Provides Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode
ML20128L267
Person / Time
Site: Grand Gulf 
Issue date: 10/07/1996
From: Meisner M
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-96-00080, GNRO-96-80, IEB-95-002, IEB-95-2, NUDOCS 9610110369
Download: ML20128L267 (6)


Text

___.. _ _. =..

Entsrgy Opsrations,inc.

ENTERGY eo

Ry G m on M337150

% 601237 M70 M. J. Meisner October 7, 1996 1,.

be<

v e, s yuu:,em U.S. Nuclear Regulatory Commission j

Mail Station Pl-37 Washington, D.C.

20555 4

Attention:

Document Control Desk Subjects Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 4

Additional Response to NRC Bulletin 95-02

Reference:

Response to NRC Bulletin 95-02, Dated November 17, 1995, GNRO-95/00124 GNRO-96/00080 Gentlemen:

NRC Bulletin 95-02, " Unexpected Clogging of a Residual Heat Removal (RHR)

Pump Strainer While Operating in Suppression Pool Cooling Mode" was issued for licensee response while Grand Gulf Nuclear Station (GGNS) was in the process of developing a new Foreign Material Exclusion (FME) procedure.

Also, GGNS identified a light amount of debris on the RHR A and B suppression pool strainers while performing the inspections requested of the Bulletin. Therefore, the referenced GGNS response to two Requested Actions of this Bulletin regarding FME revealed that " Grand Gulf is j

currently in the process of re-evaluating its present Foreign Material 1

Exclusion program, and will provide a written response with details of any y

program deficiencies and proposed enhancements." Attachment 1 of this submittal provides the follow-up response.

Recently, GGNS experienced a plant transient similar in nature to the i

5 event described in NRC Bulletin 95-02, with both trains of RHR operated concurrently in the suppression pool cooling mode following pool agitation due to SRV lifts. Subsequent inspection of the ECCS suppression pool strainers indicated that the strainers were as clean as previous inspections, and had experienced no fouling as a result of this event.

This information is being submitted under oath and affirmation in accordance with 10CFR50.54 (f).

Please contact Rick Ingram at (601 437-2238 should you have any questions or require additional inf rmation regarding this matter.

rs ly, H/S 4/mte t

ents:

1.

Additional Response to NRC Bulletin 95-02 2.

Affirmation g

g cc (See Next Page) 9610110369 961007 PDR ADOCK 05000416 G

PDR

.. = -..

4 October 7, 1996 GKRO-96/00080 Page 2 of 3 cca Mr. J. E. Tedrow (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. J. W. Yelverton (w/o) j Mr. L. J. Callan (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Managet (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 j

1

)

=

1 l

l l

1 Additional Response to NRC Bulletin 95-02

i Attachmant 1 to GNRO 96/00080 Page 2 of 3

)

NRC Bulletin 95-02 contains five Requested Actions. The initial GGNS submittal provided a complete response to Requested Actions 2), 3) and

5). The GGNS response to Requested Action 1) was complete, with the exception of "...an assessment of the potential for the introduction of debris or other materials that could clog the strainers since the pool was last cleaned." This submittal completes the response to Requested Actions 1) and 4).

The NRC Bulletin Requested Actions 1) and 4), and the GGES response are:

Daquantad letinn 1 verify the operability of all pumps which draw suction from the suppression pool when performing their safety functions (e.g., ECCS, containment spray, etc.), based on an evaluation of suppression pool and suction strainer cleanliness conditions. This evaluation should be based on the pool and strainer conditions during the last inspection or cleaning and an assessment of the potential for the introduction of debris or other materials that could clog the strainers since the pool was last cleaned.

nave n..nnn.a The initial GGNS response to this Requested Action addressed the verification of operability of all pumps which draw suction from the suppression pool. The initial response did not address the potential for the introduction of debris or other materials that could clog the strainers since the pool was last cleaned, due to the light debris found on the RER "A" and "B" suction strainers.

The debris found on these two strainers was sent to the General Electric Materials Characterization Laboratory. Analysis revealed that the debris represented an assortment of materials - nylon, polyester, polypropylene, and polyethylene.

Several candidate materials used to support refueling outage work were sent to the same facility for possible identification as the source of the debris. Some of the items were possible contributors, but none were sole contributors.

During the last refueling outage, the suppression pool was cleaned prior to the termination of significant containment work activities. Recent assessments of the RHR strainer debris event determined that the timeliness of suppression pool cleaning should be optimized to coincide with the end of containment work activities during refueling outages. Therefore, any debris that is introduced into the suppression pool as a result of refueling outage maintenance activities will be removed during the post cleaning process. Also, GGNS has implemented a separate Foreign Material Exclusion (FME) procedure which incorporates several safeguards regarding suppression pool cleanliness.

GGNS will continue to modify and enhance the FME process to provide assurance that the ECCS suppression pool strainers will remain free from operational debris.

Attachm:nt 1 to GNRO 96/00080 Page 3 of 3 Raquamend Antinn d Review FME procedures and their implementation to determine whether adequate control of materials in the drywell, suppression pool, and systems that interface with the suppression pool exists. This review should determine if comprehensive FMI controls have been established to prevent materials that could potentially impact ECCS operation from being introduced into the suppression pool, and whether workers are sufficiently aware of their responsibilities regarding FME.

Any j

identified weaknesses should be corrected.

In addition, the effectiveness of the FME controls since the last time the suppression pool was cleaned and the ECCS strainers inspected, and the impact that any weaknesses noted may have on the operability of the ECCS should be assessed.

GGNR nampanna In response to the Institute of Nuclear Power Operations SOER 95-1,

" Reducing Events From Foreign Material Intrusion", GGNS has been developing a new plant program that provides additional guidance regarding FME.

An independent FME procedure has been recently issued, and training is in progress to inform plant personnel of j

programmatic changes resulting from this new procedure. Several sections of this new procedure alert plant personnel to the prevention of foreign material into systems or components that could potentially block or clog the suppression pool suction strainers. Also, the existing procedure related to housekeeping has been revised to require the suppression pool and strainers to be inspected prior to each plant startup and on a periodic basis during plant power operations, and establishes an acceptance criteria. Plant personnel are required to be trained on the housekeeping procedure to familiarize them with the necessities and requirements of housekeeping and cleanliness control.

The new FME procedure and the housekeeping procedure require all personnel to report any items dropped in the suppression pool to the control room shift superintendent / supervisor. Each procedure also provides guidelines regarding control of materials that could potentially clog a suppression pool suction strainer if left inside of containment, and thereby transported to the suppression pool during a design basis loss-of-coolant accident.

On June 6, 1996, GGNS experienced a plant transient similar in nature to the event described in NRC Bulletin 95-02.

An inadvertent opening of six Main Steam Safety / Relief Valves required simultaneous operation of both loops of the Residual Heat Removal System in the suppression pool cooling mode. After this event, the ECCS suppression pool strainers were inspected and found to be clean, with the exception of the light dusting of fine silt that coats the suppression pool horizontal surfaces during each operational cycle.

The incorporation of a new FME program, in addition to the previously described enhancements regarding suppression pool cleanliness, provides reasonable assurance that the suppression pool suction strainers will perform their intended function during all modes of plant operation.

- - -... ~.. ~ -

.~.

-~

i EEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF 29 DOCKET NO. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.

and j

SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION l

and ENTERGY OPERATIONS, INC.

AFFIRMATTOM I, M. J. Meisner, being duly sworn, state that I am Director, Nuclear Safety and Regulatory Affairs, GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this follow-up response to NRC Bulletin 95-02 for the Grand Gulf Nuclear Station; that I signed this application as Director, Nuclear Safety and Regulatory Affair, GGNS of Entergy Operations, Inc.;

cnd that the statements made and the matters t fort therein are tstus and correct to the best of my knowledge, informa on pn olief.%

2

[

. Meisner STATE OF MISSISSIPPI COUNTY OF CLAIBORNE j

SUBSCRIBED AND SWORN TO before me, a Notary Public, in and for the County and State above named, this N

day of Oc/ odes-1996.

(SEAL) h W /"

Notary Public

__w,,on 4mmion exoirest frr COMMISSION EXMR-xm osmraws NOTARY PLTUC soma rasu samu,ES JU.W 5,1998 norm snm