Text
c
'
. .
'
~
.
2
.
MAY 0 21985 -
'
DocketLNo. '50-293
License No. DPR-35
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, MA 02199
Gentlemen:
Subject:
Inspection No. 50-293/84-41
This refers to the safety inspection conducted by Mr. E. Woltner of this office
on December 10-13, 1984, at Pilgrim Generating Station, Plymouth, Massachusetts,
of ' activities authorized by NRC License No. DPR-35 and to the discussions of
our findings held by Mr. Woltner with Mr. Oxsen of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance witn NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These vio-
lations have been categorized by severity level in accordance with the revised
NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register-
',.
'
Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this
letter and in preparing your response, you should follow the instructions in
,2
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in-the NRC Publi: Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit written
application to withhold information contained therein, within 25 calendar days
~
from the date of transmittal ictter. Such application must be consistent with
the requirements of 10 CFR 2.790(b)(1).
If we do not hear from you in this
.
regard within the specified periods noted above, the report will te made avail-
able to the public and placed in the Public Document Room.
The telephone
notification of your intent to request an extension of the 10-day period which
you believe necessary should be made to the Chief, Document Control Section,
USNRC Region I, at (215) 337-5223.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
\\
OFFICIAL RECORD COPY
DLPILGRIM84-41 - 0001.0.0
P' Ey gg
85
, ,
PNr
_
'
.
,.
,
Boston Edison Company M/C Nuclear
2
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed BY:
Wlhh$WW
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosures:
1.
Appendix A, Notice of Violation.
2. 'NRC Region I Inspection Report No. 50-293/84-41
cc w/encis:
.
VA..V. Morisi, Manager, Nuclear Management Services Department
/C. J. Mathis, Station Manager
' Joanne Shotwell, Assistant Attorney General
r Paul Levy, Chairman, Department of Public Utilities
< W. J. Nolan, Chairman, Plymouth Board of Selectmen
/ Plymouth Civil Defense Director
g Senator Edward P. Kirby.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
'
M RC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/encls:
44 Region I Docket Room (with concurrences)
. " Senior Operations Officer (w/o encis)
- Section Chief, DRP'
N
<
RI:DRSS
RI:DRSS
RI:DRSS
RADRSS
Woltner/ms
Har ster'
Bellamy
Mart
il$re
4 ,,es
4,
es
OFFICIAL RECORD-COPY
DLPILGRIM84-41 - 0002.0.0
04/16/85
__,
_,