ML20129D298
| ML20129D298 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/12/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20129D300 | List: |
| References | |
| NUDOCS 8507160485 | |
| Download: ML20129D298 (2) | |
See also: IR 05000415/2006027
Text
'
,
-
.
.
JUL 121985
In Reply Refer To:
Docket:
50-458/85-33
Gulf States Utilities
I
ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
Beaumont, Texas 77704
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and W. M.
McNeill of this office during the period April 15-June 27,1985, of activities
authorized by NRC Construction Permit CPPR-145 for River Bend, Unit 1, and to
the discussion of our findings with R. B. Stafford and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included safety-related pipe supports and
verification of as-built drawings for piping systems. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
Details of this inspection will be included in a report to be issued in the
near future and identified as NRC Inspection Report 85-33.
,
RI
1/B
f
B /A
RPB1 A
RPB1
LDGilbert
MM
il
JPJ4udon
EHJohnson
!
7/6/85
1/ /85
1/5/85
1 / 7 /85
0507160405 050712
)g
ADOCK 0500
8
gDR
r-
~
.'
'fu_.
Gulf States Utilities
-2-
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
<
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
_
Sincerely,
ori 'rrt Pr. nod BY
E. H. Jchnson
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosure:
Appendix A - Notice of Violation
cc w/ enclosure:
- Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bectoDMB(IE01)
bec distrib. by RIV:
RPB1
R. P. Denise, DRSP
Resident Inspector
R. D. Martin, RA
SectionChief(RPB1/A)
D. Weiss,LFMB(AR-2015)
' MIS System
L. D. Gilbert, RPB1/B
RSTS Operator
W. M. McNeill, RPB1/A
EP&RPB
RIV File