UPtMA11N4 UAIA RtPURT DOCKET NO. 50 - 277 DATE JULY 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEE R-IN-CH A RGE LICENSING SECTION GENER ATIDN DIV15104-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME PEACH BOTTOM UNIT 2 1 NOTE 58 UNIT 2 CONTINUED ITS l
l l
- 2. REPORTING PERIOD:
JUNE, 1985 l
SCHE DULED SiUTDOWN FOR l
g
- 3. LICENSED THERMAL POWER (MWTit 3293 l
ITS SIXTH REFUELING AND l
g
- 4. NAMEPLATE RATING (GROSS MWEl t 1152 l
MAINTENANCE OUTAGE.
I g
l
- 5. DESIGN ELECTRICAL RATING (NET MWEl t 1065 l
l l
- 6. MAX 1 MUM DEPENDABLE CAPACITY (GROSS MWEls 1098 I
l i
I
- 7. MAXIMUM DEPENDAbLL CAPACITY (NET MWEla 1051 l
l
- 8. IF CHANGES OCCUR IN C APACITY RATINGS (ITEMS NUMBER 3 THROUGH 71 51NCE LAST REPORT, GIVE RE ASONS
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEl*
- 10. RE ASDNS FOR RESTRICT 10NS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. h00R5 IN REPORTING PERIOD 720 4,343 96,335
0 62,283.6
- 13. REACTOR RESERVE SHUT 00WN HUURS 0.0 0.0 0.0
- 14. HOURS GENERATOR QN-LINE 0.0 0.0 60,556.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHI 0
0 178,420,001
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O
O 58,718,660
- 18. NET ELECTRICAL ENERGY GENERATED (HWHI
~11,771
-48e241 56e214,097
- 19. UNIT SERVICE FACTOR 0.0 0.0 62.9
- 20. UNIT AVAIL Ah!LITY F ACTOR 0.0 0.0 62.9
- 21. UNIT CAPACITY FACTOR (USING MOC NET) 0.0
. 0.0 b5.5
- 22. UNIT CAPACITY F ACTOR (USING DER NE TI 0.0 0.0 54.8 p,
5 0'
- 23. UNIT FORCED OUT AGE RATE 0.0 0.0 12.5 0NQ'8' 24. 5HUTLOWNS SCHEDULED OVER NEXT 6 MONTH 5 CH3 (TYPE, DATE, AND DURATION OF EACHit on SCHEDULED SHUTDOWN FOR REFUELING AND MAINTENANCE, 03 0 STARTED 4/27/84
- 25. IF 5HUTDOWN AT END OF REPORT PER10be ESTIMATED DATE OF STARTUP8 07/13/85 d
44 n
b%
INITIAL CRITICALITY go:
\\k\\
O mgge INITIAL ELECTRICITY COMMERCIAL OPERATION n-
OPERATIE DATA REPORT DICKET NO. 50 - 278 DATE JULY 15,1965 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGI NEE R-I N-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 DPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 l NOTES UNIT 3 INCURRED TWO FORCED 1
1 I
- 2. REPORTIM PER100s JUNE, 1985 l
LDAD REDUCTIONS. UNIT IN l
l l
- 3. LICENSED THERMAL POWERIMWT):
3293 l
poker COASTDOWN.
l l
l
.~.
- 4. NAMEPLATE RATING (GROSS MWE):
1152 1
1 I
I S. DESIGN ELECTRICAL RATING INET MWEls 106S I
l l
l
- 6. MAX 1MUN DEPENDABLE CAPACITY (GR055 MWE ): 1094 l
l l
1
- 7. MAXIMUM DEPENDA&LE CAPACITY (NET MWEls 1035 l
l S. IF CHAMES DCCUR IN CAPACITY RATINGS IITEMS NUMBER 3 THROUGH 7) 11NCE LAST REPORT, GIVE RE ASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOUR $ IN REPORTI E PERIOD 720 4,343 92,231
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,704.7 68,262.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 3,653.3 66,518.4 t
- 15. UNIT RESERVE SHUTDOWN HOUR 5 0.0 0.0 0.0
- 16. Gross TH;RMAL ENERGY GENERATED (MWH) 1,732,536 10,017,600 194,217,408
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 546,000 3,249,600 63,757,140
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 514,669 3,104,625 61,213,92T
- 19. UNIT SERVICE FACTOR 100.0 44.1 72.1
- 20. UNIT AVAILAt!LITY FACTDR 100.0 84.1 72.1
- 11. UNIT CAPACITY FACTOR (U51NG MDC NET) 69 1 69.1 64.1 22.' UNIT C APACITY F ACT,04,.luSING DE RJE,T ), _,_,,,,,,,,,_67.1,.
67,L.
._. H,3_
- 2...
- 23. UNIT FORCED OUTAGE RATE 0.0 09 7.2
- 24. 56 UTDOW65 SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHis RE(UELING AND MAINTENANCE OUTAGE FROM 7/14 /65 UNTIL 10/15/85.
- 25. IF 5)dTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONI:
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY
~
COMMERCI AL OPERATION
~
m
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIf PEACH BOTTOM UNIT 2 DATE JULY 15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JUNE 1985 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JULY 15.1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JUNE 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 803 17 750 2
801 18 748 3
794 19 744 4
787 20
- 432, 5
786 21 226 6
784 22 505 7
783 23 551 8
780 24 754 9
777 25 721 10 774 26 717 11 770 27 713 12 768 28 713 13 768 29 711 14 762 30 709 15 760 16 752
_~.
.. m u...
..~._-,ur__.a_,..
err-
= we
)
~
i I
r' l
l T
UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 3
UNIT NAME PEACH BOTTDM UNIT 2 DATE JULY 15,1985 J
REPCRT PCNTH JUNE, 1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY I
W.M.ALDEN ENGINEER-IN-CHARGE j
LICENSING SECTION C
GENERATIDN DIVISIDN-NUCLE AR TELEPHONE (215) 841-5D22
(........___..........___............................
1 I
I I
I PETHOD OF l LICENSEE ISY5TEMICDMPONENTI CAUSE AND CORRECTIVE I
ITYPEIDURATIDMIREASchl5 HUTTING DOWNI EVENT I CSDE I CODE I ACTIDN TD l
( N3.1 DATE I (111 (POUR $11 (2) l REACTDR (3) l REPORT C l (4) l (5) i PREVENT RECURRENCE I.
l I
I I
I I
I I
t I l'h50401 I S I 744.0 i
C I 1
NA l RC I FUELXX l SHUTDOWN FDR ITS SIXTH REFUELING, MAINTENANCE, I
I I
I I
l l
I I AND MAJOR MDDIFICATION DUTAGE.
I I
I ----- 1 I
I I
I I
(
l i
I 744.0 l
I l
l I
I
(
(
.-(3)
(4)
(1)
(2)
(, F - FDRCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULE D A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATIDN OF DATA B - MAINTENANCE OR TE ST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE
(
C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPDRT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TF AINING + LICENSE EXAMINATIDN (5)
(
F - ADMINISTR ATIVE G - OPER ATIDN AL ERROR (EXPLAIN)
EXHIBIT I - SAME SDURCE H - OTHER(EXPLAIN)
E G
l O
C)
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE JULY 15,1985 REPORT MONTH JUNE, 1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5D22 l
l I
l l METHOD OF 1 LICENSEE 15YSTEMICOMPONENTl CAUSE AND CORRECTIVE I
ITYPElDURATIONIREASONISHUTTING DOWNI EVENT l CODE I CODE l ACTION TO N3.1 DATE i (1)l (HOURS)!
(2) l REACTOR (3) 1 REPDRT C l (4) I (5) l PREVENT RECURRENCE 1
I I
I I
I 1
l I
1D l 850620 1 F l 000.0 i
B I 4
l N/A 1 MB i RECOM8 l PDWER REDUCED TO INVESTIGATE VACUUM LEAK AND l
l l
l l
l l
l l REPAIR THE 3A RECDMBINER COMPRESSOR.
I 1
1 I
I I
I I
i 11 1 850623 i F l 000.0 l
B l 4
l N/A I HC l HTEXCH l PDNER REDUCED TO REPAIR LE AKS IN THE B1 WATER l
l I
i 1
l l
l l BOX.
I I
I ----- 1 1
I I
I i
1 1
I -
1 I
I I
I I
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
Docket No. 50-277 I
Attachment to Monthly Operating Report for June, 1985 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
April 27, 1984 3.
Scheduled date for restart following refueling:
July 13, 1985 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Amendment #108 was issued March 19, 1985.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Reload 6 license amendment was issued March 19, 1985.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
'Not applicable.
t-l 7.
The number of fuel assemblies (a) in the core and (b) in the spent L
fuel storage pool l
l (a)
Core - 764 Fuel Assemblies to be returned from fuel pool l
(b)
Fuel Pool - 1462 Fuel Assemblies, 58 Fuel Rods j
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
l March, 1991 (September, 1986 with reserve full L
core discharge)
-1
Docket No. 50-278 Attachmsnt to Monthly Operating Report for June, 1985 REFUELING INFORMATION 1.
.Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
July 14, 1985 3.
Scheduled date for restart-following refueling:
October 15, 1985 4.
-Will refueling or resumption of operation thereafter. require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
. Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
5.
. Scheduled date(s) for submitting proposed licensing action and supporting information:
MAPLHGR Limits Submitted January 7, 1985 Additional' Core Limit Information - April 12, 1985 6.
Important licensing considerations. associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel
- design, new operating procedures
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b). Fuel Pool - 1212 Fuel Assemblies, 6 Fuel' Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed-storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool' storage capacity has been relicensed for 2816 fuel assemblies.
9.
LTheLprojected date of the last refueling that' can be discharged to the spent fuel pool assuming the present licensed capacity.
March, 1992 (January, 1987 with reserve for full core discharge)
Docket Noa. 50-277/50-278 I
Attachmsnt to Monthly Operating Report for June, 1985 Peach Bottom Atomic Power Station Narrative Summary of Operating Experiences June, 1985 UNIT 2 The Refueling / Pipe Replacement outage. continued throughout the month of June.
The drywell Integrated Leak Rate Test (ILRT), the Loss of Power Test, and the hydrostatic pressure tests of the reactor pressure vessel and the main steam lines have been completed.
UNIT 3 The unit. began the month at 80% power in extended core flow coastdown operation.
On June 20, load was reduced to 170 MWe to investigate a vacuum leak'and repair the 3A recombiner compressor.
The leak was determined to be caused by a ruptured tube in the main condenser B1 waterbox.
Power was increased to 700 MWe.
On June 23, the power increase was halted when reactor conductivity increased to 0.9 jamho.
Power was reduced to 400 MWe the same day. to leak check the condenser waterboxes.
The leak was repaired by plugging condenser tubes and power was increased to 800 MWE.
The unitiended the month at 74% power due to end-of-cycle coastdown.
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. DOX 8699 PHILADELPHI A. PA.19101 July 15, 1985 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of June, 1985 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly
- ours, af4 R. H. Logue Superintendent Nuclear Services Attachment cc:
Dr. T.
E. Murley, NRC Mr. T.
P. Johnson, Resident Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A.
Ross, NRC (2 copies)
Mr. Thomas Magette, Maryland Power Plant Siting INPO Records Center f
<\\t
~
--