ML20129A520

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144
ML20129A520
Person / Time
Site: Oyster Creek
Issue date: 10/10/1996
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129A524 List:
References
6730-96-2157, NUDOCS 9610220171
Download: ML20129A520 (2)


Text

- _ _.

i

.. ,' l 8

GPU Nuclear,inc.

l U S Route #9 South 4

NUCLEAR '*

p,,i',*ll*,**L",,,a Tel 609-9714000 October 10, 1996 6730-96-2157 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Operating License No. DPR-16 Docket No. 50-219 Technical Specification Change Request (TSCR) hu. 203 RE: " PROTECTIVE INSTRUMENTATION REQUIREMENTS" Technical Specification (TS) 24-Month Surveillance Extensions

References:

(1) Generic Letter No. 91-04, dated April 2,1991 .

l (2) GPUN ietter, dated March 2,1990 - TSCR No.185 i (3) Amendment 144 to Provisional Operating License No. DPR-16, dated January 10,1991 Pursuant to 10 CFR 50.90, GPU Nuclear Corporation (GPUN), operator of the Oyster Creek Nuclear Generating Station (OCNGS), Operating License No. DPR-16, requests a change to the Appendix A of the license.

Also enclosed is one signed copy of the Cvanate of Service for this request which confirms 3 service to the senior official of the township in which the facility is located. g i

Oyster Creek commenced its first 24 month refueling cycle after the startup from the 13R refueling in September 1990. Reference (2) provided justification to revise the Tech. Specs. for the new operating cycle, and to extend the interval for a number of surveillances associated with h, i() l the initial phase ofimplementation. This TSCR proposes to revise an additional group of

/ j J surveillances wherejustification has been completed following receipt of Reference (3). The guidance contained in Reference (1) has been addrued where applicable.

9610220171 961010 f PDR ADOCK 05000219 ,

P PDR t

'l 673Q-96-21,57 j TSCR No. 203 Page 2 This change request has been reviewed in accordance with Section 6.5 of the OCNGS Technical Specifications. Using the standards in 10 CFR 50.92 we have concluded that these proposed  :

changes do not constitute a significant hazards consideration.

Implementation of this change can be made effective immediately upon receipt of the operating license amendment, as no plant modifications are necessary; however, it is requested that 60 days be allowed following receipt of the license amendment m order to make any required procedural  !

or documentary changea Pursuant to 10 CFR 50.9) 'b)(1), a copy of this change request has been sent to the State of New Jersey Department of Envemental Protection.

Very truly yours, Michael B. Roche

! Vice President and Director Oyster Creek l

l

}

i

{ MBR\gmg

Enclosures:

1) Technical Specification Change Request No. 203 j 2) Certificate of Service for Technical Specification Change Request

! No. 203 i

cc: OCNGS NRC Project Manager Administrator, Region I

]

OCNGS NRC Sr. Resident inspector l l

i i

1 h

l A

L Ilic No. 9M169 i