Proposed Tech Spec Changes to Section 4.1 Requiring Reactor Shutdown to Condition 4 Prior to Mississippi River Level Exceeding 640 Ft at Facility
ML20129A890
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/25/1985
From:
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML20129A871 List:
References
NUDOCS 8507150406
Download: ML20129A890 (1)


Text

, . . +

4.1 GENERAL 4.1.3 During periods when the reactor is in Condition 3, 4, or 5, either Channel 1 or 2 of the Nuclear Instrumentation System shall be in operation and shall be monitored by the operator.

4.1.4 Whenever the reactor contains one or more fuel elements, any operations from points outside the control room of equipment which may affect the reactor shall be conducted under the direction, or with the knowledge, of the control room operator.

4.1.5 If the plant is operational during a tornado warning, the Shift Supervisor on duty shall keep informed of the actual tornado activity which may approach the plant. In the event that reports indicate an imminent tornado strike at or near the LACBWR plant, the Shift Supervisor shall reduce reactor power to a level which permits prompt reduction of power generation to station load. However, the Shift Supervisor shall be instructed to discontinue plant operation if, in his judgment, this action is required to ensure plant safety.

4.1.6 If the plant in in CONDITION 1, 2, or 3 and the Mississippi River level adjacent to the plant reaches 639.2' and is predicted to exceed 640', commence reactor shutdown and be in CONDITION 4 prior to the river level exceeding 640'.

4.2 OPERATING LIMITS 4.2.1 Reactor Building 4.2.1.1 CONTAINMENT INTEGRITY shall be maintained in Conditions 1, 2, 3 and during:

(a) CORE ALTERATIONS, (b) handling of irradiated fuel, or (c) there is fuel in the reactor and any control rod is withdrawn.

l 1

l 1

t 8507150406 850625 PDR ADOCK 05000409 P PDR

__ . _-