IR 05000498/1985005
| ML20128N850 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/21/1985 |
| From: | Everett R, Jaudon J, Joseph Kelly, Kelly J F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20128N785 | List: |
| References | |
| 50-498-85-05, 50-498-85-5, 50-499-85-05, 50-499-85-5, NUDOCS 8506030399 | |
| Download: ML20128N850 (1) | |
Text
.
,s APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-498/85-05 Construction Permits:
CPPR-128 50-499/85-05 CPPR-129 Dockets: -50-498; 50-499 Category: A2 Licensee: Houston Lighting & Power Company (HL&P)
P. O. Box 1700-Houston, Texas 77001 Facility Name: South Texas Project, Units 1 and 2 Inspection At: South Texas Project, Matagorda County, Texas Inspection Conducted: April 8-12, 1985
. Inspector:
bo I, h_
I7hd% 6[
J.
.F.KellF,SeniorPhysplSecurity Date d
pecialist PS %7r skm R. J. Everett, Acting _ Chief, Nuclear Materials Da'te Safety and Safeguards Branch 3/2///f Approved:
% --
. P. Jaudon, Chief, Project Section A Date Reactor Project Branch 1 Inspection Summary
'
Inspection Conducted April 8-12, 1985 (Report 50-498/85-05; 50-499/85-05)
Areas Inspected:
Routine, announced inspection of preoperational security program development involving personnel fitness for duty, handling of reported quality concerns, security organization development, and the coordination of physical security systems. The inspection involved 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of direct inspection by one NRC inspector.
Results: Within the four areas inspected, no violations or deviations were identifled, c::4w.::. Oa:L:m.'3 8506030399 850530 s;.rmU/JCS Inr01/3. TION.
4yB DR ADOCK 050 UPON CI:PARATION THIS PLGS IS DECTJTROInTE3.
t.