Forwards Insp Rept 50-293/96-09 on 960916-20 & Notice of Violation.Failure to Perform Audits of Access Authorization Program within 12 Months of Effective Date of Implementation & at Least Every 24 Months Thereafter
ML20129A022
Person / Time
Site: Pilgrim
Issue date: 10/11/1996
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20129A027 List:
References
NUDOCS 9610220005
Download: ML20129A022 (3)


See also: IR 05000293/1996009

Text

. - . . . - - . - . . .. - - -

'

.

  • . '

,

.i

, October 11, 1996

! .

E. Thomas Boulette, PhD

Senior Vice President - Nuclear

Boston Edison Company

. Pilgrim Nuclear Power Station

.

600 Rocky Hill Road

'

Plymouth, Massachusetts 02360-5599

,

SUBJECT: INSPECTION REPORT NO. 50-293/96-09

- Dear Mr. Boulette:

.

-

This letter refers to the NRC's safety issues program inspection of your Access

j Authorization Program conducted by Messrs. G. C. Smith and E. B. King of this office at ,

4

the Pilgrim Nuclear Power Station on September 16-20,1996. Areas examined during the )

J inspection are identified in the enclosed report. The inspection consisted of interviews and  !

examination of selected procedures and representative records. Our findings were

, discussed with Mr.~ J.F. Alexander and other members of your staff by Mr. King at the i

conclusion of the inspection. I

! The inspectors determined that, in general, you had an effective program in place that

provides assurance that individuals granted unescorted access are trustworthy and reliable,

and do not constitute an unreasonable risk to the health and safety to the public, including

a potential to commit radiological sabotage. l

. l

l

However, based on the results of this inspection, two of your activities appeared to be in i

violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice). l

7

You are required to respond to that Notice and, in doing so, should follow the instructions l

therein. Particular attention should be paid to actions to prevent recurrence. The

~

violations, which were not consistent with the requirements of the NRC-approved Physical

Security Plan, involved failures to perform audits of your access authorization program

within 12 months of its effective date of implementation and at least every 24 months

thereafter, and failure to properly adhere to the audit requirements for the

! contractor / vendor access authorization programs accepted by you, in your response to the

Notice, please address your planned corrective actions to preclude recurrence. l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in'the NRC Public Document Room (PDR).

.

2.10071

~

9610220005 961011 "

__/ . 'A

PDR ADOCK 05000293 / IU

G PDR g

. -. __ _-

_ .

. - _ _ _ . _ _ . _ _ _ _ _ . . _ . _ _ _

l

...

i

"

. l

1

Mr. E. Thomas Boulette 2 ]

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY: i

i

'

<

1

Richard R. Keimig, Chief

Emergency Preparedness and
Safeguards Branch

Division of Reactor Safety

'

i

Docket No. 50-293

Enclosure: NRC Region I inspection Report No. 50-293/96-09

'

cc w/ encl:

L. Olivier, Vice President - Nuclear and Station Director

T. Sullivan, Plant Department Manager

N. Desmond, Regulatory Relations

D. Tarantino, Nuclear information Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

The Honorable Therese Murray

'

The Honorable Linda Teagan

8. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Chairman, Nuclear Matters Committee

Plymouth Civil Defense Director

P. Gromer, Massachusetts Secretary of Energy Resources

J. Shaer, Legislative Assistant

J. Fleming

t A. Nogee, MASSPIRG

,

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

,

Commonwealth of Massachusetts, SLO Designee

.

x

, r - .,- . , - .

- -___ ___-_____-_---_ _ __ _

_ . . - ..

.

.

Mr. E. Thomas Boulette 3

Distribution w/ encl:

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NSIC)

D. Screnci, PAO

NRC Resident inspector

J. Wiggins, DRS

R. Conte, DRP

H. Eichenholz, DRP

C. O'Daniell, DRP

DRS File (1)

Distribution 'w/enci (VIA E-MAIL):

S. Bajwa, NRR

A. Wang, NRR

W. Dean, OEDO

R. Correia, NRR

R. Frahm, Jr., NRR

Inspection Program Branch, NRR (IPAS)

L. Cunningham, NRR

l

l

l

l

!

!

l

l

l

l

l

l

DOCUMENT NAME: G:\EP&SB\ KING \PIL9609. INS

Ta receh,e a copy of this docu,nont, Ind6cate in the bos: "C* = Copy ,without attachment /enclosurp"E" = Copy with attachment / enclosure *N' = No copy

0FFICE- DRS/RI l DRS/RI /// l DRS/RI f lN D <P/ eer 4 l

NAME EKING W GSMITHEP RKEIM%- A courrf)DJ/

DATE 10/ // /96 10/ // //96 10/ // /96 /o/n/Yt//'

0FFICIAL RECORD COPY w/n m inw