ML20128L758

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-324/85-15 & 50-325/85-15 on 850513-17.No Violations or Deviations Noted
ML20128L758
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/12/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20128L762 List:
References
NUDOCS 8507250102
Download: ML20128L758 (1)


See also: IR 05000324/1985015

Text

[0

i

..

,

,a

EN 121985

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-325/85-15 AND 50-324/85-15

On May 13-17, 1985, NRC inspected activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for your Brunswick facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely,

i

David M. Verrelli,,, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-325/85-15

and 50-324/85-15

cc w/ encl:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

bec w/ enc 1:

(See page 2)

0507250102 050612

Z6 O[ j

PDR

ADOCK 05000324

Q

PDH

j:;

'

-

- .