ML20129C306

From kanterella
Jump to navigation Jump to search
First Interim Deficiency Rept NCR BL-A-85-05-D-01 Re Insp of HVAC Duct Supports.Initially Reported on 850502.Records Accountability Program Re Insp Documentation Under Review. Next Rept Will Be Submitted by 850831
ML20129C306
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 05/30/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8507160135
Download: ML20129C306 (2)


Text

4 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 1630 Chestnut Street Tower II c.n c__

May 30, 1985 BLRD-50-438/85-15 BLRD-50-439/85-15 E5 U.S. Nuclear Regulatory Commission Region II co

~~

Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - INSPECTION OF HEATING, VENTILATING, AND AIR-CONDITIONING DUCT SUPPORT - BLRD-50-438/85-15 AND BLRD-50-439/85 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector A. Hardin on May 2, 1985 in acc;rdance with 10 CFR 50.55(e) as NCR BL-A-85-05-D-01.

Enclosed is our first interim report. We expect to submit our nar.t report on or about August 31, 1985.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY 977WL

4. W. Hufham, Manager Licensing and Regulations Enclosure cc:

Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8507160135 850530 n;y~c N g- >

._ g PDR ADOCK 05000438 s

S PDR

\\

foy

\\

~o-,,~-

a ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 INSPECTION OF HEATING, VENTILATING, AND AIR-CONDITIONING DUCT SUPPORTS BLRD-50-438/85-15 AND BLRD-50-439/85-15 10 CFR 50.55(e)

NCR BL-A-85-05-D-01 FIRST INTERIM REPORT Description of Deficiency A quality assurance audit identified potential deficiencies in documenting the inspection of heating, ventilating, and air-conditioning (HVAC) duct supports. The audit team, through interviews and investigation, was unable to find conclusive evidence that required installation inspections of numerous insulated HVAC supports had been performed and documented and was unable to determine the quality status of the HVAC supports.

Interim Progress TVA is evaluating the audit findings to determine what corrective actions are required. The Records Accountability Program is being reviewed to determine if deficiencies exist related to the documentation of HVAC duct support inspections. This review will be used to determine the nature and extent of the deficiencies.

- -. -