Discusses Insp Rept 50-458/85-33 on 850415-0627 & Forwards Notice of Violation
ML20129D298
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/12/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20129D300 List:
References
NUDOCS 8507160485
Download: ML20129D298 (2)


See also: IR 05000415/2006027

Text

'

,

-

.

.

JUL 121985

In Reply Refer To:

Docket: 50-458/85-33

Gulf States Utilities I

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This refers to the inspection conducted by Messrs. L. D. Gilbert and W. M.

McNeill of this office during the period April 15-June 27,1985, of activities

authorized by NRC Construction Permit CPPR-145 for River Bend, Unit 1, and to

the discussion of our findings with R. B. Stafford and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included safety-related pipe supports and

verification of as-built drawings for piping systems. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

These findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

Details of this inspection will be included in a report to be issued in the

near future and identified as NRC Inspection Report 85-33.

,

B /A RPB1 A

RI

LDGilbert

1/B

f MM il JPJ4udon

RPB1

EHJohnson

7/6/85

!

1/ /85 1/5/85 1 / 7 /85

0507160405 050712 8

ADOCK 0500 )g

gDR

~

r-

.'

'fu_.

Gulf States Utilities -2-

The response directed by this letter and the accompanying Notice is not

< subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

_

Sincerely,

ori 'rrt Pr. nod BY

E. H. Jchnson

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosure:

Appendix A - Notice of Violation

cc w/ enclosure:

- Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bectoDMB(IE01)

bec distrib. by RIV:

RPB1 R. P. Denise, DRSP

Resident Inspector R. D. Martin, RA

SectionChief(RPB1/A) D. Weiss,LFMB(AR-2015)

' MIS System L. D. Gilbert, RPB1/B

RSTS Operator W. M. McNeill, RPB1/A

EP&RPB

RIV File