r
.
-
,)O'
In Reply Refer To:
' Dockets:. 50-498/85-05
50-499/85-05
-
.
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President
P. O. B:x 1700
Houston, Texas 77001
Gentlemen:
- This refers to the security inspection conducted by Mr. James Kelly of this
office during the period April 8-12, 1985, of activities authorized by NRC
Construction Permits CPPR-128 and CPPR-129 for South Texas Project, and to the
discussion of our findings with Mr. J. G. Dewease and other members of your
staff at the conclusion of the inspection.
. Areas examined during the inspection included the current and proposed policies
and practices of the Houston Lighting & Power personnel ff tness for duty
program, handling of reported quality concerns, security organization
development, and coordination practices for the design and installation of
the physical security systems. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
. personnel, and observations by the inspector. These findings are documented in
the enclosed inspection report.
-The material enclosed herewith contains Safeguards Information as defined by.
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
material, with the exception.of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
Within the scope of the inspection, no violations or deviations were
identified.
<2d
RIV:PSS
NMS&
D/DRS&S
PSB/1 g
C/RPB1 /8'
J Kelly /jj
RJEve
[RLBangart
Crossman
EHJohnson
/85
-6/>o/85
3/%P/85
/tW/85
$/p/85
'
,
8506030384 850530
r20::hSURE CONTAI:G
g'
t
'
PDR .ADOCK 05000498
SAEGL*1*OS INFOR: ATION.
G
UE 5%ULLTION THIS
b
- f 'M: I3 DE00WH?CLIED.
1
I \\
L
e-
._
.-
,
1
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
grigu
.+ .
f
.
Pe!2Pd F
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosure:
Appendix - NRC Inspection Report
50-498/85-05-
50-499/85-05
cc w/ summary page only:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
-Nuclear Licensing
P. O. Box 1700
. Houston, Texas
77001
Brian Berwick, Esquire
Asst. Attorney General
Environmental Protection Div.
P. O. Box 12548, Capitol Station
Lanny' Alan Sinkin
Citizens Concerned About
Nuclear Power, Inc.
3022 Porter Street', N.W. #304
Washington, D.C.
20008
V Charles Bechhoefer, Esquire
Chairman, Atomic Safety & Licensing
-Board
U.S. Nuclear Regulatory Commission
Washington,_DC
20555
Dr. James C. Lamb, III
313 Woodhaven Road
Chapel Hill, North Carolina
27514
Judge Ernest E. Hill
Hill Associates
210.Montego Drive
.Danville, California
94526
EXC*uDSVtB CONTAINS
Texas Dept. of Health Resources
SAFMWES INTOCATION.
UNN SEP.U?ATION SHIS
PAC 3 IS DE0Z!TdOLLED.
'
.
.
,
Houston Lighting & Power Company
-3-
t
bcc: Copy of entire report maintained in RIV Security File and sent to:
t
G. McCorkle, NMSS
SSPB/NRC:NRR
IE File
-Resident Inspector (2) (w/766)
R. Martin
- bcc:
RIV - Letter and Inspection Summary only w/766:
.
1
RPB1
Lic Fee File
Section Chief (RPB1/A) -
.NMS&SB
-MIS SYSTEM-
RIV File
'
G.' Brown
RSTS Operator
-bec:' RIV - Letter and Inspection Summary only w/out 756:
DMB - IE04
R. Bangart
R. Denise, DRS&P
..
I'
N
, , .