Confirms Const Team Insp During Wks of 850603 & 10.Insp Will Focus on Const Mgt,Resumption of Const Activities Under New Organization & Reviews of safety-related Electrical, Mechanical,Structural & HVAC Sys
ML20129E455
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/22/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8506060497
Download: ML20129E455 (2)


Text

-

MAY Z 21985 Docket No. 50-443 Public--Service of_New Hampshire; ATTN: Mr. Robert J. Harrison

. President and Chief Executive Officer P. 0. Box 330 Manchester, New Hampshire 03105 Gentlemen:

Subject:

NRC Construction Team Inspection at Seabrook Nuclear

~ Generating Station This letter is to confirm NRC Region I intent to conduct a Construction Team Inspection at Seabrook Nuclear Generating Station during the weeks of June 3 and June 10, 1985. This inspection will focus on construction management and resumption of construction activities under the new organization and will in-clude reviews of safety related Electrical, Mechanical, Structural, Heating Ventilation and Air Conditioning (HVAC) Systems as well as Management and

~

Quality Assurance Systems. The results of the Seabrook Station Probabilistic Safety Analysis will be one of the bases for subsystems and components selec-tions. You are requested to assign principal licensee contacts for each of the inspection areas.

The Team will consist of:

Dr. P. K. Eapen, Team Leader A. C. Cerne, Assistant Team Leader A. E. ' Finkel, Lead Reactor Engineer K. Manoly, Lead Reactor Engineer S. D. Reynolds, Lead Reactor Engineer L. S. Cheung, Reactor Engineer J. M. Grant, Reactor Engineer An entrance meeting will be held at 3 p.m. on June 3,1985 to discuss the scope of the in,spection and an exit meeting will be held at 11 a.m. on June 14, 1985 to discuss the findings of the inspection. Additionally, your staff will be informed of any significant findings on a daily basis to facilitate resolution or prompt corrective actions.

Your cooperation with us in this matter is appreciated.

Sincerely,

~r" s Stewart D. Ebneter, Director Division of Reactor Safety 0FFICIAL RECORD COPY PK514 - 0001.0.0 05/22/85 g 8506060497 850522 fu,_ gjl l PDR ADOCK 05000443 -

i

( G PDR l O

p:- -

cc:

John DeVincentis, Director, Engineering and Licensing William B. Derrickson,. Senior Vice president Warren Hall, 0perational Services Supervisor Donald E.. Moody, Station Manager - Seabrook Station Gerald F. Mcdonald, Construction QA Manager Public Document Room (PDR)

Local Public Document Center (LPDR)

Nuclear Safety Information Center (NSIC)

-NRC Resident Inspector-State of New Hampshire bec:

Region I Docket Room (with concurrences)

R.-M. Gallo, Chief, Section 2A, PB#2, DRP J. Grant, DRP RI:DRS RI:DRS RI:DRS Eapen .Betten usen Ebne r 5'

0FFICIAL RECORD COPY PK514 - 0002.0.0 05/22/85 I

_._