ML20128N793

From kanterella
Jump to navigation Jump to search
Forwards NRC Containment Loads Working Group Draft Summary Repts.List Indicating Which Repts Available Encl.Due to Proximity of APS Meeting,Only Summary Repts Sent.W/O Encl
ML20128N793
Person / Time
Issue date: 07/13/1984
From: Ryder C
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Findyalson F
AEROSPACE CORP.
Shared Package
ML20127A894 List: ... further results
References
FOIA-85-110 NUDOCS 8507130155
Download: ML20128N793 (2)


Text

1 i

},

A t

f Dr. F. Findlayson Aerospace Corporation P.O.'Ecx S2957 i

Las Angeles CA 90009

Dear Dr. Findlayson:

Enclosed are samsary reports from the NRC Containment Loads niorking Grcup (CLWG).

e The CLWG will eventually have a set of reports. At this time, some of the reports have not been writtaa. I have indicated which reports are available by the attached list (part of a larger list).

Lecause the APS meeting will be held soon, I have sent only the summary re-forts. If you would like the other reports, please call se at (301) 427-4327.

Sincerely, Christopher P. Ryder Accident Source Term Progree Office Office of Nuclear Regulatory Research

Enclosures:

As stated

~ Distribution:

RES Central File CHRON/ CIRC ASTP0 Subject File CPRyder 4

8507130155 850415 PDR FOIA ALVAREZ85-110 PDR l

ASTF0/RCS l

CPRyder:mir 07/ g/84

/79

s#

T.,

o Item Report Status (9)

Containment Loads Working Group Draft Reports s

(a) Standard Problem 1:

PWR Large Dry 1.

Summary Enclosed 2.

Report from Corrodini 3.

Report from Battelle Not yet received 4.

Report from Sandia 5.

Report from Brookhaven Not yet received (b) Standard Problem 2: PWR Subatmospheric 1.

Summary Enclosed 2.

Report from Corrodini 3.

Report from Battelle 4.

Report from Sandia 5.

Report from Brookhaven P

(c) Standard Problem 3:

PWR Ice Condenser 1.

Summary Enclosed 2.

Report from Battelle Not yet received 3.

Report from Sandia Not yet received (d) Standard Problem 4: BWR Mark-I 1.

Summary Not yet received 2.

Report from Battelle Not yet received 3.

Report from Sandia Enclosed 4.

Report from Brookhaven Not yet received (e) Standard Problem 5:

BWR Mark-II 1.

Summary-tiot yet received 2.

Report from Battelle Not yet received 3.

Report from Sandia Enclosed 4.

Report from Brookhaven Not yet received (f) Standard Problem 6:

BWR Mark-III 1.

Summary Enclosed 2.

Report from Sandia 3.

Report from Los Alamos 4.

Report from Factory Mutual (g) Special Froblems 1.

Dire ~ct heating Enclosed 2.

Steam explosion in PWR wet cavity 3.

Steam explosion in Mark-II Not yet received 4.

Corium concrete interaction on Mark-I Not yet received floor and suppression pool vent

-