REPORT OF INTERVIEW
.WITH HUGH GILMARTIN GILMARTIN was interviewed by the re v rting investigator.
19, 1995, The ' interview was conducted under oath at the New Yorc Power Authority (NYPA),
On July 123 Main St., White Plair.s, NY. GILMARTIN provided the following information:
ocial GILMARTIN pras born o
/h number isJ He r
,.s 4-68146 7.
/
His e le ephone n ber i He graduated His drivers license number a
lor f Science degree fro e NY Institute of Techno ogy the State University of New York ng. He graduat in Mechanical Engi e ' 'with a Master of Science degree in Industrial at Stony Brook i He was hived by NYPA in 1975. He is currently the Director of Management.
He Engineering Support and has been in that position for seven months.
reports to Tom.DOUGHERTY, Vice President of Nuclear Engineering.
NYPA reorganization of the Nuclear Generation GILMARTIN discussed the\\
Prior to'the' reorganization, the Configuration Management Group Department.
Those consisted of 3 managers, Bill LEMANSKY, Dick BECHT, and Ulrich WITTE.
three managers reported.to Alan ETTLINGER. As part of reorganization, the group's responsibilities were realigned, which led to WITTE's position being GILMARTIN said that WITTE was not chosen to be one of the two eliminated.
I) in the selection process, GILMARTIN tasked the remaining managers because:
three managers to rank the people assigned to them, and WITTE did not provide ee clear and succinct information; 2),WITTE was found to be lacking in providing E
information on the status of work; 3) ETTLINGER did not think favorably of.
?E WITTE; 4) WITTE had developed a reputation for not being a team player; and 5)
GILMARTIN said that 32 S problems with WITTE's travel expense statements.
DOUGHERTY agreed with his decision to not select WITTE.
jj f$
GILMARTIN said that ETTLINGER wrote WITTE's 1994 performance review, which GILMARTIN reviewed and E
i rated WITTE as "Does not. Meet expectations" (DNME).
GILMARTIN eN i
concurred based on his observations of WITTE's job performance.
S :g
.,j
.said that WITTE not being selected for the manager position and receiving (aFP)
- p !
DNME rating was not the result of John TARPINIAN raising fire protectionPrior to the issues at the Indian Point 3 (IP3) Nuclear Generating Station.
jg%
g reorganization, TARPINIAN was a contractor working for WITTE.
E 8 g.'
GILMARTIN said that when he took over ETTLINGER's position he asked ETTtI 5
5S#2 ETTLINGER informed if there was anything that needed to be resolved quickly.
him that WITTE had lost the privilege of using his NYPA American Express Card Also, WITTE and of general problems with WITIE's travel expense statements.
had a number of travel expenses for which he had not submitted claims.
GILMARTIN said that when he took over ETTLINGER's position he informed WITTE.
that he wanted his outstanding expense statements to be sLbmitted, and that he GILMARTIN said that when he got expected future ones to be submitted on time.
WITTE's expense statements he. identified problems and glaring deficiencies.
GILMARTIN said that he had a lot of work at that time and needed help in reviewing the statements, so he asked NYPA Audit Department Director, J BRENNAN, to review the statements.
ple WITTE's expense statements to BRENNAN was not done because WITTE or his b
3E(S)
^ '
~
^~^
9615'O55154 960918 PDR FOIA MORGAN 96-359 PDR
~
had raised FP issues.
GILMARTIN recalled that, for a short period of time, he was responsible for the construction of an administration building at the James A. Fitzpatrick (JAF) Nuclear Generating Station. During that time, BARTLIK raised issues GILMARTIN said that the building's FP system did not meet code requirements.
i i
that, as a result of that concern, NYPA had their code compliance group look at it and determine that the building met the code. GILMARTIN does not think BARTLIK ever accepted that determinad on, but believed that issue was that BARTLIK raised the subject again "put to bed" approximately one year ago.
GILMARTIN recently, that the building's sprinkler system did not meet code.
i then talked to the code compliance people and the former building project engineer.
l GILMARTIN said that DOUGHERTY asked him to try to resolve the issue.
GILMARTIN got the people together again, and it was decided that they needed l
(
to know what the problems were and that they needed to be documented.
GILMARTIN said that he has tried to get BARTLIK to document his concern, but BARTLIK has not responded to the request. GILMARTIN said that he did not send l
l
\\,
BARTLIK a document requesting that he document his concern with the issue.
GILMARTIN was then questioned regarding whether he conducted an investigation into TARPINIAN's and STRAUSSER's backgrounds. GILMARTIN said that there were change orders (attached) to pay contractors, someone wanted to extend STRAUSSER and TARPINIAN before he (GILMARTIN) took his current position.
GILMARTIN opined that the change orders came to his attention in October 1994.
During that time, he was assisting DOUGHERTY in the Nuclear Engineering and The change orders were left on DOUGHERTY's desk'.
Design (NED) reorganization.
He and DOUGHERTY did not know what TARPINIAN and STRAUSSER were doing for NYPA-GILMARTIN at that time, so they wanted to get an idea of their capabilities.
pursued that by going to ETTLINGER or WITTE, and asked for TARPINIAN's and GILMARTIN said that was not done because someone STRAUSSER's resumes.
GILMARTIN l
complained to him about what TARPINIAN and STRAUSSER were doing.
said that he was trying to understand the need for keeping them employed at l
I NYPA.
GILMARTIN explained that when a change order is brought to a NYPA Vice President, people generally ask questions and information is needed before l
decisions can be made. GILMARTIN added that NYPA was under financial constraints at that time.
GILMARTIN knows that Ken VEHSTEDT complained about everyone at the NYPA White Plains Office (WPO), generally stating that, "you guys are real pains in the GILMARTIN said that the general complaint from IP3 and JAF was rear end."
. n cases t at was true.
thattheydidnotgetsupportfromWPO,andingr I
Jeffrey A. N ator, Investigator Office of Investigations i
Field Office, Region I Case No. 019 2
A
/3
~
C - (7 )
VECTRA
/v l
U March 14,1995
'D
?
N 27 g*7lfg Ms. Doreen Costabile i
Project Contract Administrator New York Power Authority 4
123 Main Street White Pfeins, N.Y.10601 Contract No. C 93 ZOO 28, Change Ordehnd 5
SUBJECT:
iP 3 Fire Protection Engineering Tasks
Dear Ms. Costabile:
Enclosed please find two copies each of the subject Contract Change Orders signed on behalf of VECTRA Technologies, Inc.
f We appreciate this opportunity to be of service to the New York-Power Authority. Please contact 1
us should you desire additional information or assistance.
Very truly yours,
)
~
Kevin Warapius Vice President KW:MES/lb)
Enclosures' F
- r. J)
, _,;., g.
i- : :.:.- --
.,:,,.,... p,.,:....,
...,........ m.
i POWER AUTHORITY OF THE STATE O.F NEW YORK 123 Main Street White Plains, N.Y. I'0601-3104 Page 1 of 2 Prepared By:
Doreen Costabile PRdJECD Indim Point Unit 3 and James A. FitzPatrick Nuclesr Power Plants
, CHANGE ORDER NO. 4 doutract No.
C 93 Z0028 4
Contract for:
Fire Protection Engineering Tasks 20 NON-NUCLEAN SAFET.Y RELATED Contractor: -
Vectra O CATEGORYII/III Address:
225 ScientiSc Drive Norcross, OA 30092-Attn.: Mr. Michael M. Migliaccio TO THE ABOVE NAMdD CONTRACTOR:
In accordance hth the above described contract, the following changes are hereby made to th Contract Documents and you are hereby directed to perform the work / services in accordanc thesh changes.
This Change Order No. 4, effective December'28,'1994, is issued to authorize Vectra to pr the services of Mr. John Tarpinian from January I through June 30,1995 at the indim Point 3 Nuclear Power Plant. Mr. Tarpinian shall support the resolution ofIP3 Fire Pmtection Start-up Issues and the completion ofIP3 Fire Protection ~ Design Basis Documents. Mr. Tarpinian tection close-out packages. Mr, Tarpinian be directly responsible for the pq-.Gon ofIP shall be paid the all inclusive hourly rate of for straight time and overtime.
p TOTALNOT-TO-EXCEED AMOUNTOFTHISCHANGEORDERNO.4
^
The Changes of contract price or time of performance specified herein, if any, shall be t complete and exclusive changes of such on account of the foregoing changes in Except as specifically modified herein, all terms and conditions of the original Cont previously approve,d Change Orders apply.
.t n
t
,. gn e e 7c p w.~ 4 /s n J
k
,o
======.....-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Contract No. C 93 Z0028 Contractor Name: Vectra Change Order No. 4 f
Page 2 of 2
.------------------------------------e Contractor is directed to sign all three (3) copies of this Change Order and return two (2) 4 fully executed copies to the individual whose name appears on the line entitled "P.repared By:" at the top of Page 1.
t PRICE
SUMMARY
Original Contract Amount........
6 Change Order No.1............
f6 Change Order No. 2............
Change Order No. 3............
Q1
/
Change Order No. 4............
p REVISED TOTAL AMOUNT.....
C 1
s Approved and Ordered:
g/ Atithorized Signature g
P#er Authority of the State of New York 3,
@a.,
O o g-i Date:
'2-h. / W og B1 Agreed:
YECTRA Technolooies. Inc.
2 Contractor
.) l M
D By:
M!
g Date:
a g
o
!E
$M a
g O
cc:
L. Retzer J. Dube - IP3 J. Galletta - JAF Purchasin R. Ventura R. Lauricella - IP3 P. Morris - JAF QA Dept.'
F. Bloise N. Eng - IP3 Contract Files - 16 M.Yu W. Sky - IP3 a0028Wde
.. s sm.
Se a
m
~
)
POWER AUTHORITY OF THE STATE OF NEW YORK 123 Main Street White Plains, N.Y. 10601-3104 Prepared By:
Doreen Costabile Page'l of 2
\\
Indian Point Unit 3 and James A. FitzPatrick Nuclear Power Plants PROJECT:
Contract No.
C 93 Z0028 CHANGE ORDER NO. 4 Fire Protection Engineering Tasks ED NON-NUCLEAR Contract for:
i gETY RELATBD Contractor:
Vectra
~
O CATEGORYII/Ill Address:
225 Scientific Drive Norcross, OA 30092 Attn.: Mr. Michael M. Migliaccio 4
TO THE ABOVE NAMED CONTRACTOR:
In accordance'with the above described contract, the following changes are hereby made to the Contract Documents and you are hereby directed to perform the work / services in accordance with these changes.
This Change Order No. 4, effective December 28,1994, is issued to authorize Vectra to provide the services of Mr. John Tarpinian from January 1 through June 30,1995 at the Indian Point 3 Nuclear Power Plant. Mr. Tarpinian shall support the resolution ofIP3 Fire Protection Start-up Issues and the completion ofIP3 Fire Protection Design "dasis Documents. Mr. Taipinian shall i
be directly responsible for the preparation ofIP fire tection close-out packages. Mr. Tarpinian s
- h.
/
shall be paid the all inclusive hourly rate of or straight time and ove: time.
TOTAL NOT-TO-EXCEED AMOUNT OF THIS CHANGE ORDER NO. 4.
The Changes of contract price or time of performance specified herein, if any, shall be the complete and exc.tusive changes of such on account of the foregoing changes in the wo Except as specifically modified herein, all terms and conditions of the original Contract and a previously approved Change Orders apply.
2002tn/dc
.ni.
/,
=.,,
..
=.................................w...
Contract No.E 93 Z0028 l
Contractor Name: Vectra Change Order No. 4 Page 2 of 2 l
........................................s...
l Contractor is directed to sign all three (3) copies of this Change Order and return two (2)'
fully executed copies to the individual whose name app, cars on the line entitled " Prepared By:" at the top of Page 1.
1 PRICE
SUMMARY
l t
Original Contract ' Amount........
6 Change Order No.1............
6
'b, j
Change Order No. 2.......,.....
l l
Changt drder No. 3............
Change Order No. 4........... $
l REVISED TOTAL AMOUNT.....
k._R.- (IA f
Approved and Ordered:
g uthorized Signature
.g P,
Authority of the State of New York t g g
%dds b
o.
Date:
s 52 w
Agreed:
e 2
Contractor E-Q o
D By:
h.
m u
\\
o s
Date:
w s
i b
U h.
cc:
L. Retzer J. Dube - IP3 J. Galletta - JAF'Purchacin5 O
2 R. Ventura R. Lauricella - IP3 P. Morris - JAF QA Dept.
F. Bloise~
N. Eng - IP3 Contract Files - 16 M.Yu W. Sky - IP3 a
$5 gQ
'T
/3 q,, /
m-n
CONTRACT AM'T/ CHANGE ORDER AM,'T ORIGINAL CONTRACT DOCUMENT C 93 Z0028/CO 4 JUBJECT:
Fire Protection Engineering Tasks DESCRIPTION:
PTRASE DO NOT DETACH SHEET Vec'tra VENDOR:
Plcr.se examine these contract documents and note any irregularities on this If everything is in order, please initial.
clip prior to my signing.
1.
INITIATING DEPARTMENT:
i/,/!)[R.Ventura Time: 'I ' 6, [-
Transmitted:
Date:
t l 4
\\
~
Remarks: DX b
( 31
_Initia W
w
- Return to Contracts - WPO 2.
LAW DEPARTMENT:
Time:
Transmitted:
Date:
Remarks:
Initial:
- Return to Contracts - WPO M. Garofalo
[.
APPRAISAL & COMPLIANCE SERVICES:
Time:
Transmitted:
Date:
1-3/-45 N
">'!A Sc*he*.
"I '-y AirM h M * **d G Remarks: //u W.
-[ &-m b pa.<a m wA m A de fM.
. Initial:
E TReturn to Contracts - WPO
//
D. Costabile 4.' CONTRACT ADMINISTRATOR:,////ff Time:
Transmitted:
Date:
/'
Remarks: h Initial: M Time:
5.
Ri?TiiiinM6: Transmitted: Date:
(Ir 1.'
r.
Remarks:--
n.
JOHN M. HOFF AWARD APPROVAL CC's:
COPY TO WAREHOUSE YES NO
.e 9
/8.m-
,/
l
'~
WMe Plains. New York 10601 t/;ge.gy
-([
~.
s22 unin sir 1 914 681.6200 s 7, y<
rc d }. m, o A,.,,*, v >
.t ye g'#
Memorandum
- > NewYo.rkPower
& Authority fe > "'
1M f
- /_ e-N' -
December 22,1994
, ;( --
fe Q
~~
/0
/7j. e g
Contract Agini) tion IPP-94-377 4
L 4gi VI
-A h j b'
}-h
~
/
TO:
J. FRANKO l
FROM:
R. VENT,URA
._ IP3 Project Endaming Services
~
i ThMMh SUBIECT:
Indian Po'at 3 Nuclear Power Plant Fire Protection Design Basis Darnmentc Channe Or1er to Vectra Technotories GSA C93-Z0028
^
h Please find attached a contract requisition in an amount not to exceedh '
20028 for the Vectra Technologies Incorporated's Fire Protecdon General Services Agreemen 1
services of Mr. John Tarpinian from January 1,1995 to Ipne 30,1995. Mr. Tarpinian's [
services are required to support the IP3 start-up effort and the completion ofIP3's Fire Protection Design Basis Documents.
i Mr.'Tarpinian is uniquely qualified for this assignment due to his familiarity with the IP3 l*'
Fire Protection Program and his participation in the preparation and subsequent completion k
of the JAF Fire Protection Design Basis Documents upon which IP3's documents are based.
In addition, Mr. Tarpinian is directly responsible for the preparation of IP3 fire protection close-out packages which are being prepared for the NRC fire protection faWon during the first quarter of 1995.
Mr. Tarpinian's services were previously provided through Cataract, Inc. Since the Cataract contract with NYPA expires on December 31,1994, this contract rei uisition requests that l
Mr. Tarpinian be switched to the Vectra Fire Protection General Services Agreement contract. Mr. Tarpinian was selected based on a review of resumes of submitted by various firms contracted with NYPA to provide engineering idwnnel.
If you should have any questions, please call Bob Ventura (Ext 3522) or 'Ihad Niver l
(Ext 3457) ofIP3 Project Engineering.,
l Attachment cc:
T. Dougherty A. Ettlinger J. Knucher J. Dube D. Ruddy R. Ventura b
R. Simmons T. Niver F. Bloise Records Station - WPO
~
.... f TeamWoIk/
9
/6 ME(S) carHN-CUR \\CONr-REQ 20bEf3.khb$D n }hbhk[I
- f nte0Iiiy I
7r o W
i 4,
, hMh INTERIM
. CONTRACT REQUISITION J
I' l
operating Pacinty/ support pepartment/ construction Project twoonal sensees pheck one)
DY, es or O No indian Point Nuclear Power Plant For Bid Bolipnation Only tensch set or suggeeeed bidders) Eesmesed cost: Nees:
$anch expected expendisses by year for mum 9eer conesot)
I D Law Sidder D Other then Law Ridder D Scie SJures O Dienge Order Noen: Ce3Z002.
./ [, ',
u For Award Only: Type of Anord (check one):
Vendor:
.mard 6 mesh
- M by year for mas ear eenemos; s
j Vectra Technologies. Inc:
j 800 Worcester Road Fiamingham, MA 01701 f
c;;.viion of RechiisG Purcitase or Serise:
To orovide the service d Mr..kt.. Teu;..;is, ficir January 1.1995 to June 30.1995. Mr. Tere;r.;er, is to mar-: t the Seinri of IP3 Fire Protection Start Ub lasug_gg(,.he uur.--M:.r of IP3 Fire ProteL-i C ;s-Epa rsmur. eats.
i se1:
Mr. Taroinlan's all 'ticiusive rate is~
" +- hour for rarudar lrr.e and ovei;..e.
1 1
3 E
4 5
N 1
3 Work (N AppBcable) j Job Order No work
~
1,l.u-l Cost Eement 8
3 1
ResponsRdDty Center H
5 4
5
. a-i 1
h assNeuy[.
5
_,( _
^3
["Y D
. Ventura wJ IP3/ Fire Protection
' PES /WPO f
R.
ime-
- r-.s menneer.: -
/
V'. b., 4 Y
- -t.er Director. PWR EiGcis l
nummer rsante uniy eneve m a a reviewn saw-wcw.wrws.. w*y.
case:
O casesoryI a cenegory M in Other QA noviewed by:
- g.y_N i
6ca. c,r. e 3 M. Garafalo ')f/. h/J,-
/.2 QR ffs
- m onen w-
~
j audget or O Not in Budget er. R. Simrnons Comment:
Oste:
Date:
--upprovec py;mt a.. mis ree:
mo ::
a n
j py; - s
--,s i me:
W.
Cahill E.V.P.
of Nuc. Gen.
'L V.P. Nuclear Ergir.;;.tg jT T. F. Dr=-y.eity j
contract Admin. Use only CTS Site @
Cc. T T.;^uT. eat No.
E!E!E E E'E Date:
i Bid Soldtston Follow Up: D E-:+-;^5-3 for Sid soldtebon
'.'R' -688 f
2
...e..
GE(S) camN-CUR \\ CONT REQC0028-D.VEC Prirmed:Fri 12/23/949:45r"
-- ~
POWER AUTHORITY OF THE STATE OF NEW YORK 123 Main Street White Plains, N.Y. 10601-3104 Page 1 of 2 Prepared By:
R. Robinson-Alfano Headquarters, James A. FitzPatrick Nuclear Power Plant, PROJECT:
and Indian Point Unit No. 3 Nuclear Power Plant CHANGE ORDER NO. 2 Contract No.
B 95 WOOO2 s
Contract for:
Field Engineers Sun Technical Services Contractor:
I[.[r y,
27285 Las Ramblas, Suite 280 Address:
Mission Viejo, Ca 92691 Attn: K. Jackson TO THE ABOVE NA!NED CONTRACTOR:
In accordance with the above described contra these changes.
This Change Order is issued to provide the temporary services o March 15,1995. Mr. Strausser's rates are as follows:
Straight time................
np Overtime.....................(
l Per diem...................... \\
w0002n.wp/ajb
'Oe fjl//,y'.
//
/ 6 s) r r
==========-----=====-===..
Sun Technical Services Contract No. B 95'W0002 Contractor Name:
Change Order No. 2 Page 2 of 2
..............========--.==--=============
The Changes of contract price or time of perfonnance specified berein, if any, shall b corftplete and exclusive changes of such on account of the foregoing changes in Except as specifically modified herein, all terms and conditions of the original Con previously approved Change Orders apply.
s PRICE
SUMMARY
M Original Contract Amount g
Change Order No.1 Change Order No. 2 REVISED TOTAL AMOUNT
(
Contractor is directed to sign all three (3) copies of this Change Order and return two (2) fully executed copies to the individual whose name appears on the line entitled "
By:" at the top of Page 1.
Approved and Ordered:
A Authorized Signature g Power Authority of the State of New York 2-I j
..t nj Date:
i D S ] f b5 k, n
- y h,
[:.j l a
Agreed:
0 g c
Contractor By:
t p
I,.
l Date:
i w0002n.wp/ajb L.&
?*
l 1
- Contract Files - 16
- 1. O U
e l
cc:
u-t a
i
.?g
"\\
o e.
{
i
+
~3' L
. _t 3.,
n,-
ij
/g
/3 c n..
SEH
& ~ r.
gg g
interim
- 7g
- 9 NewYoykPower.q,,g.uc<'f.
conteact aequi.sition J
W Authonty j,.fVf&
Requistion No.
1 5
Personal Services (check one)
Opera 5ng l'ackyISupport DepartmentConstrucson Project O Yes 0 %
NUCLEAR GENERATIONf Esfimated Cost Note:
(m. w e a,,., e, For Bid SoEcuation Only (affecA ist of ac9 pealed bidders):
s Note:
_e=* _ - - e. -
For Award Only: Type of Award (cher' w):
_enme ~
.e Low Bidder O Other Than Low ' er O Sole Source O Change Order g
Award Amount:
Vendor:
Sun Technical Services Inc.
Description of Required Purchase or Service:
,To provide the services'of James Strausser to March 1995 g-i 3E45N13 g;o* Tasu No. (W appEcabk)
Job Order No.
WoAAcever I
- ~.
H545 Coat Element 831 Responsibay Center Dept Locesort Facety Profed:
I Pr:pered by:
[
]
'I
}
l s
h Date:
Requesting Manager:
Tuo Jangary 12, 1995 Hugh J. Gilmartin Director, Engineeting Support Nocteer Plants Only (have QA&R rev6ewy Opte:
QA Reviewed y O Ca'+i 0 Category M O Other A
l
[
p 3 Date:
" ',41Ver5cetion (check, one):
Budget Cc s.e.t kin Budget or O Not h Budget By: y Date:
U[
Tus sed Soscaa%nge= by:
Tuo Ch e f N clear Or$ ce
^"*
Cah 2 '
- ~
_._ e, Date Bid SolcRation Fotow Up: O Accepted for Bid SokaaCon Ib
/b a
- p A.
.-