Text
.
- . . . - -
.
-
. .
..
-
-
-
'
.
'
.
,
.i
October 11, 1996
,
!
.
E. Thomas Boulette, PhD
Senior Vice President - Nuclear
Boston Edison Company
Pilgrim Nuclear Power Station
.
600 Rocky Hill Road
.
Plymouth, Massachusetts 02360-5599
'
,
SUBJECT:
INSPECTION REPORT NO. 50-293/96-09
Dear Mr. Boulette:
-
.
This letter refers to the NRC's safety issues program inspection of your Access
-
j
Authorization Program conducted by Messrs. G. C. Smith and E. B. King of this office at
,
the Pilgrim Nuclear Power Station on September 16-20,1996. Areas examined during the
4
J
inspection are identified in the enclosed report. The inspection consisted of interviews and
examination of selected procedures and representative records. Our findings were
discussed with Mr.~ J.F. Alexander and other members of your staff by Mr. King at the
,
conclusion of the inspection.
!
The inspectors determined that, in general, you had an effective program in place that
provides assurance that individuals granted unescorted access are trustworthy and reliable,
and do not constitute an unreasonable risk to the health and safety to the public, including
a potential to commit radiological sabotage.
.
However, based on the results of this inspection, two of your activities appeared to be in
violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice).
You are required to respond to that Notice and, in doing so, should follow the instructions
7
~
therein. Particular attention should be paid to actions to prevent recurrence. The
violations, which were not consistent with the requirements of the NRC-approved Physical
Security Plan, involved failures to perform audits of your access authorization program
within 12 months of its effective date of implementation and at least every 24 months
thereafter, and failure to properly adhere to the audit requirements for the
contractor / vendor access authorization programs accepted by you, in your response to the
!
Notice, please address your planned corrective actions to preclude recurrence.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in'the NRC Public Document Room (PDR).
2.10071
.
~
9610220005 961011
__/ .
'A
"
ADOCK 05000293
/
IU
G
g
.
-.
-
_
.
. -
_ _ _
. _ _ . _ _
_
_ _ . . _ . _ _
_
l
...
"
.
1
Mr. E. Thomas Boulette
2
]
Your cooperation with us is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
i
i
<
'
1
Richard R. Keimig, Chief
Safeguards Branch
'
Division of Reactor Safety
i
Docket No. 50-293
Enclosure: NRC Region I inspection Report No. 50-293/96-09
'
cc w/ encl:
L. Olivier, Vice President - Nuclear and Station Director
T. Sullivan, Plant Department Manager
N. Desmond, Regulatory Relations
D. Tarantino, Nuclear information Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
The Honorable Therese Murray
'
The Honorable Linda Teagan
8. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Chairman, Nuclear Matters Committee
Plymouth Civil Defense Director
P. Gromer, Massachusetts Secretary of Energy Resources
J. Shaer, Legislative Assistant
J. Fleming
t
A. Nogee, MASSPIRG
Regional Administrator, FEMA
,
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Commonwealth of Massachusetts, SLO Designee
,
.
x
,
r
-
.,-
. , - .
-
-
-
- ---
_
.
.
-
..
.
.
Mr. E. Thomas Boulette
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC
Nuclear Safety Information Center (NSIC)
D. Screnci, PAO
NRC Resident inspector
J. Wiggins, DRS
R. Conte, DRP
H. Eichenholz, DRP
C. O'Daniell, DRP
DRS File (1)
Distribution 'w/enci (VIA E-MAIL):
S. Bajwa, NRR
A. Wang, NRR
W. Dean, OEDO
R. Correia, NRR
R. Frahm, Jr., NRR
Inspection Program Branch, NRR (IPAS)
L. Cunningham, NRR
l
DOCUMENT NAME: G:\\EP&SB\\ KING \\PIL9609. INS
Ta receh,e a copy of this docu,nont, Ind6cate in the bos: "C* = Copy ,without attachment /enclosurp"E" = Copy with attachment / enclosure
- N' = No copy
0FFICE-
DRS/RI
l
DRS/RI ///
l
DRS/RI f
lN
D <P/ eer
4
l
NAME
EKING W
GSMITHEP
RKEIM%-
A courrf)DJ/
DATE
10/ //
/96
10/ // //96
10/ // /96
/o/n/Yt//'
0FFICIAL RECORD COPY
w/n m inw