ML20128N832
| ML20128N832 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/08/1996 |
| From: | Fields M NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20128N840 | List: |
| References | |
| NUDOCS 9610170049 | |
| Download: ML20128N832 (20) | |
Text
_
- 'ourau
/
UNITED STATES g
,j NUCLEAR REGULATORY COMMISSION
'4 WASHINGTON, D.C. 2066H001
...../
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIN. CALIFORNIA QQG ET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 132 License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated July 19, 1995, as supplemented by letters dated December 22, 1995, and Narch 26, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9610170049 961008 PDR ADOCK 05000361 P
l,
2.
Accordingly, the license is amended by changes to the Technical Speci-I fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:
l (2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.132, are hereby incorporated in the license.
Southern California Edison Company shall operate the l
facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of issuance to be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMISSION
,p.b' Mcl B. Fields, Project Manager j
l Project Directorate IV-2 l
Division of Reactor Projects III/IV j
l Office of Nuclear Reactor Regulation i
l
Attachment:
Changes to the Technical l
Specifications l
l Date of Issuance:
October 8, 1996 i
l l
l l
4 4
ATTACHMENT TO LICENSE AMENDMENT l
AMENDMENT NO.132 TO FACILITY OPERATING LICENSE NO. NPF-10 DOCKET NO. 50-361 l
Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
REM 0YE INSERT l
3.3-35 3.3-35 l
3.3-36 3.3-36 l
3.3-37 3.3-37 l
3.3-38 3.3-38 3.3-39 3.3-39 3.3-40 3.3-40 l
3.3-41 3.3-41 l
1 i
l l
l O
h l
~. - _.
CPIS 3.3.8
-1 3.3 INSTRUMENTATION 3.3.8 Containment Purge Isolation Signal (CPIS)
LCO 3.3.8 One CPIS channel shall be OPERABLE.
i 1
APPLICABILITY:
MODES 1, 2, 3, and 4, During CORE ALTERATIONS, J
During movement of irradiated fuel assemblies within containment.
NOTE----------------------------
Only required when the penetration is not isolated by appropriate closed and de-activated automatic valve (s),
closed manual valve (s), or blind flange (s).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
CPIS Actuation Logic, A.1 Enter applicable Immediately or one or more Conditions and i
required channels of Required Actions for containment airborne affected valves of l
radiation monitors LCO 3.6.3, inoperable in MODES 1,
" Containment 2, 3, and 4.
Isolation Valves,"
made inoperable by CPIS instrumentation.
B.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met in 8tgl MODES 1, 2, 3, or 4.
B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
SAN ONOFRE--UNIT 2 3.3-35 Amendment No. 447,132
CPIS 3.3.8 d
4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more required C.1 Enter applicable Inunediately 1
channels of conditions and containment airborne required actions of I
radiation monitors LC0 3.4.15, "RCS Leak inoperable in MODES 1, Detection."
2, 3, and 4.
NOTE =
D.
CPIS Manual Trip, The provisions of LCO 3.0.3 Actuation Logic, or are not applicable.
i one or more required channels of D.1 Place and maintain Immediately containment airborne containment purge l
radiation monitors supply and exhaust inoperable during CORE valves in closed ALTERATIONS or position.
movement of irradiated 4
fuel assemblies within QB containment.
D.2.1 Suspend CORE Immediately ALTERATIONS.
AND D.2.2 Suspend movement of Immediately irradiated feel assemblies is 4
containment.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1 Perform a CHANNEL CHECK on required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment airborne radiation monitor l
channel.
(continued) 4 SAN ONOFRE--UNIT 2 3.3-36 Amendment No. 4 N,132
I..-
CPIS 3.3.8 j
SiRVEILLANCE REQUIREMENTS (continued) f SURVEILLANCE FREQUENCY I
SR 3.3.8.2 Perform a CHANNEL FUNCTIONAL TEST on each 92 days required containment airborne radiation monitor channel. Verify trip setpoint is in accordance with the following:
Containment Airborne Radiation Monitor:
set sufficiently high to prevent spurious alarms / trips yet sufficiently low to assure an alarm / trip should an inadvertent release occur.
2 i
NOTE--------------------
l Surveillance of Actuation Logic shall include the actuation of each initiation relay and verification of the proper j
operation of each initiation relay.
j B
Perform a CHANNEL FUNCTIONAL TEST on 24 months required CPIS Actuatior. Logic channel.
i
~
SR 3.3 8.4 Perform a CHANNEL CALIBRATION on required 24 months containment airborne radiation monitor
- channel, i
1 8
SR 3.3.8.5 Verify that response time of required CPIS channel is within limits.
24 months 1
SR 3.3.8.6 Perform CHANNEL FUNCTIONAL TEST on required 24 months l
l CPIS Manual Trip channel.
3 i
SAN ON0FRE--UNIT 2 3.3-37 Amendment No. 137,132
1
\\
l I
1 1
i I
l THIS PAGE INTENTIONALLY BLANK
\\
i 1
l l
SAN ONOFRE--UNIT 2 3.3-38 Amendment No. 4 W,132
CRIS 3.3.9 3.3 INSTRUMENTATION 3.3.9 Control Room Isolation Signal (CRIS)
LCO 3.3.9 One CRIS channel shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies.
ACTIONS
NOTES----------------------------
1.
The provisions of LCO 3.0.3 are not applicable.
2.
The provisions of LCO 3.0.4 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
CRIS Manual Trip, A.1
NOTE---------
Actuation Logic, or Place Control Room one required channel Emergency Air Cleanup of control room System (CREACUS) in airborne radiation isolation mode if monitors inoperable in automatic transfer to MODES 1, 2, 3, or 4.
isolation mode Place one CREACUS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> train in emergency mode.
(continued)
SAN ONOFRE--UNIT 2 3.3-39 Amendment No. 4W,132
-7
. - _ =
CRIS 3.3.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
CRIS Manual Trip, B.1
NOTE-------
Actuation Logic, or Place CREACUS in i
required control room isolation mode if I
airborne radiation automatic transfer to l
monitors inoperable in isolation mode l
MODE 5 or 6, or during inoperable.
i movement of irradiated fuel assemblies.
Place one CREACUS Immediately train in emergency l
mode.
DE B.2.1 Suspend movement of Immediately irradiated fuel assemblies.
AtiD B.2.2 Suspend positive Immediately reactivity additions.
4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.9.1 Perform a CHANNEL CHECK on the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> control room airborne radiation monitor l
channel.
(continued) l SAN ON0FRE--UNIT 2 3.3-40 Amendment No. 4W,132 l
~ - -
CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor I
channel.
1
\\
l Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.
NOTE-------------------
Surveillance of Actuation Logic shall include the verification of the proper operation of each initiation relay.
j Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Actuation Logic channel.
I SR 3.3.9.4 Perform a CHANNEL CALIBRATION on required 18 months CRIS airborne radiation monitor channel.
l SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.
l l
SAN ON0FRE--UNIT 2 3.3-41 Amendment No. 127,132
. f * *%.,,
i 4
4 UNITED STATES g
s D
"j NUCLEAR REGULATORY COMMISSION h
\\ w ll*
WASHINGTON, D.C. 2066 Hoot
....+
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY i
I THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA QQCKET NO. 50-362
\\
SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 121 License No. NPF-15 1.
The Nuclear Regulatory Commission (the Commission) has found that:
I A.
The application for amendment by Southern California Edison i
Company, et al. (SCE or the licensee) dated July 19, 1995, as supplemented by letters dated December 22, 1995, and March 26, 1
1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; 4
B.
The facility will operate in conformity with the application, the
{
provisions of the Act, and the rules and regulations of the i
Commission; i
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health 1
and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; ll and E.
TheissuanceofthisamendmentisinaccordancewithIdCFR Part 51 of the Commission's regulations and all applicable requirements have been sati;fied.
I I
d
l
=
l
.c
'. 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:
(2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 121, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of issuance to be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 8, 1996
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 121 TO FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.3-35 3.3-35 3.3-36 3.3-36 3.3-37 3.3-37 3.3-38 3.3-38 3.3-39 3.3-39 3.3-40 3.3-40 3.3-41 3.3-41 1
4 1
CPIS 3.3.8 3.3 INSTRUMENTATION 3.3.8 Containment Purge Isolation Signal (CPIS)
LCO 3.3.8 One CPIS channel shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4, During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.
NOTE----------------------------
Only required when the penetration is not isolated by appropriate closed and de-activated automatic valve (s),
closed manual valve (s), or blind flange (s).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
CPIS Actuation Logic, A.1 Enter applicable Immediately or one or more Conditions and required channels of Required Actions for containment airborne affected valves of l
radiation monitors LCO 3.6.3, inoperable in MODES 1,
" Containment 2, 3, and 4.
Isolation Valves,"
made inoperable by CPIS instrumentation.
B.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met in 8HQ MODES 1, 2, 3, or 4.
B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued) i I
SAN ON0FRE--UNIT 3 3.3-35 Amendment No. 116, 121 l
l l
l
CPIS 3.3.8 l
ACTIONS (continued) 1 CONDITION REQUIRED ACTION COMPLETION TIME i
C.
One or more required C.1 Enter applicable Immediately channels of conditions and containment airborne required actions of I
radiation monitors LCO 3.4.15, "RCS Leak inoperable in MODES 1, Detection."
2, 3, and 4.
NOTE------------
O.
CPIS Manual Trip, The provisions of LCO 3.0.3 Actuation Logic, or are not applicable.
one or more required channels of D.1 Place and maintain Immediately j
containment airborne containment purge l
l radiation monitors supply and exhaust 1
inoperable during CORE valves in closed i
ALTERATIONS or position.
movement of irradiated i
fuel assemblies within QB containment.
D.2.1 Suspend CORE Immediately ALTERATIONS.
88Q D.2.2 Suspend movement of Immediately irradiated fuel d
assemblies in containment.
a SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4
SR 3.3.8.1 Perform a CHANNEL CHECK on required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment airborne radiation monitor l
channel.
j (continued)
SAN ONOFRE--UNIT 3 3.3-36 Amendment No. 116,121
CPIS 3.3.8 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY t
SR 3.3.8.2 Perform a CHANNEL FUNCTIONAL TEST on each 92 days required containment airborne radiation i
monitor channel. Verify trip setpoint is 8
in accordance with the following, i
Containment Airborne Radiation Monitor:
set sufficiently high to prevent spurious alarms / trips yet sufficiently low to assure an alare/ trip should an inadvertent release occur.
NOTE--------------------
I Surveillance of Actuation Logic shall include the actuation of each initiation relay and verification of the proper operation of each initiation relay.
Perform a CHANNEL FUNCTIONAL TEST on 24 months required CPIS Actuation Logic channel.
SR 3.3.8.4 Perform a CHANNEL CALIBRATION on required 24 months containment airborne radiation monitor l
channel.
SR 3.3.8.5 Verify that response time of required CPIS 24 months I
channel is within limits.
SR 3.3.8.6 Perform CHANNEL FUNCTIONAL TEST on required 24 months l
CPIS Manual Trip channel.
SAN ON0FRE--UNIT 3 3.3-37 Amendment No. 4M,121
l THIS PAGE INTENTIONALLY BLANK l
SAN ONCFR--UNIT 3 3.3-38 Amendment No. 44,121 l
l
N.Ar-4,4(
__hJ_4_
- AA--
e 2
4m'+4-E6---A-6m*+.-+-i.*
4--_
4J s
w Ju As-4 J
CRIS 3.3.9 3.3 INSTRUNENTATION 3.3.9 Control Room Isolation Signal (CRIS)
LCO 3.3.9 One CRIS channel shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, l
During movement of irradiated fuel assemblies.
l l
ACTIONS l
NOTES----------------------------
l 1.
The provisions of LCO 3.0.3 are not applicable.
2.
The provisions of LC0 3.0.4 are not applicable.
l CONDITION REQUIRED ACTION COMPLETION TIME i
A.
CRIS Manual Trip, A.1 NOTE---------
Actuation Logic, or Place Control Room -
one required channel Emergency Air Cleanup of control room System (CREACUS) in airborn radiation isolation mode if monitors inoperable in automatic transfer to MODES 1, 2, 3, or 4.
isolation mode inoperable.
Place one CREACllS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> train in ese icy mode.
(continued) 1 SAN ON0FRE--UNIT 3 3.3-39 Amendment No. 446,121 I
CRIS 3.3.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
CRIS Manual Trip, B.1
NOTE---------
Actuation Logic, or Place CREACUS in required control room isolation mode if airborne radiation automatic transfer to monitors inoperable in isolation mode MODE 5 or 6, or during inoperable.
movement of irradiated fuel assemblies.
Place one CREACUS Immediately train in emergency mode.
QB B.2.1 Suspend movement of Immediately irradiated fuel assemblies.
8110 B.2.2 Suspend positive Immediately reactivity additions.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.9.1 Perform a CHANNEL CHECK on the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> control room airborne radiation monitor
- channel, j
(continued)
SAN ON0FRE--UNIT 3 3.3-40 Amendment No. 144,121
CRIS 3.3.9 l
i SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor I
channel.
Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.
NOTE-------------------
l Surveillance of Actuation Logic shall 1
include the verification of the proper operation of each initiation relay.
i Perform a CHANNEL FUNCTIONAL TEST on 18 months l
required CRIS Actuation Logic channel.
{
l l
SR 3.3.9.4 Perform a CHANNEL CALIBRATION on required 18 months l
CRIS airborne radiation monitor channel.
l l
l SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.
l t
i r
i SAN ONOFRE--UNIT 3 3.3-41 Amendment No. 146, 121 L-
---