Informs That Data in 850426,0503 & 09 Submittals Re IGSCC in RCS Piping Weld Indicates Applicant Compliance W/Generic Ltr 84-11.Plans for Insp or Mods to RCPB Piping Sys Requested 3 Months Before Next Outage
ML20128P858
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/24/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
GL-84-11, NUDOCS 8506030662
Download: ML20128P858 (2)


Text

n-May 24, 1985 Docket No. 50-333 DISTRIBUTION HAbelson Docket File 3 DVassallo NRC PDR DELD Local PDR EJordan Mr. J. P. Bayne ORB #2 Reading BGrimes First Executive Vice President, HThompson JPartlow Chief Operations Officer SNorris ACRS (10)

Power Authority of the State ORB #2 Gray File Pleech of New York 123 Main Street White Plains, New York 10601

Dear Mr. Bayne:

SUBJECT:

IGSCC IN STAINLESS STEEL PIPING AT JAMES A. FITZPATRICK NUCLEAR PLANT Your submittals of April 26, May 3, and May 9,1985 informed us that a total of 38 welds in the reactor coolant system piping were ultrasonically inspected during the current outage. The data showed that no significant growth has occurred during three months of plant operation in the previously identified cracks in six welds. Those welds did not require repair because the cracks are short and shallow. The inspection identifiec one cracked end-cap weld which was subsequently repaired by weld overlay.

We have reviewed the information you provided and find that the inspection and repairs performed meet the guidelines in our generic Letter 84-11.

We have also concluded that the six unrepaired welds will not compromise the integrity of the reactor coolant pressure boundary and that the FitzPatrick Plant can be safely operated for at least one additional fuel cycle.  ;

The Safety Evaluation which provides the basis for the above conclusions will be transmitted under separate cover.

Because of uncertainties about the longer term behavior of the piping, we request that your plans for inspection and/or modification of the reactor coolant pressure boundary piping systems during the next refueling outage be submitted for our review at least three months prior to start of the outage.

Original signed by/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of, Licensing

Enclosure:

Safety Evaluation

/

ORB hSNo DL s:rc h MAbelson

  1. 2:DL OR #2:DL DVassallo 05/H/85 05/ W 85 05/g/85 8506030662 850524 PDR ADOCK 05000333 P PDR

Mr. John C. Brons James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant cc:

Mr. Charles M. Pratt Mr. Jay Dunkleberger Assistant General Counsel Division of Policy Analysis Power Authority of the State i and Planning of New York >

New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident-Inspector's Office Thomas A. Nurley U. S. Nuclear Regulatory Commission Regional Administrator Post Office Box 136 Region I Office Lycoming, New York 13093 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman Mr. Harold Glovier Vice President - Quality Assurance Resident Manager Power Authority of the State James A. FitzPatrick Nuclear of New York Power Plant 10 Columbus Circle Post Office Box 41 New York, New York 10019 Lycoming, New York 13093 Mr. J. A. Gray, Jr. Mr. George Wilverding, Chairman r Director - Nuclear Licensing - BWR Safety Review Committee

! P.ower Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, New York 10601 White Plains, New York 10601

. Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 -

Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093 t

_