Final Deficiency Rept 84-13 Re Electrical Butt Splices Not Installed Per Manufacturer Recommendations.Field Insps Rescheduled to Start in Late May 1985 W/Completion Anticipated by Nov 1985
ML20129A011
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/10/1985
From: Miosi A
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0108K, 108K, 84-13, NUDOCS 8506040438
Download: ML20129A011 (2)


Text

'

7)m&

Commonwealth Edison one First National Plaza. Chicago, Illinois Address Fleply to: Post Office Box 767 Chicago, lilinois 6M90 May 10, 1985 Mr. James.G..appler Regional Admiaistrator U. S. Nuclear Regulator Commission Region III 799 Roosevelt Road Glen Elljn. IL 60137

Subject:

Braidwood Station Units 1 and 2 10 CFR 50.55e No. 84-13 Final Report Electrical Butt Splices NRC Docket Nos. 50-456/457 References (a):

E. D. Swartz letter to J. G. Keppler dated September 5, 1984 (b):

D.H. Smith letter to J. G. Keppler dated November 1, 1984 (c):

D. H. Smith letter to J. G. Keppler dated February 19, 1985

Dear Mr. Keppler:

References (a), (b) and (c) provided information concerning a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding electrical butt splices not installed in accordance with the manufacturer's recommendations at our Braidwood Station.

The purpose of this letter is to provide an updated status of the corrective actions that will be taken to resolve this issue.- This letter is considered to be a final report.

As previously indicated in Reference (c), a listing of all cables / equipment potentially utilizing butt splices was being developed using documentation associated with completed terminations.

This listing has recently been completed and allows reinspection to be waived for panels in which all field cable terminations occurred after:the installation / inspection procedure upgrades (5/1/84).

8506040438 850510 PDR ADOCK 05000456 ihkhl 14 ddb S

PDR, i

i D j378 27

7

, y,g :.-c.

- s :.;;

1-2--

The-field inspections-have been re-scheduled to start'in ilate-May, ~1985. : Based'on this start date, a completion in ' November,

'1985'is now anticipated.; At that time the results13f these

, inspections will.be-available for.your review.

~Very truly:yours, k

, Anthony D..Miosi Nuclear Licensing Administrator L/k1j'

~

cc: ~ NRC-Resident Inspector --Braidwood i

Director 13f InspectionLand Enforcement

' U.S. Nuclear RegulatoryLCommission

. Washington, D.C. 20555