c
pna
.
,
..
.
June 18,1985
Florida Power Corporation
ATTN: Mr. W. S. Wilgus
Vice President Nuclear Operations
P. O. Box 14042, M.A.C. H-2
St. Petersburg, FL 33733
Gentlemen:
SUBJECT:
REPORT NO. 50-302/85-22
On April 29 - May 1,1985, NRC inspected activities authorized by NRC Operating
License No. DPR-72 for your Crystal River facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to an unresolved item identified in the inspection
report. These matters will be pursued during future inspections.
Our Confirmation of Action letter dated January 29, 1985, to Florida Power
Corporation (FPC) documented FPC's commitment to recertify the operator and
senior operator candidates who were examined by the NRC in December 1984 and
successfully passed their examination. By letter of April 4,1985, FPC stated to
the NRC that the recertification was complete and that the resulting documenta-
tion was available for review.
This inspection report contains the results of
our review of the recertification documentation. As a result of our inspection,
we found your recertification process to be inadequate in that the training
'
records do not indicate that the candidates successfully completed all of the
required training.
We are concerned that your management control system
permitted these occurrences.
Consequently, we request that you reply to this
letter to explain how this occurred and describe in particular those actions
taken or planned to prevent recurrence.
i
1.
I
i
l
8507110401 850618
ADOCK 05000302
'
G
ff0I
'
i
,
-
.
.
E'
- e
J
Florida Power Corporation
2
June 18,1985
1
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by DMVerrelli for)
Roger D. Walker, Director
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-302/85-22
cc w/ enc 1:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
-
G. R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bec w/ encl:
Document Control Desk
State of Florida
NRC Resident Inspector
/
b
- SEE PREVIOUS CONCUR NCE
A
-
3
M!
RI
RII
RII
RII
RII
'
- SDStadler:es *CJulian * AFGibson
PBem s
VLB
niee
en
s
6/ /85
6/ /85
6/ /85
6/p)/85
6/q/85
6/// 5
.
.
.
.
..
.
.
&
Florida Power Corporation
2
Enclosure:
Inspection Report No. 50-302/85-22
cc w/ encl:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
G. R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bec w/ encl:
Document Control Desk
State of Florida
NRC Resident Inspector
RII
A f
RII
RII
RII
sastadler:escy4AFi
n
PBemis
VLBrownlee
5$1/85
y ygs5 5/ ,/85
5/ /85
5/ /85
>