Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT NO. 50-325/85-15 AND 50-324/85-15
On May 13-17, 1985, NRC inspected activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for your Brunswick facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff identi-
fied in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
i
David M. Verrelli,,, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-325/85-15
and 50-324/85-15
cc w/ encl:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bec w/ enc 1:
(See page 2)
0507250102 050612
Z6 O[ j
ADOCK 05000324
Q
PDH
j:;
'
-
- .