Monthly Operating Repts for Jan 1993 for McGuire Nuclear Station
ML20128K215
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/31/1993
From: Mccraw E, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20128K219 List:
References
NUDOCS 9302180101
Download: ML20128K215 (10)


Text

- - - _ - _ _ _ _ - _ _ _ __.

4 a

OPEEAi!NS DATA FEFORT 000iEl N3 50-369 LATE htryJrv 15,1993 OPAlthsSTA31 COMFLETEDEf__R.A.Wallins_

ILLEfHDNE 7M-362-534

1. Unit hast N:3ute 1
2. Feporting Pericdt January 1, 1993-January 31,1993
3. Licensed Thersal Fower (MWilt 3411
4. Naceplate Rating (fross Neh 13056 htes tNaseplate Fating
5. Design Eler.trir.41 Pating (Net FWelt 1180 (Grcss Ne) calcul&ted as
6. Marious Dependable Capacity (Srcss Neh

!!71 10 0.000 MVA x.90 power

7. Marisen Dependable Capatity (Net Ne):

1129 factor per Page tii,

9. If Changes Occur in Capacity Rttings (Itess haber 3 Thrcegh 7) Since last NURE0-0020.

Report. Stye Reasons

9. Paer Level To With Restricted, if Any (Net Ne):
10. Reatn Fcr Restrictions, if anf __

This M ath Yr. to-Date Cuwlathe

11. Hours in Reportirig feriod 74.0 7%.0 97920.0
12. NAer Of Hours Peactor Was Critical
  • /H.0 7H.0 69600.2-13, Reacter Reserve Shutdo n Hours

--0--

--0--

--0--

14. Hours Ger,erator On-Line 74.9 74 0

-68366.5

15. Unit Reserve Shutdown Hours

- --0--

--0--

16. Gross Thersal Etergy 6entated (NH, ES34P.4 250424 212317 % 5
17. Gross Electrical Energy Gercrated (MWHI E79176 879176 73054506
18. Net Elettrical Energy Generated (M)

B42062 849M2

-69764397

19. Unit Service Facter 100.0 100.0 70,3
20. Uutt Availability factor 100.0 100.0 70.3
21. Unit Capacity Fa: tor (U$ tag MDC Net) 101.0 101.9 61.'
22. Unit Capacity Factor (Using DER Net) 96.6 9 6.f.

60.4

23. Unit Forced Outage Rate 0A 0.0 13,4
24. Snutconn Scheduled Over Nett 6 Mnths (Type, Date, and Duration of EacMt Refueling :_ hrrlLl L l993
84. days
25. If Shut Down At End Of Report Period. Estiaated Date of Startuct__ _

26, Units In Test Statns (Prior to Costercial Operationl:

Ferecast Achieved

(

INITML CRITICAllIV th!TIAL ELECTRICITY C0hMERCIAL 0FERA110h 9302100101 9'A131 l

PDR ADOCK 05000369 I

PDR R

m.

'~

i f 'i.

1* ) I:'

l '_

i _

~_

.. c

' ^

~. _

1

-DPEAATINGDATAREPORT; d

l DOCKETT3:

50-369:

~ lMIT i - McGuire 1-d

" DATE February 15i 1993 ~

1 l'~

Il COTLETED SY R.A. Williset-

-TELEPHONE-7D4-3B!-53461 q

i

B0hTH

.tanuarL 1993

]

,j pfl -

AVERAGE DAILY P0hER LEVEL Qff t,VERA6EDAILYPOWERlEVEL (NWe h t)

(MWe-Net)-

')

4 1140 17 1142---

1 i

.2

-1139 18 1144 3

1139 19 1142-4 1139 20 1141-5 1140 21 1141

-. 1 6-

!!39__ _

22 t143 --

.7

'1139 23 1123

-8 1138 24 t143 9

"!!36 25-114L

...10 1137 26 1141-

-!!32 27 1141 u

12 1139 29 1162

' 1140 29 1143'

.. 1141

-30 1143 f15 li40 31

-1143 m 1140 j.

(

.9

{

.,_m.",___g

~

u

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME rtwuixt. 1 DATE ue/la/va REPORT MONTH January 1993 COMPLETED BY 14.

c.

dirmurid TELEPHONE t/us;-aue-neoa (1)

{2)

(4)

(5) 3 E

HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE-NO SHUTDOWNS OR REDUCTION S

t (1gForced (2

(3) ethod:

(4 eason:

M xhibit G - Instructions S Scheduled A-Equi ment FailureB-Mainkensnceortest(Explain) 1-Manual for Preparation of Data 2-Manual Scram EntW Sheets For Licensee 1 C-Refueling 3-Automatic Scram Event Renort:(LER)

D-Regulatory Restri.ction 4-Other-(Explain)

File (NUREG-Ol61)

E-Operator Training & License Examination F-Administrative (5

H-Other (Explain) (Explain) xhibit I - Same Source G-Operator Error

-d -

DOCKET: 50-369 UNIT: McGuire 1 Date: 02/15/93 NARRATNE

SUMMARY

MONTH: Janusy 1993 McGuire Unit 1 began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.

. -i

.,}

Prepared by N. C. Simmonc

'j Telephone:- 704-382-5263

~-'

= -.

1 MONTHLY REFUELING INFORMATIQN REOUEST 1.

Facility name: McGuire._ Unit 1 2.-

Scheduled next refueling shutdown: March 1993 i

3.

Scheduled restart following refueling: June 1931 THE PROJECT MANAGER hAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT.

THEREFCRE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l 4.

Will refueling or resumption of operation thereafter require'a technical specification change or other license amendment?

[

If yes, what will these be?

l If no, has reload design and core configuration been reviewed by Safety Review Co_unittee regarding unreviewed safety questions?.

5.

Scheduled date(s) for submitting proposed licensinct action-and supporting information.

6.

Important licensing considerations (new or.different design' or

supplier, unreviewed design or performance analysis methods, significant changes in design or now. operating procedures).

7.

Number of Fuel assemblies (a) in the core: ~122 l

(b) in the spent fuel pool: 52 2 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected. date of last refueling which can be accommodated z by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:

February 15. 1993 l.-

Name of

Contact:

N.

C.

Eimmons Phone:

704-382-52C3 i:

p

4 6 ~

Ie.

OPERAtlkBDATAREPORT 1

DOCKET NO' 50 370-DATE February 15. 1993 0]PjkAT10 STATUS _

COMFLETEDBY R. A. Willitsi,_,

TELEfSONE 704-382-5346

!. Lvit Naset Mcfwire 2

2. Feperting Periode heuary 1,~ 1993-Ja9uary 31,1993
3. Licetted thereal fewer ( N t):

3411

4. Wase,olate Rating (Bross MWeb 1305a Notes fNaseplate Rating.
5. Design Electrical Rating (Net MWe):

!!B0 (Brcss MWel calculated as-

' 6. Muisue Dependable Capcity ' Gross MWeh

!!?!

1450.000.Td x.90 power--

7, Muieus Dependable Captity tWet MWe h 1129

-fhter per Page ill,.

9. If Changes Ccter in Capacity Ratings (Ittes Husber 3 Through 71 Since Last-NURES-0020.

Peport. Sive Reasons:

I

9. Fuer Level Ic Writh FMtrictad, If Any (Net ftWeh 10, Reann for Restrictions, lf anyt n

i r

This Month Yr.-to-Cate Cueulative

!!. Hours In Reporting Feriod 744.0 744.0 -

78216.0

12. Nucer Of Hours Reacter Was Critical 744.0 744,0-60160.4
13. Reacter Reserve Sheldan Hours ~- - - -14. Fours Benerater On-Line 744,0' 744.0 59241.1' 15.: 1: nit Reserve Shutdenn Hours

~0-

--0 --

--0---

16. Brass Thereal Energy Generated (KWH) 2525240 2525260:

.193932816

17. Gross Electrical Energy Generated (MiiH)

-899257 689257 67808958

18. Net Electrital Energy Generated (MWH) 856034-B56034-65016999

'19.UnitServiceFactor 100.0 100.0 75.7 1

20. Ur,it Availabihty factor 100.0 100.0-75.7.
21. (Mit Cancity farter (Osly MDC Net) 101.9 101.9 72.7
22. Unit Capacity factor h ing EER Neti 97.5 97.5

'70.5;

23. Unit forced Cutage Rate 0.0

-0.0 7.5

24. Shutdenn khedated Oyer NDI 6 Nonth5 (Typt, Date, and Duration of Eachh Rof4814ng-. -July 01,- 1993

- 75 days

25. If Shut town At End Of Report Period. Estimated Date of Startup:
26. (! nits-In Test Status (Prior to Cramercial Operation):

Forecast khieYed.

n

!!ililAL CRITICALITY INIIIAL LLECTRICITY CCMMERCIAl.GFEFATICN

0?ERMING LATA REFORT DOCLET WO S0-370 Uhl1 McGuire 2 IATE [.ebf bity 15. 1993 COMPLETED BY R.A. Wilities TELEFHCNE 704-382-5346 MONTH _ _Ianuary. 1993 CAV MEREE MILY PCWER LEVEL.

DAY AVERABE DAILV POWER LEVEL (F.We-Ne t )

(Pie-Net) 1 1154 17 1135 2

1153 18 1155 3

1153 19 1154 4

1154 20 1169 5

1154 21 1152 6

1154 22 1155 7

1154 23 1046 8

1154 24 1154 9

1154 25 1154 10 1153 26 1154 11 1154 27 1154 12 1157 28 1155 13 1154 29 11ti 30 1155 14 1154 15 1155 31 1156 16 1155

UNIT SHUTDOWNS AND POWER REDUCTIONS DCCKET NO.

50-370 UNIT NAME Muuulut, e DATE uzflofva REPORT MONTH January 1993 COMPLETED BY n.

u.

simiund TELEPHONE t s uc i-auz-ozt>;

e (1) 2)

(4)

(5)

E HOD T-A OF LICENSE

~H Y

S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS

  • N R/X NO.

CODE CODE PREVENT RECURRENCE

.1-P 93-1-23 S

B HB VALVEX CONTROL VALVE MOVEMENT TEST

!t 1

i l

1

- (1) '

(2)

(3)

(4)

F. Forced Reason-Method:

Exhibit G -~Tnstructions S Scheduled it-Equipment FailureB-Maintenance or test (Explain)-

1-Manual for Preparation of Data 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory. Restriction 4-Other (Explain)

File E-OgeratorTraining&LicenseExamination S $r E H-O her (Explain) (Explain) xhibit I - Same Scurce

DOCKET: 50-370 UNIT:

McGuire2 Date: 02/15/93 NARRATIVE

SUMMARY

MONTH: January 1992 McGuire Unit 2 began the month of January oporating at 100% full power. The unit operated at or near-100% full power until 1/23 at OMO when power was reduced to 75% power. The unit was held at 75%

power from 0605 to 1018 for " *urbine control valve movement test. The unit was returned to 100% full power at 1856. The unit ope. ";d at or near 100% for the remalnaer of the mont'.

Prepared by N. C. Simmons Telephone: 704-382-5263

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: McGuire.

Umit_2 2.

Scheduled next refueling shutdown: July 1993 3.

Scheduled restart following refueling: _Seotember 1993 THE PROJECT MANAGER HAS BEEN ADVISED-BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT.

THEREFORE, QUESTIONS 4-THROUGH 6 WILL NO LONG2R BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation' thereaf ter require a technical specification change or other license amendment?

If yes, what will these be?

-q If no, has reload design and core configuration beenfreviewed by_

l Safety Review Committee regarding unreviewed safety questions?

S.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or

supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: J_9_3 L

(b) in the synt -fuel pool: 2n l-8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: __-

j_

9.

Projected date of last refueling which can be accommodated by I

present licensed capacity: December 2003 DUKE POWER COMPANY DATE:

February 15. 1993 Name of

Contact:

N.

C.

Simmens Phone:

704-382-5263 l

l l