From: Patulski S, Vander Velde B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-96-0214, PBL-96-214, NUDOCS 9610160338
Download: ML20128N277 (9)


Text

.-.

i.

l Wisconsin 1 Electnc POWER COMPANY Point Beoch Nuclear Plong (414) 755-2321 6610 Nuclear Rd., Two Rivers. W154241 PBL 96 0214 October 3,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 I

Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of September 1996.

Sincerely,

.I. ak S. A. Patulski General Manager Nuclear Operations smb Attachments cc:

L. L. Smith, PSCW j

NRC Regional Administrator, Region III NRC Resident Inspector 9610160338 960930'-

PDR ADOCK 05000266 R

pyg agon rew/,

.4 suutwrofHisawsia Ewar avpvath>a

OPERATING DATA REPORT DOCKET NO. 50-266 7

DATE: 10/03/96 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NO ES
2. REPORTING PERIOD: September - 1996
3. LICENSED THERVAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRUUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720.0 6,575.0 227,063.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,010.5 190,664.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 720.0 5,964.6 187,446.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,091,733.0 8,979,388.0 266,195,537.0
17. GROSS ELECTRICAL ENERGY GENERATED 367,740.0 3,056,580.0 89,962,950.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 351,619.0 2,922,942.5 85,776,027.0
19. UNIT SERVICE FACTOR 100.0 %

90.7 %

82.6 %

20. UNIT AVAILABILITY FACTOR 100.0 %

90.7 %

82.9 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 %

91.7 %

77.6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 %

89.4 %

76.0%

23. UNIT FORCED OUTAGE RATE O.0%

0.0%

1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-266 l

j AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 '

MONTH SEPTEMBER -

1996 DATE 10/2/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 i

AVERAGE AVERAGE AVERAGE t

DAK.Y DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL l

DAY MWe NET DAY MWe NET DAY MWe NET 1

487 11 485 21 491 l

2 489 12 485 22 491 3

489 13 483 23 491 4

490 14 489 24 491 l

5 490 15 489 25 491 1

6 488 16 489 26 493 t

t 7

480 17 490 27 495 I

r 8

480 18 490 28 497 9

464 19 489 29 498 i

10 481 20 489 30 497 I

l I

i 5

i I

POINT BEACH NUCLEAR PLANT Docket No.

50-266 Unit Name Point Beach. Unit I UNIT SHUTDOWNS AND POWER REDUCTIONS Date 10/2/96 Completed By B. L Vander Velde REPORT MONTH SEPTEMBER - 1996 Telephone No.

414n55-6681 Method of IJcensee Evers Duration Reactor Report No.

System Component Cause and corrective Action No.

Does Type' (Hours)

Reason' Shut Down' Code' Code' To Preven Recurrence NA NA NA NA NA NA NA NA NA NA l

l l

'F: Fosted -

  • Reason:

' Method:

Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5xhibit I-Same Source G - Operational Error (explain)

H - Other (explain)

PBF4028b (03M

_________u

DOCKET NO.

50-266 UNITNAME Point Beach Unit 1 DATE 10/3/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 1 operated at an average of 488 MWe net for the September,1996 report period.

The following three Licensee Event Reports were submitted to the NRC in September,1996:

l Licensee Event Report 266/96-006, Emergency Power Out of Service Coincidental with Opposite Train Service Water Pump Out of Service

(

Licensee Event Report 266/96-007, Redundant Safety-Related Circuits In the Same Control Board Wireway l

Licensee Event Report 266/96-008, Missed Full Pressure Test of Containment Air Lock Safety-related maintenance included:

1. G-04 emergency diesel generator air motor air line replaced and lube oil recire pump installed and j

aligned.

2. D-08 station battery charger capacitors replaced.
3. G-03 emergency diesel generator cooldown timer calibrated.
4. P-32C service water pump packing replaced.

l l

l I

i l

i I

t OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 10/03/96

't COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: September - 1996
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8 t
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MV.*E): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%

I

10. REASONS FOR RESTRICTIONS, (IF ANY):

Self-imposed restriction because of SG tube plugging, pending further evaluation.

THIS MONTH YEAR TO DATE CUMULATIVE l

11. HOURS IN REPORTING PERIOD 720.0 6,575.0 211.848.0

[

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,559.5 185,886.6 l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 720.0 6,555.9 183,410.3

[

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2 i
16. GROSS THERMAL ENERGY GENERATED (MWH) 983,988.0 8,942,323.0 263,474,476.0

[

17. GROSS ELECTRICAL ENERGY GENERATED 330,730.0 3,055,440.0 89,558,700.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 314,498.0 2,910,095.5 85,374,745.0 l
19. UNIT SERVICE FACTOR 100.0 %

99.7 %

86.6 %

i

20. UNIT AVAILABILITY FACTOR 100.0 %

99.7 %

86.7 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 90.1 %

91.3 %

82.5 %

i i

22. UNIT CAPACITY FACTOR (USING DER NET) 87.9 %

89.1 %

81.1 %

23. UNIT FORCED OUTAGE RATE 0.0%

0.3%

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling /SGRP, 10/05/96,71 days I

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA i

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

[

POINT BEACH NULIEAR PLANT DOCKET NO.

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2_

~

MONTH SEPTEMBER -

1996 DATE 10/2/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681

~

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

435 11 432 21 439 2

436 12 429 22 439 3

437 13 435 23 439 4

438 14 436 24 439 5

438 15 436 25 439 l

6 436 16 436 26 441 7

428 17 438 27 442 8

428 18 438 28 444 9

429 19 437 29 449 10 428 20 436 30 446 i

POLNT BEACH NUCLEAR PLANT Docket No.

50-301 Unit Name Point Beach. Unit 2 UNIT SHUrDOWNS AND POWER REDUCTIONS Date 10/2/96 Completed By B. J. Vander Velde REPORT MONTH SEPTEMBER - 1996 T W No. _ 414n55-6681 Method of Licensee Event Deretion Reactor Repost No.

Symem Component Cause and Corrective Action No.

Dese Type' (Hours)

Reason Shut Down' Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA i

'F: Forced

' Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Ioad F - Administrative 6 - Other (explain)

Mbit I-Same Source G - Operational Error (explain)

H - Other (explain)

PBF#28b (03-90)

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE 10/2/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 2 operated at en average of 437 MWe net for the September,1996 report period.

Safety-related maintenance included:

1. C-2 personnel access air lock door cleaned.
2. WL-01721 reactor coolant drain tank pump suction control fitting tightened.

i q

l

._