ML20129E731

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 85-14 Re Failure of Low Pressure Lube Oil Circuit During Preoperational Testing of Facility Diesel Generator.Initially Reported on 850408.Investigation in Progress.Next Rept Provided by 850614
ML20129E731
Person / Time
Site: Palo Verde 
Issue date: 05/01/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D, Kirscl D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32532-TDS, DER-85-14, NUDOCS 8506060582
Download: ML20129E731 (3)


Text

r_

e

' Gfh Arizona Nuclear Power Project M "r e

' [ [t l n P O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 May 1, 1985 I!/J _

ANPP-32532-TDS/PJC U. S. Nuclear Regulatory. Commission

['

Region V

),

1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Sub'j ect:

Interim Report - DER 85-14 A 50.55(e) Potentially Reportable Deficiency Relating To The Failure Of Low Pressure Lube Oil Circuit During Pre-Op Testing Of Unit esel Generator File: 85-019-026;

.4.33.2

Reference:

Telephone Conversation between L. Miller and P. J. Coffin on April 8, 1985

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by June 14, 1985, at which time a complete report will be submitted.

Very truly yours,

(

h.k.

cltt

~

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PJC/nj Attachment l

cc:

See Page Two i

8506060582 850501 PDR ADOCK 05000529 i

S PDR

E

-ANPP-32532-TDS/PJC-

'Mr.

D..F.

Kirsch iDER 85-14' Page Two-cc:'

. Richard DeYoung, Director.

' Office-of Inspection and Enforcement U.--S. Nuclear Regulatory Commission Washington, D. C.

20555'

-D.;B. Karner W.~E. Ide 1D..:B. Fasnacht-A. C.' Rogers D. E. Fowler L. A. Souza T. D. Shriver-C. N..Russo B. S. Kaplan J. :RJ Bynum -

J. M. Allen D. Canady

-A. C. Gehr.

W.'J. Stubblefield W. G. Bingham 1R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde '

B.'T. Parker T. J. Bloom D. N. Stover J. D. Houchen J..E. Kirby Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway Suite 1500 Atlanta, GA 30339 l'

r I

i t; g

INTERIM REPORT.- DER'85-14 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT (ANPP).

PVNGS UNITS 2.-3 t

I.~

~ Potential Problem With the Diesel Generator in the emergency mode, one low oil.

pressure actuation signal will trip. the generator output circuit breaker with the diesel engine continuing to run.. The output circuit breaker cannot be reclosed until the trip is reset.

II..

Approach To and Status Of Proposed Resolution Bechtel' Engineering is currently studying this problem to deter-

- mine reportability and technical justification for corrective

-action.-

.III. _ Projected ' Completion of Corrective Action and Submittal of the Final Report The complete evaluation and final report are forecast to be completed by-June 14,:1985.

.