Summarizes 850502 Mgt Meeting in Charlotte,Nc to Brief NRC on Philosophy,Design & Plan of Implementing Standby Shutdown Facility & to Ensure That Security Aspects Adequate.Meeting Agenda & Attendees List Encl
ML20129F672
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/22/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8507170427
Download: ML20129F672 (3)


Text

.

- Official MAY 231985 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

1

SUBJECT:

MEETING

SUMMARY

- OCONEE - DOCKET NOS. 50-269, 50-270 AND 50-287 This letter. refers to the management meeting conducted, at our request, in Charlotte, N. C. on May 2,1985. This meeting concerned activities authorized by NRC Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear Station. The meeting was held to brief NRC on the philosophy, design and plan of implementing the Standby Shutdown Facility (SSF) at the Oconee Nuclear Station.

The NRC representatives had requested this meeting to ensure that the security aspects related to the SSF were adequate. Duke Power Company (DPC) presented the ,

subject matter as stated in the enclosed meeting agenda. Clarifications were requested from time-to-time.

Our concerns regarding the SSF were expressed to you at the meeting and your positive response to our concerns is appreciated. The NRC's response to the proposed DPC transition plan should be formulated within 30 days.

It is our opinion that this meeting was beneficial and has provided for a better understanding of the security aspects related to the SSF.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, 5 hd 3 L. 6hdee

[0.RogerD. Walker, Director Division of Reactor Projects I

Enclosures:

1. Meeting Agenda
2. List of Attendees cc w/encis:

M. S. Tuckman, Station Manager bec w/encis:

l NRC Resident Inspector Document Control Desk h507170427 850522 p ADOCM 05000269 State of South Carolina PDR RII RII RII Wy k\

CB :jk HCDance:jk VLBr[ownlee 5/A/ 85 5/g /85 5/p/85 y z

MAY tt 1985 Enclosure 1 Meetina Amenda Oconee Nuclear Station Security Transition Plan and

~

4 laplementation Schedule.

NRC/ Duke Power Company, j May 2, 1985 10:00 A.M.

Wachovia Center Conference Room #1704 4
1. Opening Remarks H. B. h cker 2.. Standby Shutdown Facility (SSF), R. L. Dobson j Technical Philosophy and Concept.
3. Security Transition Plan and W. A. Randlett Implementation Schedule.
4. Compensatory Measures for SFF Inoperability. W. A. Randlett
5. Conclusions and Closing Comments. N. A. .Rutperford i

s E

l 'C l

l ~_ , . _ , , ._. .

Enclosure 2 List of Attendees Oconee helear Station Security Transition Plan and g lementation Schedule.

NRC/ Duke Power Company.

May 2. 1985 10:00 A.M.  !

Wachovia Center Conference Room #1704  !

o o DUKE POWER COMPANY

1 i

B. B. Tucker Nuclear Production Department K. S. Canady. Nuclear Engineering

. N. A. Rutherford, Nuclear Engineering

} P. F. Guill. Nuclear Engineering l J. W. Davis. Nuclear Engineering i W. A. Randlett. Nuclear Department Services D. B. Adkins. Nuclear Department Services j W. R. Cross, h elear Department Services J.T. McIntosh. Oconee Nuclear Station '

] T. K. McQuarrie. Oconee Nuclear Station K. E. Susmer. Oconee Nuclear Station 1

T. C. McNeekin Design Engineering - Electrical 4

R. L. Dobson Design Engineering - Electrical B. L. Davenport. Design Engineering - Electrical R. F. Wardell. Design Engineering - Mechanical o U. S. NUCLEAR REGULATORY COMMISSION:

R. Nicolaras. NRC. ONRR B. C. Dance. NRC. Region II D. McGuire. NRC. Region II i

J. C. Bryant. NRC. Resident Inspector V. L. Brownice, NRC, Region II K. Barr. NRC. Region II ,

K. Sasser. NRC Resident Inspector l

-. . t _ , , - -. .- - v._, . , ,, e - , , - , , . , , , - , -