ML20129E083

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-250/OL-85-01 of Exam Administered on 850430.Exam Applied to Units 1 & 2
ML20129E083
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/15/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML20129E087 List:
References
85015, NUDOCS 8507160729
Download: ML20129E083 (2)


Text

. s / nd s%

May 15,1985 Florida Power and Light Company ATTN: Mr. J. W. Williams, Jr.

Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

TURKEY POINT EXAMINATION REPORT 250/0L-85-01 The NRC administered an examination on April 30, 1985 to one employee of your company who had applied for a license to operate the Turkey Point Nuclear Plant.

At- the conclusion of the examination, the examination findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for the examined individual is provided as Enclosure 2.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosure 1 will be placed in NRC's Public Document Room unless you notify this office by telephone within 10 days of the date of this letter and submit written applica-tion to withhold information contained therein within 30 days of the date of this letter. Such application must be consistent with the requirements of 10 CFR 2.790 b (1). Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790 a and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by VLBrownlee)

Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

1. Examination Report 50-250/0L-85-01
2. Table of Examination Results (Official Use Only-Privacy Act Information) cc w/encls. 1 & 2:

K. N. Harris, Vice President Turkey Point Nuclear Plant K. E. Beatty, Nuclear Energy Department Training Specialist C. J. Baker, Plant Manager W. C' Miller, Site Training Director bec w/encls: (See page 2) \

0507160729 850515 PDR ADOCK 05000250 G PDR. EE M )

, s Florida Power and Light Company 2 May 15,.1985 bec w/encls. 1 & 2:

Senior Resident Inspector bec w/ encl. 1:

Project Manager, NRR State of Florida Operator Licensing Branch, DHFS,NRR Document Control Desk RII RII RII RII RII d

TRogers @ lson BAWi AFGibson PRBemis E rod 05//0/85 05/ to /85 05/g/8E., 05/i3/85 05/jg/85