Forwards Insp Rept 50-423/85-12 on 850318-0422 & Notice of Violation.Reply to Violation Resulting from Testing & Flushing Evolutions in ESF Bldg During Insp Requested
ML20128Q266
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/28/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20128Q269 List:
References
NUDOCS 8506040137
Download: ML20128Q266 (2)


See also: IR 05000318/2004022

Text

_

r j.

MAY 2 81985

Docket / License: 50-423/CPPR-113

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270 ,

Hartford, Connecticut 06101

'

Gentlemen:

Subject: Resident Inspection 50-423/85-12 (3/18/85 - 4/22/85)

This letter forwards NRC findings from a routine safety inspection of the Millstone

Nuclear Power. Station, Unit No. 3. These findings have been discussed by Mr.

T. Rebelowski, our NRC Senior Resident Inspector, with Mr. D. Miller and other

members of your staff.

During this inspection, testing and flushing evolutions resulted in flooding in

part of the Engineered Safety Features building. That flooding was found to in-

volve a violation of NRC requirements as cited in the enclosed Appendix A to this

letter. Please reply to_that violation in accordance with the instructions in

Appendix A. In addition,~please address in your reply the consideration that both

this' event and the October 1984 introduction of salt water into the auxiliary

feedwater system appear to have involved unforeseen activity interactions which

operational activity controls should have precluded.

Your cooperation with us in this matter is appreciated.

Sincerely,

Ori;;inal Signed By

Edward C. Wenzinger, Chief I

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report 50-423/85-12

-with Attachments A and B

B506040137 850528

PDR ADOCK 05000423

G PDR [

I

2

~ ~ - - ~ ~ - - - - ~ - - - - - - - -

c

., _

%.

-

f= 7

.

Northeast' Nuclear Energy Company- -2_ MAY. 2 81985

,

'cc w/encls:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster,' Director of Generation Construction

E. J.- Mroczka,-Vice President, Nuclear Operations

-R. T. Laudenat, Manager,' Generation Facilities Licensing-

'- ' ' D. O. Nordquist,-Manager of Quality Assurance

-W. D.:Romberg, Station Superintendent-

Public Document Room (PDR)

< Local Public Document Room'(LPDR)

' Nuclear Safety.Information Center (NSIC)

'NRC Resident Inspector

State of Connecticut

bec w/encis: . .

.

Region I Docket Room'(with concurrences)

DRP~Section Chief

DRS' Division Director'

DRSS Division Director-

Senior Operations.0fficer-(w/o encls)

G. Walton,: SRI' ,- Beaver Valley Unit 2

<

RI:DRP RI:DRP. -

_

. Cd h P

Rebelowski/meo McCabe .W n r

5///85 gpb

~n.

OFFICIAL RE ORD. COPY

-

,