Tere;r.;er, is to mar-: t the i se1:Seinri of IP3 Fire Protection Start Ub lasug_gg(,.he uur.--M:.r of IP3 Fire ProteL-i C ;s- Epa rsmur. eats.

" +- hour for rarudar lrr.e and ovei; ..e.

Mr. Taroinlan's all 'ticiusive rate is~. ,

1 - _

1 .

Work - - - - (N AppBcable) j Job Order No 3 E 4 5 N 1 3

- ----- work - - --

~

1 ,l.u-

. a- i ResponsRdDty Center H 5 4 5 Cost Eement 8 3 1 l

1

_,( _ ^3 ["Y h assNeuy[. 5 D

' PES /WPO f R. . Ventura wJ IP3/ Fire Protection ime-

, - r- .s menneer.: - /  ::

l

! V'. b., 4 Y

- -t.er Director. PWR EiGcis l nummer rsante uniy eneve m a a reviewn saw- wcw.wrws.. w*y . case:

' O casesoryI a cenegory M in Other QA noviewed by: #g.y_N )

i 6ca. c,r. e 3 M. Garafalo ')f/. h/J,- .

- m onen w- .

audget or O Not in Budget er. R. Simrnons Comment: Oste:

/.2 QR ffs

~

j Date:

mo :: ree:

--upproveca py;mt a.. mis n

j py; - s --,s i me:

W. Cahill E.V.P. of Nuc. Gen.

'L V.P. Nuclear Ergir.;;.tg jT T. F. Dr=-y.eity j contract Admin. Use only Cc. T T.;^uT. eat No. E!E!E E E'E

! CTS Site @

Date:

i Bid Soldtston Follow Up: D E-:+-;^5-3 for Sid soldtebon

'.'R' -688 2

...e..

f r" ,. ,,

GE(S) camN-CUR \ CONT REQC0028-D.VEC Prirmed:Fri 12/23/949:45 ,

-- ~

POWER AUTHORITY OF THE STATE OF NEW YORK 123 Main Street White Plains, N.Y. 10601-3104 Page 1 of 2 Prepared By: R. Robinson-Alfano Headquarters, James A. FitzPatrick Nuclear Power Plant, PROJECT:

and Indian Point Unit No. 3 Nuclear Power Plant CHANGE ORDER NO. 2 Contract No. B 95 WOOO2 .

s Field Engineers  :

Contract for:

Sun Technical Services I[.[r y,

Contractor: -

27285 Las Ramblas, Suite 280 Address: Mission Viejo, Ca 92691 '

Attn: K. Jackson  :- . .

TO THE ABOVE NA!NED CONTRACTOR:

In accordance with the above described contra these changes.

This Change Order is issued to provide the temporary services o March 15,1995. Mr. Strausser's rates are as follows:

Straight time ................

Overtime .....................

npl Per diem ...................... (\ .

w0002n.wp/ajb

  • 'Oe r fjl//,y'. r // /6 .

s)

............ ==========-----=====-=== .. '

Contractor Name: Sun Technical Services Contract No. B 95'W0002 Change Order No. 2 Page 2 of 2

.............. ========--.==--============= '

The Changes of contract price or time of perfonnance specified berein, if any, shall b corftplete and exclusive changes of such on account of the foregoing changes in Except as specifically modified herein, all terms and conditions of the original Con previously approved Change Orders apply. s PRICE

SUMMARY

Original Contract Amount ........... M

- Change Order No.1

............... g Change Order No. 2 ...............

REVISED TOTAL AMOUNT ........

( .

Contractor is directed to sign all three (3) copies of this Change Order and return two (2) fully executed copies to the individual whose name appears on the line entitled "

By:" at the top of Page 1.

A Approved and Ordered: Authorized Signature l

l g Power Authority of the State of New York nj 2-I Date: j ..t

' S ] f b5nk, iD

y a

[:.j l Agreed:  ; c h, 0g Contractor By: t ,

. p .

I ,. l Date: i w0002n.wp/ajb L.&

1 *

?* l cc: Contract Files - 16 1. O U e l

i

, u- t a o e.

.?g

"\

i + {

3 ., ~3' L . _t n ,-

ij '

SEH & ~ r.

/g /3 c n..

gg .

g

J interim #7g

  1. 9 W Authonty NewYoykPower.q,,g.uc<'f j,. conteact aequi.sition .

1 5 fVf& .

Requistion No.

Personal Services (check one)

Opera 5ng l'ackyISupport DepartmentConstrucson Project O Yes 0 %

NUCLEAR GENERATIONf Note: (m. w e a, ,., e, Esfimated Cost For Bid SoEcuation Only (affecA ist of ac9 pealed bidders):

s Note: _e=* _ - - e. -

For Award Only: Type of Award (cher' w): _enme ~ .e Low Bidder O Other Than Low ' er O Sole Source O Change Order g Award Amount:

Vendor: ,

Sun Technical Services Inc.

Description of Required Purchase or Service:

,To provide the services'of James Strausser to March 1995 g- i 3E45N13 g;o* Tasu No. (W appEcabk)

Job Order No. I WoAAcever

~. H545 Coat Element 831 Responsibay Center ,_

Dept Locesort Facety Profed:

I Pr:pered by:

'I

} l [ ] s Requesting Manager: Tuo h Date:

Jangary 12, 1995 Hugh J. Gilmartin Director, Engineeting Support Nocteer Plants Only (have QA&R rev6ewy Opte: ,

QA Reviewed y O Ca'+i 0 Category M O Other A # l p 3

" ',41Ver5cetion (check, one):

kin Budget or O Not h Budget By: y

[ Budget Cc s.e.t Date:

Date:

sed Soscaa%nge= by: U[ ,

Tus

^"* # . Cah  ! Tuo Ch e f N clear Or$ ce

  • ~ 2 '

_ ._ e, .

  • Date Bid SolcRation Fotow Up: O Accepted for Bid SokaaCon

' Ib /b a

  1. p A. _ .

.