Forwards Insp Rept 50-293/85-09 on 850422-26.No Violation Noted.Weaknesses Found in Evaluation & Implementation of Vendor Recommendations Re Deficiencies in Equipment. Unresolved Item Exists Re Cable Low Temp Insulation
ML20128P404
Person / Time
Site: Pilgrim
Issue date: 07/18/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20128P411 List:
References
NUDOCS 8507260409
Download: ML20128P404 (2)


See also: IR 05000293/1985009

Text

U

&#

O  %,3, UNITED STATES

k* ,j NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

e

.....* July 18, 1985

Docket No. 50-293

Boston Edison Company, M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boyleston Street

Boston, Massachusetts 02199

Gentlemen:

SUBJECT: INSPECTION REPORT N0. 50-293/85-09

Enclosed is the report of the inspection performed at the Pilgrim Nuclear Power

Station (PNPS) by Messrs. E. Merschoff, E. Trottier, P. Milano, and R. McIntyre,

of the Vendor Program Branch on April 22-26, 1985. The purpose of this

inspection was to review licensee receipt, evaluation, and implementation of

actions determined appropriate for vendor technical information from General

Electric and other selected suppliers. The inspectors reviewed documents and

activities authorized under the provisions of NRC License DPR-35, and discussed

their findings with plant staff members identified in Section 1 of the report.

The findings demonstrate a weakness in the evaluation and implementation of

equipment manufacturers' recommendations concerning deficiencies that may affect

PNPS. Vendor correspondence from vendors other than General Electric is not

systematically addressed. There is one unresolved item concerning cables with

low temperature insulation that terminate inside solenoid valves having high

temperature valve bodies that will be referred to the NRC Region I Office for

followup action and resolution.

In-accordance with 10 CFR 2.790(a), a copy of this letter and the enclosed

Inspection Report will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, we would be pleased to

discuss them with you.

Sincerely,

j' ( .-

On4- V-

P

ary G. Zech, Chief

Vendor Program Branch

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and. Enforcement

Enclosure:

Inspection Report 50-293/85-09

r 'S PROCESSING

8507260409 850718 Original document not available tdWC

gDR ADOCK 0500

Certified dbAA4WUtdC

l

._

,. ,

Bost'on Edison Company July 18, 1985

DISTRIBUTION:

5PDR

VPB Reading

DQAVT Reading

EMerschoff

ETrottier

'JCraig

RMcIntyre.

.

O hY

VP lAVT VPB:DQAVT 8:DQAVT :DQAVT DI :yQAVT

sam RMcIntyre erschoff AGZebh KGMmes

85~ 6/$85 6/2f/85 6/W85 /}g5