ML20128M535

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1985
ML20128M535
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 06/30/1985
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8507260006
Download: ML20128M535 (10)


Text

. - - - _ _ - - - _

, t .- ',

OPERATING DATA REPORT DOCKET NO. 50-413-DATE 07/15/85 COMPLETED BY J. A. Reavis TELEPHONE 704/373-7567 OPERATING STATdS ,

Notes

  • Nameplate Rating .
2. Re o ting eriod: June 29, 1985-June 30, 1985 1 00 Ax p er
3. Licensed Thermal Power (MWt): 3411 factor per Page 111,
4. Nameplate Rating (Gross MWe): 1205 NUREG-0020.
5. Design Electrical Rating (Net MWe): 1145
6. Maximum Dependable Capacity (Gross MWe): -
7. Maximum Dependable Capacity (Net MWe): 1145
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

. 9. Power Level To Which Restricted,If Any (Net MWe): None

10. Reasons For Restrictions,if Any:

This Month Yr.-to Date Cumulative

11. Hours In Reporting Period 48.0 48.0 48.0
12. Number Of Hours Reactor Was Critical 48.0 48.0 48.0
13. Reactor Reserve Shutdown llours
14. Hours Generator On Line 48.0 48.0 48.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 162 449 162 449 162 449
17. Gross Electrical Energy Generated (MWH) 56 284 56 284 56 284
18. Net Electrical Energy Generated (MWH) 53 221 53 221 53 221
19. Unit Service Factor 100.0 100.0 100.0
20. Unit Availability Factor 100.0 100.0 100.0
21. Unit Capacity Factor (Using MDC Net) 96.8 96.8 96.8
22. ' Unit Capacity Factor (Using DER Net) 96.8 96.8 96.8
23. Unit Forced Outage Rate 0.0 0.0 0.0 l 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): ,

)'

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8507260006 850630 I& i PDR ADOCK 05000413 I R PDR (9/77) 4

, , - . - - . , - , - - , . , , _ . .,,.-.,,,_..,,,------,..,-,-.w.--- - , - - - . _ , - , . , - - , . . . . , - - - _ . , . - - - , . , . , _ . . _ . , , _ . . - , , . , ~ _ - - . . , . , - - , . - - .-

c

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-413 UNIT catawba 1 07/15/85

.DATE COMPi.ETED'BY J. A. Reavis TELEPHONE 704/373-7567 MONTH June, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 - - -

17 - ---

2 - ---

18 - ---

3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 - ---

11 27 12 28

.13 29 1 109 14 - ---

30 1 109 15 31 16 - ---

lNSTRUCTIONS

-On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME Catawba 1 ,

DATE 7/15/85 REPORT MONTH June 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

O e oe,"g License y Cause & Corrective 32 "e ,a 3 &

  • y No. Date ~. %y g ,g g c Be Event y, p, Action to ,

g$ EE o- E a:

%5$

zmo Report # RE 8B mu vu Prevent Recurrence,.

There were no power reductions or unit shutdowns on this unit following commercial operation on June 29.

I 1 2 3 4 Reason: Method:

A-Equipment Failure (Explain) Exhibit G - Instmetions bS led 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training 4 License Examination File (NUREG-0161)

F-Adninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source n i, ,,

H-Other (Explain)

DOCKET NO: ^50-413 UNIT: Catawba 1 DATE: 7/1b/85 NARRATIVE

SUMMARY

t Month: June 1985 Catawba unit 1 began commercial operation on June 29 and operated at 1007, throughout the remainder.of the month.

.. T **. e

[ .

MONTHLY REFUELING INFORMATION REQUEST i

i-l 1.- Facility name: Catawba Unit 1 . l*

l.

,. 2. Scheduled nemt refueling shutdown: August 1986 .

+

l' October 1986

3. Scheduled restart rollowing refueling:

l .

.4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

- i

7. Number of fuel assemblies (a) in the core: 193 .

(b) in the spent fuel pool: .

8. Present licensed fuel pool capacity: 1418 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 ,

DUKE POWER COMPANY Date: July 15, 1985 ,

l. Name of

Contact:

J. A. Reavis Phone: 704-373-7567 l

i ,

, - - , - - -- ., , - , , , , - ---w-- ps,,,.-a, -m---,~,--,,-~ ----.e, e--, ,.,,,---gr,-,e,,

.,-n,. ee- - m es,ww,,-r r w , w n

CATAWBA NUCLEAR STATION Monthly Operating Status Report

1. Personnel Exposure For the month of May, no individuals exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

. ,. . - . . ._ - _- - = . . - . - - -.. .. . _ , . _ .-, .- --.. _-.. -. --._-

L CATAWBA NUCLEAR STATION

(,

Pressurizer Power Operated Relief Valve (PORV)

and Safety Valve Challenges 1.

I i-UNIT DATE VALVE # (*) # OF CHALLENGES 1 June 9, 1985 NC-34A (PO'tV) 1

(

=

4 I

d h

s s

t

~

  • S - SAFETY VALVE l i
P - PORY 4 J.

e s

I e

I 5

1  !

I-

-- ,_., - . , , . - . . . , , , --.n.,- -

, . . , . , , , , , _ , , , , , n..,-.,,n_ n, ..n,- , - . , , _ - - - . , , , , ,,.-,.-,,n,_,__,,-, -.

'.) -

CATAWBA NUCLEAR STATION Pressurizer Power Operated Relief Valve (PORV) and Safety Valve Challenges UNIT DATE VALVE # (*) # OF CHALLENGES 1 06-13-85 1NC-32 (P) 1 l 1 06-13-85 INC-36 (P) 1 j 1 06-13-85 ISV-7 (S/G "C") (P) 1

! 1 06-22-85 ISV-7 (S/G "C") (P) 1 1 06-22-85 ISV-1 (S/G "D") (P) 1 1 06-22-85 ISV-14 (S/G "B") (*S) 1 I

f a

  • S - SAFETY VALVE P - PORV l

l i

Duxe POWER GOMPANY P.O. DOX 3318D CIIAHLOTTE, N.C. 28242 HALB. TUCKER TELEPHONE m.... July 15, 1985 po4) ara-4sa

..u u,...omseno.

Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: Catawba Nuclear Station Docket No. 50-413

Dear Sir:

Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of June, 1985.

Very truly yours, Hal B. Tucker

/

JAR:scs Attachment i

cc: Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law MNBB-5715 P. O. Box 2097 Washington, D. C. 20555 Charleston, S. C. 29412 INPO Records Center Palmetto Alliance l Suite 1500 213515 Devine Street 1100 circle 75 Parkway Columbia, S. C. 29205 Atlanta, Georgia 30339

+

Director Office of Inspection and Enforcement July 15, 1985- i Page Two cc: ,Ms. Judy Dovers Mr. K. Jabbour W . Nuclear Assurance Corporation Office of Nuclear Reactor Regulation

.5720 Peachtree Parkway .U. S. Nuclear Regulatory Commission

'..Norcross, Georgia. 30092 Washington, D. C. 20555

[.

.NRC Resident Inspector Catawba Nuclear Station.

et r:

u l-t

)

?)-

I i

i 1

l V

l l

q r r.  ; .

... . . . s

.