Text
m
)
-v OPERATING DATA REPORT DOCKET NO.
50-148 DATE And l A
~
. 1985 COMPLETED BY L
D. Unndard TELEPHONE (205) 899-5156 OPERATING STATUS
- 1. Unit Name:.
J seph M. Farley - Unit 1 Notes March, 1985
, 1) C'umulative data since
- 2. Reportas Penod:
1 - - 7, date'of
- 3. Licensed Thermal Power (MWt):
c mmercial operatign.
- 4. Namepiste Rating (Gross MWe):
nan S. Demga Electrical Rates (Net MWe):
829 860.9
- 6. Maximum C., - - M: Capacity (Gross MWe):
816.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
N/A O
This Month Yr..to.Dete Chulative 744 2,160 64,272
- 11. Hours In Reporting Period 724.6 2,140.6 44,269.6
- 12. N unber Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1.650.0
- 14. Hours Generator On-Line 678.8 2.094.8 43.119.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0,0 1,708,471 5,463,703 109,364,278
- 16. Gross Thermal Energy Generated (MWH) 1,//0,626 34,663,142
- 17. Gross Electrical Energy Generated (MWH) sag qqy
- 18. Net Electrical Energy Generated (MWH) 517.486 1.678.906 12.807.952
- 19. Unit Service Factor 91.2 97.0 67.I 91.2 97.0 67.1
- 20. Unit Availability Factor 85.2 95.2 64.0
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 81.9 93.g 61.6.
- 23. Unit Forced Outage Rate 8.8 3.0 12.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Ench):
Refueline/mnintonnnce ourneo. 4/ 5/85. nnnrnvimneolv st< tonb.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 08-06-77 08-09-77 INITIAL CRI'IICALITY INITIAL ELECTRICITY 08-20-77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 8
R FDR
'l7h
DOCXI.T NO.
sn_naa I
UNIT DAR April 4. 1985
.D. Woodard COMPLETED BY O
(205) 899-5156 TEU. PHONE SiONTil March, 1985 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL GlWe-Net)
(31We. Net) 809 g,
818 g7 816 709 2
gg
~
' 816--
- --..-- - g9.
609 3
812
"~~
606 4
814 3
21 7II 811 6
815 22 811 813 7
3 811 808 g
- 4
"'o O'
809 10 R14
- g 812 809
+
Ig g
12 808 23 805 0
804 13
- 3 0
804 14 30 15 8
33 804 16 117 (NSTR11CT10NS On this (onnst. list the 2venge daily unit power levelin MWe Net for each day in the reporting snunth. Campute io
, the nearest whole me; swat.
(9(17)
O
O O
O 5d-348 UNITSilOTDOWNS AND POWER REIMJCTIONS DOCKET NO.
UNIT NAME J.M. Farley - Unit 1 DATE April 4 1985 COMPLETED SY J. D. Woodard REPORT MONTil March. 1985 TELEPilONE (205) 899-5156 Ye E
~
w
.$ E
}
} Yj Lkensee Ev, Cause & Cassective No.
Date k
3g
,yac Event
<#v?
j}
E Aclios su sE 6
,U 2 g Repun #
y,cvens Recur:ence i
5 001 850313 F
65.2 A
3 85-002-00 SB ZIS The reac't'or tripped due to low-low water levels in steam generators IB and IC.
This was caused by closure of the turbine governor and intercept valves due to spuribus actuation of a limit switch on a main steam isola-tion valve. The limit switch on the main steam isolation valve has been replaced.
I 2
3 4
F: Funced Reason:
Meshod:
Ealithis G-Insasuctions S: Scheduled A-Equipment Failure (Emplain)
I Manual for Psepasaison of Data 84taintenance of Test 2 Manual Scraen.
Enuy Sheets for Licensee C-Refuelmg
- 3. Automatic Scram.
Event Repins (1.ER) File (NUREG-D-Regulasiuy Resisiccion 4-Osleet (Emplaisi) 0168)
E-Ope 4 or Training A license Examination F-Adadaistrasive 5
G Opesagional Ensus (Emplain)
Exhibit I-Same Source (9/77)
II Othes (Eaplain)
~
i i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MARCH, 1985 l
During the month of March, there was one (1) automatic shutdown which occurred on March 13, 1985.
The following major safety-related maintenance was performed in the month of March:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
2.
Replaced the turbine trip limit switch on main steam isolation valve 3370A. Spurious actuation of this limit switch led to the reactor trip which occurred on March 13, 1985.
~
4 1
OPERATING DATA REPORT DOCKET NO.50-14A DATE Aa*41 A 1985 COMPLETED BY 3.
D. L7mndard TELEPHONE (205) 899-5156 OPERATING STATUS g, y,gg y,,,.
Joseph M. Farley - Unit 1 Notes March, 1985
- 1) C'umulative data since
- 2. Reporting Peded:
12-1-77, date"of
- 3. Licensed Thennel Power (MWt):
'm commereial operatinn.
nan
- 4. Nameplese Radng (Gross MWe):
S. Domen Electrical Radng (Net MWe):
829 860.9
- 6. Maximum Dependeble Capacity (Gross MWe):
816.5
- 7. Manimusa E:f"- Capacity (Not MWe):
8, If Changes Occur in Capacity Ratings (Items Number 3 Thsough 7) Since Last Report. Give Reasons:
- N/A N/A
- 9. Power Level To Which Restricted. lf Any (Not MWe):
- 10. Rossens For Restrictions. If Any:
N/A I
This Month Yr..to Dete Cumulative 744 2,160 64,272
!!. Hours la Reporting Period 724.6 2,140.6 44,269.6
- 12. Number Of Hours Reactor Was Critical
- 13. Reestor Reserve Shutdown Hours o.O o.o 1.6sn.o
- 14. Hours Generator On.l.ine 678.8 2.094.8 43.119.2 0.0 0.0 o,o IS. Unit Reserve $butdown Hours 1,708,471 5,463,703 109,364,278
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrieel Energy Generated (MWH)
MAa io, 1,//u,sza 34,803,14z
- 18. Net Electrieel Energy Generated (MWH) 517.486 1.678.906 12.807.os?
- 19. Unit Service Factor 91.2 97.o 67.I 91.2 97.0 67.I
- 20. Unit Avedebdity Factor 85.2 95.2 64.0
- 21. Unit Capacity Factor (Using MDC Nt)
- 22. Unit Capacity Factor (Using DER Nt) al o 01 n 61.6.
- 23. Unit Forced Outage Rate H.8 3,n 12.8
- 24. Shutdowns Sciuduled Over Next 6 Months (Type. Dete, and Duration of Each t:
Refuelino/mnintonnnao nuenon. 4/ 5/RS. nnnenvfmneolv %t< i.ro oli o
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08-06 _77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 (9/77)
~
DOCXIT NO.
sn un I
UNIT j
DATE April 4 1985
.D. Woodard COMPLETED BY g.
(205) 899-5156 TELEPHONE 310NTl!
March, 1985 DAY AVERACE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL (MWe Net)
StWe-Net) 809 als g7 g,
816 709
]
2 gg
~'
~~~ 816 - --
......-- 3 9 - -
609 4
3
"~'
812 606 4
814 21 711 811 4
815 g,
811 813 7
23 811 j
g 24 808
(
?
810 25' 810 809 10 R16
- g 812 1g 27 809 32 808 23 805 f
0 804 l3 3
0 804 14 30 15 8
33 804 a
16 117 l
INSTRUCriONS On this format. list the 2verage daily unit power levelin MWe Net for each d:y in the reporting snunth. Campute to
, the nestest whole me;2 watt.
(997)
I
~
n.-_-.-,,-_-_n,.------.,-,._.-_-
.L,,,.-.
-, -,.,,,. - - - - - - - = -.. -. - -..
-e--, - --,,
n UNITSNLTIDOWNS ANDPOWER REDLICTIONS DOCKETNO. 50-348 LatGT N440E J.M. Farley - Unit 1 DATE April 4 1985 REPORT MONTBf Jarch. 1985 NTED BY J. D. Woodard TELEP900NE (205) 899-5156 s!
~
3,-
3,,,
1 I_E i 53 l'-
C'" ' Caaaca w gg
.e 5 a Eww a3 1
Ac 6,,,,,,
x iku o
ji2 l R*Puse a p,,,,, g,,,,,,,,,c, c-d 001 850313 F
65.2 A
3 85-002-00 SB ZIS The reac' tar tripped due to low-low water levels in steam generators IB and IC.
This was caused by closure of the turbine governor and intercept valves due to spuribus actuation of a limit switch on a main steam isola-tion valve. The Ifmit switch on the main steam isolation valve has been replaced.
l I
2 3
4 F: Fossed 56eason:
Mesinaal:
E=W G-Inasenctiums S: Sil.eduled A-Eaguapenens Fastisse(Earlain) 14tanual fes Psepasasian of Daa R Maensenance eiTest 2 Manual Scsaan.
Emssy $4 cess (as tiensee C-Refiseteng 3-Ansusenasic Sesame.
Escas Rep.as (t_ER) file (NUREG-D Regidasusy Resssicsiun 4-Ostics (Emplass) 016I)
EOpe asus Tsainnes & Ikense Emaansnasius F-Adadassaseive 5
G Opesassanal lasus (EngJa )
(9/77) ll Oshes (E qdain)
Exlist.is I - Saine Sinua
V MeNing Ademos Alabama Power Company 600 Nortn 18tn Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 i
H. P. Mcdonald Senior Vice President i
ii Fhntndge Buddmg dlOh3MOlDWCf t'+ wiv" m i' ' 1, oro I
April 10,1985 Docket No. 50-348 i
Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the March 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
l i
If you have any questions, please advise.
i
- trulyl, Yours ver
( f. \\
% 'l R. P. Mcdonald RPM /KWM: sam
(
1 Enclosures i,
xc: Director. IE (10 copies) l Director, Ril '(1 copy)
J i
I L
l o
i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MARCH, 1985 During the month of March, there was one (1) automatic shutdown which occurred on March 13, 1985.
The following major safety-related maintenance was performed in the month of March:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
2.
Replaced the turbine trip limit switch on main steam isolation valve 3370A.
Spurious actuation of this limit switch led to the reactor trip which occurred on March 13, 1985.
1 4
.