ML20128P770
| ML20128P770 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/24/1985 |
| From: | Chrissotimos N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20128P775 | List: |
| References | |
| NUDOCS 8507260506 | |
| Download: ML20128P770 (2) | |
See also: IR 05000310/2006024
Text
h
UNITED STATES
[gpic Ig
NUCLEAR REGULATORY COMMISSION
oq
,( " *
'
E
REGloN 111
D
"f
cLEN ELLYN. ILUNOIS 601 U
- '
'JUL 2 4 GS5
Docket No. 50-483
Union Electric Company
ATIN:
Mr. Donald F. Schnell
Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
Gentlemen:
This refers to the routine safety inspection conducted by Mr. Bruce H. Little
of this office on March 10 through June 24, 1985, of activities at Callaway
Plant, Unit 1, authorized by NRC Operating License No. NPF-30 and to the
discussion of our findings with Mr. S. E. Miltenberger and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During the inspection, certain of your activities appeared to be in violation
of regulatory requirements, as described in the enclosed appendix. The
inspection showed that the violation was given prompt high level of attention
and that action had been taken to correct the violation and prevent recurrence.
(Refer to Paragraph 5.E of attached inspection report). Consequently, no
reply to the Notice of Violation is required and we have no further questions
regarding this matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosure will be placed in the NRC's Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
7
-
hkh83
0
'N.
J. Chrissotimos, Chief
Reactor Projects Branch 2
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-483/85005(DRP)
See Attached List for Distribution
+
5 01
..
- ,
Union Electric Company
2
Tjg g 4
Distribution
cc w/ enclosures:
W. H. Weber, Manager, Nuclear
Construction
S. E. Miltenberger, Plant Manager
R. L. Powers, Assistant Manager
Quality Assurance
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
SNUPPS
- l
L